3819P22115A01_c1v1_FY26_TGI.pdf

PDF 212 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 7 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA059-0008
Issued by

About this file

This Task Group Instruction (TGI) details preservation work for the USS Blue Ridge's Fire Room (8-76-0-E), specifically the bilge area and boiler foundation. The work involves pumping out, cleaning, and drying a 743 square foot area, with potential lead hazards and critical coating requirements. The contractor work is scheduled from 7/21/2026 to 11/21/2027, in response to a Boiler Inspection and Repair Management Information System (BIRMIS) report dated 17 OCT 2024.

The Ship Repair Facility-Japan Regional Maintenance Center (SRF-JRMC) will provide supporting services including crane and rigger service, utility services (electrical, low pressure air, water, and steam), safety inspections, gas-free inspections, and quality assurance inspections. The project involves preservation work with careful handling of paints, thinners, and lead sampling, with the work to be performed in a specific zone between frames 75 and 81 on the port side of the ship's inner bottom.

View the file

Other files

File Type Posted
N6264925RA059-0009.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R2.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
3819P22115A06_c0v0_FY26_TGI.pdf PDF
TGI_3819P22115T01_c0v0.pdf PDF
3819P25001T04_c0v0_TGI.pdf PDF
3819P22114A15_c0v0_FY26_TGI.pdf PDF
3819P22114A07_c1v1_FY26_TGI.pdf PDF
3819P123ACA01_c0v0_FY26_TGI.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
3819P22114A17_c0v0_FY26_TGI.pdf PDF
3819P22115A05_c0v0_FY26_TGI.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
3819P25507A01_c0v0_FY26_TGI.pdf PDF
3819P22114A16_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0005.pdf PDF
3819P22115A07_c0v0_FY26_TGI.pdf PDF
3819P22114A06_c1v1_FY26_TGI.pdf PDF
3819P22114A01_c0v0_FY26_TGI.pdf PDF
3819P22115A02_c1v1_FY26_TGI.pdf PDF
Attachment III Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
3819P25606A01_c0v1_FY26_TGI.pdf PDF
TGI_3819P123AGT09_c0v0.pdf PDF
3819P123AGA01_c1v1_FY26_TGI.pdf PDF
3819P22115A12_c0v0_FY26_TGI.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
3819P22114A13_c0v1_FY26_TGI.pdf PDF
N6264925RA059-0001.pdf PDF
3819P22114A12_c0v1_FY26_TGI.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
3819P25201A01_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0008.pdf PDF
3819P22115A13_c0v0_FY26_TGI.pdf PDF
3819P22114A03_c2v2_FY26_TGI.pdf PDF
TGI_3819P22114T01_c0v0.pdf PDF
TGI_3819P22114T02_c0v0.pdf PDF
3819P22115A09_c0v1_FY26_TGI.pdf PDF
3819P22114A08_c1v1_FY26_TGI.pdf PDF
TGI_3819P123AGT03_c0v0.pdf PDF
TGI_3819P123AGT07_c0v0.pdf PDF
3819P25001T05_c0v0_TGI.pdf PDF
3819P22115A08_c0v0_FY26_TGI.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
3819P22114A11_c1v2_FY26_TGI.pdf PDF
3819P22114A02_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0006.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
3819P26001A01_c0v0_FY26_TGI.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

04-MAR-2025 1459

20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-76-0-E MS A 2 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 13011

CU PHASE TITLE: *(BIRMIS) F/O - PRESERVE BILGE AREA AND FOUNDATION IN 8-76-0-E

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

EM02L192

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

MAEDA, MITSUO 231B 3152436101 22-JAN-2025

APPROVED BY: CODE: PHONE: DATE:

NAKANO, SEIICHI 231B 3152434519 22-JAN-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L192

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

TAKAHASHI, YASUHIKO 8-76-0-E 8 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1115

1 SCOPE/PURPOSE:

1.1 Title: Bilge Area and Foundation in 8-76-0-E; preserve

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (743 SF), Bilge Area including Boiler Foundation in 8-76-0-E, Frame between 75 and 81, Port

Remarks: The area is surface where mechanical tool, roller, and brush can be reachable and the area except chock and fastener.

See Sketch Enclosure-01 for location detail.

1.4 Security Classification: None.

TGI Short Form

04-MAR-2025 1459

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-76-0-E MS A 2 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 13011

CU PHASE TITLE: *(BIRMIS) F/O - PRESERVE BILGE AREA AND FOUNDATION IN 8-76-0-E

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.5 Initial Condition:

1.5.1 Potential Lead Hazard

1.5.2 Critical Coated Area: CCNY-LCC19-069-25 for the area listed in 1.3.1.

1.6 Contractor Work start date: 7/21/2026

1.7 Contractor Work completion date: 11/21/2027

2 PROCEDURE:

2.1 Pump out, clean, and dry each space located in 1.2.1 to free from oil, debris, and other foreign matter.

2.2 Accomplish the requirements of 009-32 of Ref. No One, including Table 3, Line(s) 13, for each area listed in 1.3.1.

2.3 Notes:

2.3.1 Planner: Code 231B M. Maeda, 243-6101

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 Provision of oily/chemical water barge will be coordinated by Project Team.

2.3.4 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line Item(s) D74C-01, E-01, and E-02.

2.3.5 JCN EM02-L192 is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC will provide the following service work: (TGI No. 3819P22115S02)

2.5.1 [C740] Crane and crane rigger service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbol(s) and review coating application data.

04-MAR-2025 1459

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-76-0-E MS A 2 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 13011

CU PHASE TITLE: *(BIRMIS) F/O - PRESERVE BILGE AREA AND FOUNDATION IN 8-76-0-E

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 LBR: HRs 22/KE PC N

2.2 PNTR: HRs, SFTR: HRs, QA: HRs 22/KE PC N

Preservation Work CFM for all paints, thinners, sampler/analyze for lead, and MISC such as covering material and other consumable

22/MQ CS N

Process Funding Document 10/CT OM N

Version-01: correct paragraph 2.3.5. C231B S. Nakano, 01/22/2025. -/- /N.

/ V-01 N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P22115A01-Sketch.pdf 21-JAN-2025 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22115 KEY OP: A01

B

A

Sketch Enclosure-01

KEY PLAN

INNER BOTTOM

3819P22115A01 SHEET 1 OF 2

DET 2-A

CHOCK AND FASTENER

LKG FWD

DET 2-B

CHOCK AND FASTENER

LKG AFT

Sketch Enclosure-013819P22115A01 SHEET 2 OF 2

File details come from the government source that posted it. Updated .