TGI_3819P123AGT03_c0v0.pdf
PDF 25 KB Posted
- Solicitation number
- N6264925RA059-0008
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, dated 02-MAY-2025, focusing on a High Pressure Steam Drain System Tightness & Operational Test. The task involves three primary work groups: Contractor (22/KE), Quality Assurance (33/G1), and Ship's Force (EM01), each responsible for accomplishing and documenting the tightness and operational test in accordance with reference document TP 25811-3-300KTR. The instruction is classified as FOUO (For Official Use Only) and involves testing of the ship's high-pressure steam drain system, with the work to be performed on the USS Blue Ridge (LCC-19) under Project 19P and System 25811.
View the file
Other files
Show 40 more
Latest 50 of 90 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
02-MAY-2025 1700
20.14.15.2.9020 (September 2024) ICN: 3819P123AG KeyOp: T03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 25811-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 25811
CU PHASE TITLE: HIGH PRESSURE STEAM DRAIN SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EM01L261
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
NAGASHIMA, HISAO 246.2 3152439944 22-APR-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 25-APR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM01-L261
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A41AG
Tightness & Operational Test for High Pressure Steam Drain System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
02-MAY-2025 1700
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P123AG KeyOp: T03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 25811-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 25811
CU PHASE TITLE: HIGH PRESSURE STEAM DRAIN SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 25811-3-300KTR HIGH PRESSURE STEAM
DRAIN SYS (T & OP) - KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 25811-3-300KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 25811-3-300KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 25811-3-300KTR.
/ EM01 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P123AG KEY OP: T03