3819P22115A09_c0v1_FY26_TGI.pdf
PDF 144 KB Posted
- Solicitation number
- N6264925RA059-0008
About this file
This document is a Task Group Instruction (TGI) for cleaning and inspecting the 1B Boiler Forced Draft Blowers (FDB) on the USS Blue Ridge (LCC-19), with a planned contractor work period from 7/21/2026 to 11/21/2027. The task involves a detailed visual inspection of housing and base assemblies, Variable Inlet Vane (VIV) assemblies, and inlet screens for two boiler forced draft blowers manufactured by New Philadelphia Fan Co.
Key procedural requirements include removing and reinstalling access doors, cleaning exposed parts, adjusting VIV assemblies, and performing brush-off blast cleaning. The work will take place in multiple ship locations including the Uptake Space, Blower Room, and Fire Room. Additional support services will be provided by SRF-JRMC, including crane and rigging services, utility services (electrical, low pressure air, water, and steam), and safety and quality assurance inspections. The instruction notes potential asbestos and lead hazards, and requires specific material replacements like gaskets and fasteners that must meet military specification standards.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: 1B BLR FDB AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
*(N12-01) F/O - CLEAN AND INSPECT EACH 1B BOILER FORCED DRAFT BLOWER
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
KOUKI NAKAMURA 232. 315-243-0090 21-FEB-2025
APPROVED BY: CODE PHONE DATE
HIDEMI SENDA 232. 315-243-5615 21-FEB-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: 1B BLR FDB AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/1
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J-1 M1-2
1. SCOPE/PURPOSE:
1.1 Title: Each 1B Boiler Forced Draft Blower (FDB); clean and inspect
1.2 Location of Work:
1.2.1 Uptake Space (5-76-0-Q)
1.2.2 Blower Room (5-79-0-E)
1.2.3 Fire Room (8-76-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), 1B Boiler 1B1 FDB
Mfr: New Philadelphia Fan Co Mfr Id: 980A838
APL: 400060761
1.3.1.1 Quantity (One EA), Housing and Base Assembly
PC No: One of 2.4
1.3.1.2 Quantity (One EA), Variable Inlet Vane (VIV) and Linkage Assembly PC No: 34 of 2.4 Remarks: See 2.5 and Figure 1-6-2 of 2.6 for details
1.3.2 Quantity (One EA), Housing for 1B1 FDB
Remarks: See DET 9-C of 2.3 and 2.8 for details
1.3.3 Quantity (One EA), Inlet Screen for 1B1 FDB
Remarks: See DET 9-A of 2.3 and 2.8 for details
1.3.4 Quantity (One EA), 1B Boiler 1B2 FDB
Mfr: New Philadelphia Fan Co Mfr Id: 980A838
APL: 400060761
1.3.4.1 Quantity (One EA), Housing and Base Assembly
PC No: One of 2.4
1.3.4.2 Quantity (One EA), Variable Inlet Vane (VIV) and Linkage Assembly PC No: 34 of 2.4 Remarks: See 2.5 and Figure 1-6-2 of 2.6 for details
1.3.5 Quantity (One EA), Housing for 1B2 FDB
Remarks: See DET 9-C of 2.3 and 2.8 for details
1.3.6 Quantity (One EA), Inlet Screen for 1B2 FDB
Remarks: See DET 9-A of 2.3 and 2.8 for details
FOUO
SHIP: LCC-19 CHG/VER: 0/1
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.5.2 Potential Lead Hazard.
1.6 Contractor work start date: 7/21/2026
1.7 Contractor work completion date: 11/21/2027
2. REFERENCES:
REF.
NO.
DOCUMENT/
DRAWING
NUMBER
DOCUMENT/DRAWING
TITLE
REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 204-
2492046 F.D Blower Ducts - DETS C Y 9
4 DWG 9W-
64485
CENTRIFUGAL FAN SIZE
980-A838 OUTLINE &
ASSEMBLY MAIN FORCED
DRAFT BLOWER
G Y ALL
5 DWG 9W-
64486
VARIABLE INLET VANE &
LINKAGE ARR FOR
CENTRIFUGAL FAN SIZE
980-A838
F Y ALL
6 TM S9221-E7-
OMI-010
Main Forced Draft Blower - Y SEE
NOTE
7 DWG 204-
2492045
Forced Draft System - DIAG E Y ALL
8 DWG 205-
2492051
Uptakes, Upper, Lower, DK CONNS, FDB DISCH Ducts, Trash Burner Uptake - ARR
C Y 2,4
9 TM SYSTEMS
SPECIFICATI
ONS
SSPC Painting Manual Volume 2
- N
3. APPENDICES:
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish a visual inspection of each housing and base assembly listed in 1.3.1.1 and 1.3.4.1, each VIV assembly listed in 1.3.1.2 and 1.3.4.2, and each inlet screen listed in 1.3.3 and 1.3.6, using 2.3 through 2.5 and Paragraph 1-4-4 of 2.6.
(V) “VISUAL INSPECTION”
FOUO
SHIP: LCC-19 CHG/VER: 0/1
5.1.1 Remove and install each access door of each housing and base assembly listed in 1.3.1.1 and 1.3.4.1, each housing listed in 1.3.2 and 1.3.5, and each inlet screen listed in 1.3.3 and 1.3.6, using 2.3, 2.4, 2.7 and 2.8 for guidance.
