This Task Group Instruction (TGI) details preservation work for the USS Blue Ridge's Fire Room (8-76-0-E), specifically the bilge area and boiler foundation. The work involves pumping out, cleaning, and drying a 743 square foot area, with potential lead hazards and critical coating requirements. The contractor work is scheduled from 7/21/2026 to 11/21/2027, in response to a Boiler Inspection and Repair Management Information System (BIRMIS) report dated 17 OCT 2024.
The Ship Repair Facility-Japan Regional Maintenance Center (SRF-JRMC) will provide supporting services including crane and rigger service, utility services (electrical, low pressure air, water, and steam), safety inspections, gas-free inspections, and quality assurance inspections. The project involves preservation work with careful handling of paints, thinners, and lead sampling, with the work to be performed in a specific zone between frames 75 and 81 on the port side of the ship's inner bottom.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
04-MAR-2025 1459
20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-76-0-E MS A 2 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13011
CU PHASE TITLE: *(BIRMIS) F/O - PRESERVE BILGE AREA AND FOUNDATION IN 8-76-0-E
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
EM02L192
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
MAEDA, MITSUO 231B 3152436101 22-JAN-2025
APPROVED BY: CODE: PHONE: DATE:
NAKANO, SEIICHI 231B 3152434519 22-JAN-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM02-L192
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI, YASUHIKO 8-76-0-E 8 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
221A1115
1 SCOPE/PURPOSE:
1.1 Title: Bilge Area and Foundation in 8-76-0-E; preserve
1.2 Location of Work:
1.2.1 Fire Room (8-76-0-E)
1.3 Identification:
1.3.1 Quantity (743 SF), Bilge Area including Boiler Foundation in 8-76-0-E, Frame between 75 and 81, Port
Remarks: The area is surface where mechanical tool, roller, and brush can be reachable and the area except chock and fastener.
See Sketch Enclosure-01 for location detail.
1.4 Security Classification: None.
TGI Short Form
04-MAR-2025 1459
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-76-0-E MS A 2 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13011
CU PHASE TITLE: *(BIRMIS) F/O - PRESERVE BILGE AREA AND FOUNDATION IN 8-76-0-E
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.5 Initial Condition:
1.5.1 Potential Lead Hazard
1.5.2 Critical Coated Area: CCNY-LCC19-069-25 for the area listed in 1.3.1.
1.6 Contractor Work start date: 7/21/2026
1.7 Contractor Work completion date: 11/21/2027
2 PROCEDURE:
2.1 Pump out, clean, and dry each space located in 1.2.1 to free from oil, debris, and other foreign matter.
2.2 Accomplish the requirements of 009-32 of Ref. No One, including Table 3, Line(s) 13, for each area listed in 1.3.1.
2.3 Notes:
2.3.1 Planner: Code 231B M. Maeda, 243-6101
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.3.3 Provision of oily/chemical water barge will be coordinated by Project Team.
2.3.4 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line Item(s) D74C-01, E-01, and E-02.
2.3.5 JCN EM02-L192 is related to this TGI.
2.4 Government Furnished Material (GFM): None.
2.5 SRF-JRMC will provide the following service work: (TGI No. 3819P22115S02)
2.5.1 [C740] Crane and crane rigger service.
2.5.2 [X99E] Utility service, electrical.
2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.5.6 [C133] QA inspection for (G) symbol(s) and review coating application data.
04-MAR-2025 1459
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-76-0-E MS A 2 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13011
CU PHASE TITLE: *(BIRMIS) F/O - PRESERVE BILGE AREA AND FOUNDATION IN 8-76-0-E
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 LBR: HRs 22/KE PC N
2.2 PNTR: HRs, SFTR: HRs, QA: HRs 22/KE PC N
Preservation Work CFM for all paints, thinners, sampler/analyze for lead, and MISC such as covering material and other consumable
22/MQ CS N
Process Funding Document 10/CT OM N
Version-01: correct paragraph 2.3.5. C231B S. Nakano, 01/22/2025. -/- /N.
/ V-01 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 3819P22115A01-Sketch.pdf 21-JAN-2025 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P22115 KEY OP: A01
B
A
Sketch Enclosure-01
KEY PLAN
INNER BOTTOM
3819P22115A01 SHEET 1 OF 2
DET 2-A
CHOCK AND FASTENER
LKG FWD
DET 2-B
CHOCK AND FASTENER
LKG AFT
Sketch Enclosure-013819P22115A01 SHEET 2 OF 2
File details come from the government source that posted it. Updated .