This document is a Task Group Instruction (TGI) for inspecting a main condenser scoop injection check valve on the USS Blue Ridge (LCC-19). The specific task involves removing, inspecting, and reinstalling a 36-inch tilting disc check valve manufactured by Anchor Valve Co, with a unit weight of 1,627 lbs. The inspection procedures include mechanical cleaning, visual inspection of internal parts, performance checks involving 3 complete valve cycles, a hydrostatic test at 50-51 psig for 30 minutes, and a seat tightness test at 7.5-7.6 psig for 3 minutes.
The work is scheduled to be performed between July 21, 2026, and November 21, 2027, with the primary location being the ship's Engine Room (8-86-0-E) and potentially a contractor's facility. Special requirements include cleanliness for piping/equipment at System Level III, and potential asbestos and lead hazards. The Ship Repair Facility (SRF-JRMC) will provide supporting services including crane and rigging, utility services, safety inspections, and quality assurance inspections. The job order number is 3819P25606, with a key operation code of A01.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: MN SW CLG SCOOP INJ V- A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 25611 19P
CU PHASE TITLE:
F/O - INSPECT MAIN CONDENSER SCOOP INJECTION CHECK VALVE
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
RYO HASEGAWA 232 315-243-9981 27-JAN-2025
APPROVED BY: CODE PHONE DATE
HIDEMI SENDA 232 315-243-5615 27-JAN-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING/EQUIPMENT SYSTEM LEVEL III
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: MN SW CLG SCOOP INJ V- A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/1
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-4 QA28
(2)
J-1 M1-2 Engrg Inst (1)
1. SCOPE/PURPOSE
1.1 Title: Inspection of Main Condenser Scoop Injection Check Valve; accomplish
1.2 Location of Work:
1.2.1 Engine Room (8-86-0-E)
1.2.2 Contractor’s facility
1.3 Identification:
1.3.1 Quantity (One EA), Main Condenser Scoop Injection Check Valve Mfr: Anchor Valve Co Mfr Drawing No: 2134-5 Size: 36.00 x 38.00 Inch IPS Type: Tilting Disc Check Valve Size of Tilting Disc: 36.00 Inch IPS
APL: 882036007
Unit Weight: 1627 LBS Remarks: See Item V-1 of 2.3 for details.
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Dry Dock Work.
1.5.2 Potential Asbestos Hazard.
1.5.3 Potential Lead Hazard.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 209-
2492117
MAIN CIRC SYSTEM ARRGT F Y AL
L
7/21/2026
11/21/2027
FOUO
SHIP: LCC-19 CHG/VER: 0/1
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
4 DWG 209-
2492112
AUX MACH SW COOLING SYS-
MN & AUX COND CIRC SYS-DIAG
E Y AL
L
5 DWG 2134-5 36” x 38” – 30# TILTING DISC
CHECK VALVE – CAST BRZ
FLANGED ENDS – MONEL TRIM
- Y AL
L
6 TM S9086-
RK-STM-
010/CH505
PIPING SYSTEMS 6 N
3. APPENDICES:
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable
5. PROCEDURE:
5.1 Remove each valve listed in 1.3.1, using 2.3 through 2.5 for guidance.
5.1.1 Restore each mating surface exposed by each valve removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tools.
5.2 Accomplish a inspection of each valve listed in 1.3.1, using 2.5 for guidance.
5.2.1 Clean each internal and external surface free of foreign matter (including paint), and inspect each internal part for defects for each valve listed in 1.3.1 in accordance with Enclsoure-01, using 2.5 for guidance.
5.2.2 Cycle each valve listed in 1.3.1 from fully closed to fully open to fully closed 3 times in accordance with Enclsoure-01. Allowable binding or excessive opening and closing defects: None.
(V) "VALVE CYCLING"
5.2.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean fresh water at 50 PSIG (not less than 50 PSIG and not more than 51 PSIG) for each valve listed in 1.3.1 in accordance with Enclsoure-01, using 2.5 for guidance.
5.2.3.1 Document each shop test result on QA Form 28 Enclosure-02-1.
5.2.4 Accomplish seat tightness test of each valve listed in 1.3.1 in the direction tending to close the valve (back pressure) for a minimum of 3 minutes in accordance with Enclsoure-01, using 2.5 for guidance.
5.2.4.1 Shop test equipment must conform to the requirements in Paragraph 505-11.1.3 of 2.6.
5.2.4.2 Ensure seat tightness test pressure is 7.5 PSIG (not less than 7.5 PSIG and not more than 7.6 PSIG)
5.2.4.3 Ensure test medium is clean fresh water.
5.2.4.4 Maximum allowable leakage is 3600 cubic centimeters (cc) per hour.
FOUO
SHIP: LCC-19 CHG/VER: 0/1
5.2.4.5 Leakage between the seat ring and body is not included.
(I) "SEAT TIGHTNESS TEST"
5.2.5 Document each shop test result on QA Form 28 Enclosure-02-2.
5.2.6 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.2.3 and 5.2.4 to the SUPERVISOR.