5.1.1.1 Restore each mating surface exposed by removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tool.
5.1.1.2 Remove existing and install new each fastener and gasket for each access door of each housing and base assembly. Self-locking nuts must conform to MS17829, non-corrosion resistant steel. Gaskets must conform to MIL- DTL-24696, Type I or equal.
5.1.1.3 Remove existing and install new each fastener and gasket for each housing. Screws must conform to MIL- DTL-1222, Type I, Grade 5, Carbon Steel. Gaskets must conform to HH-P-31, Type I, Class One or equal.
5.1.2 Clean each exposed part free of foreign matter, leaving no residue or injurious effects.
5.1.3 Adjust each VIV assembly, using Paragraph 1-4-4 of 2.6 for guidance.
5.1.4 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.1 to the SUPERVISOR.
5.2 Accomplish the requirements of 009-32 of 2.1, including Table 5, Line(s) 18, for each equipment listed in 1.3.3 and 1.3.6.
5.2.1 Brush-off blast clean for each equipment. Accomplish each requirement of Surface Preparation Specification SSPC-SP 7 of 2.9.
5.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.4 Notes:
5.4.1 Planner: Code 232 K. Nakamura, 070-7787-1977
Planner: Code 231B M. Maeda, 243-6101 Engineer: Code 250 Y. Gouriki, 243-4179
5.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.4.3 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line item N12-01.
5.4.4 WPC will copy the following pages in reference.
REF. 2.6: Pages 1-14, 1-15 and 1-25.
5.4.5 JCN EM02-L192 is related to this TGI.
5.5 SRF-JRMC will provide GFM listed in Appendix “M”.
5.6 SRF-JRMC will provide the following service work: (TGI No. 3819P22115S10)
5.6.1 [C740] Crane and crane rigging service.
5.6.2 [X99E] Utility service, electrical.
5.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
FOUO
SHIP: LCC-19 CHG/VER: 0/1
5.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.6.6 [C133] QA inspection for (G) Symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/1
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
1B BLR FDB AY A 0 1
CU PHASE TITLE:
*(N12-01) F/O - CLEAN AND INSPECT EACH 1B BOILER FORCED DRAFT BLOWER
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
#1B1 FDB FA #1B2 FDB FA
ATTACHMENT LIST:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
SUGANO ,CHIHARU
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P22115 A09
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to clean and inspect Each 1B Boiler Forced Draft Blower (FDB).
Location of Work:
Uptake Space (5-76-0-Q) Blower Room (5-79-0-E) Fire Room (8-76-0-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 OMCH HRs, RGRS HRs 22 KE PC
5.2 PNTR HRs, QA H 22 KE PC
5.3 PNTR HRs, QA H 22 KE PC
Machinery Work CFM for Asbestos Abatement and Misc (plastic sheets/bags and other consumable).
22 MQ CS
Preservation Work CFM for all paints, thinners, grits, disposal cost, sampler/analyze lead, and MISC such as other consumable.
22 MQ CS
Process Funding Document. 10 CT OM
Version-01: Admin Change.
Code 232 T. Kinoshita, 02/21/2025, -/-/N
V-01
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/1
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
1B BLR FDB AY A 0 1
CU PHASE TITLE:
*(N12-01) F/O - CLEAN AND INSPECT EACH 1B BOILER FORCED DRAFT BLOWER
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P22115 A09
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M GASKET, ORIG: C232 K.
NAKAMURA, 070-7787-1977
ORDERED FOR KTR
1/8” THK, MIL-DTL-24696 TY I
FOR ACCESS DOOR
9B 5330 014197727 NA 4 N 50495047 1/EA
002 M NUT,SELF, ORIG: C232 K.
NAKAMURA, 070-7787-1977
ORDERED FOR KTR
3/8"-16UNC-3B, MS17829-6C
FOR ACCESS DOOR
9B 5310 004838790 NA 4 N 50495072 32/EA
003 M GASKET, FIBROUS GLAS,
ORIG: C232 K. NAKAMURA,
070-7787-1977
ORDERED FOR KTR
FOR HOUSING
GASKET, FIBROUS GLASS,
WIRE-REINFORCED PLAIN,
CLOTH, SPEC: HH-P-31, TYPE
I, CLASS 1, SIZE: 60" X 60" X
1/16"THICKNESS, REMARKS:
NON ASBESTOS REQUIRED
NA 4 N 2/SH
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
004 M GASKET, FIBROUS GLAS,
ORIG: C232 K. NAKAMURA,
070-7787-1977
ORDERED FOR KTR
FOR HOUSING
GASKET, FIBROUS GLASS,
WIRE-REINFORCED PLAIN,
CLOTH, SPEC: HH-P-31, TYPE
I, CLASS 1, SIZE: 60" X 60" X
1/8"THICKNESS, REMARKS:
NON ASBESTOS REQUIRED
LL9003533 NA 4 N 2/SH
005 M SCREW, HEX CAP, ORIG: C232
K. NAKAMURA, 070-7787-1977
ORDERED FOR KTR
FOR HOUSING
SCREW, HEX CAP, SIZE: 1/2"-
13UNC-2A X 1-1/2"LG, MATL:
STEEL GR-5, MIL-DTL-1222
TYPE 1, GRADE 5, ZINC
COATING
LL9300703 NA 4 N
180/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 1B BLR FDB AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P22115 A09
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 1B BLR FDB AY A 0