5.3 Install each valve listed in 1.3.1, using 2.3 through 2.5 for guidance.
5.3.1 Remove existing and install each new salt water piping joint gasket, conforming to MIL-PRF-1149, Type I, Class I, synthetic rubber.
5.3.2 Cycle each valve listed in 1.3.1 from fully closed to fully open to fully closed 4 times. Allowable binding: None.
(V) "VALVE CYCLING"
5.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.5 Notes:
5.5.1 Planner: Code 232 R. Hasegawa, 243-9981
Planner: Code 233 K. Uchimura, 080-9350-1432 Planner: Code 234 H. Shinmei, 243-2371 Engineer: Code 260 S. Irikura, 243-4336
5.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.5.3 This TGI is related to DFS LCC-19-1016-2022.
5.5.4 Replacement of rubber expansion joints will be covered by TGI No. 3819P25602A01 (KTR TGI).
5.5.5 Opening and closing of temporary access on port and starboard side longitudinal bulkhead and shell plating for each valve listed in 1.3.1 will be covered by TGI No. 3819P55101A01 (KTR TGI).
5.5.6 JCN EX00-L026 is related to this TGI.
5.6 SRF-JRMC Furnished Material (GFM):
5.6.1 SRF-JRMC will provide GFM listed in the Appendix “M”.
5.7 SRF-JRMC will provide the following service work: (TGI No. 3819P25606S02)
5.7.1 [C740] Crane and crane rigging service.
5.7.2 [X99E] Utility service, electrical.
5.7.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.7.4 [C106.1] Provide safety inspection for SRF-JRMC employees.
5.7.5 [C106.2] Provide gas free inspection for SRF-JRMC employees.
5.7.6 [C133] QA Inspection for (G) symbol (s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/1
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
25611 MN SW CLG SCOOP INJ V- A 0 1
CU PHASE TITLE:
F/O - INSPECT MAIN CONDENSER SCOOP INJECTION CHECK VALVE
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P25606A01-Engrg Inst.pdf) saved on 24-JAN-2025 0000.
2. ENCLOSURE-02 (3819P25606A01-QA28.docx) saved on 24-JAN-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE 8-86-0-E U
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P25606 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to inspect main condenser scoop injection check valve
Location of Work:
Engine Room (8-86-0-E) Contractor’s facility
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 OMCH, RGRS, ELEC, PFTR, INSL, BLRM
5.2 IMCH, QA
5.3 OMCH, RGRS, ELEC, PFTR, INSL, BLRM.
5.4 PNTR, QA
Machinery Work CFM: marine chemist cost, and misc such as covering material, plastic sheet, tape and any other consumable.
Piping Work CFM: paint, take bulk sample and sampler cost, thinner, paint, gasket material, flange shield material and any other consumable.
Electrical Work CFM: banding material, fasteners, insulation tape, plastic bags, rope, and other consumable.
Process Funding Document
Version-1 revised ENCLOSURE-02, C232, Y. Kubo 01/24/2025, -/-/Y
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/1
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
25611 MN SW CLG SCOOP INJ V- A 0 1
CU PHASE TITLE:
F/O - INSPECT MAIN CONDENSER SCOOP INJECTION CHECK VALVE
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P25606 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M RUBBER G, ORDERED FOR
KTR
ORI: CODE 232 R. HASEGAWA,
243-9981
RUBBER GASKET, TYPE-96,
SIZE: 3FT X 4FT X 1/8"THK,
MATERIAL; POLYCHLORRENE
RUBBER,
SPEC: ASTM 2000D, M2-AA603-
A13-B13-EA14,
DWG: 804-5284201-S12,
CERTIFICATION SHEET
REQUIRED,
DO NOT CROSS TO NSN: 5330-
01-490-5044 (QDR SUBMITTED)
9B 5330 LL4598269 NA 4 N 50247511 2/SH
002 M RUBBER SHEET,SOLID,,
ORDERED FOR KTR
ORI: CODE 232 R. HASEGAWA,
243-9981
9B 5330 014905035 NA 4 N 50245374 2/SH
003 M NUT,PLAIN,HEXAGON, 1-1/4"-
7UNC-2B, MONEL
ORDER FOR KTR
C232 R. HASEGAWA 243-9981
9B 5310 002725706 NA 4 N 50245499 40/EA
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
400 M GASKET,S, ORDER FOR KTR
(LO PP)
C234 H. SHINMEI 243-2371
9B 5330 013387789 NA 4 N 50065145 4/EA
401 M GASKET,S, ORDER FOR KTR
(LO PP)
C234 H. SHINMEI 243-2371
9B 5330 013387836 NA 4 N 50065157 4/EA
402 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 2-1/8" OD TUBE,
SIZE: 2-1/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDER FOR KTR
C234 H. SHINMEI 243-2371
9B 5640 LL9607843 NA 4 N 50067528 4/EA
403 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 1" IPS,
SIZE: 1-3/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN, 13
EA/BOX.
ORDER FOR KTR
C234 H. SHINMEI 243-2371
9B 5640 LL4783096 NA 4 N 50067530 4/EA
404 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 3/4" IPS,
SIZE: 1-1/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDER FOR KTR
C234 H. SHINMEI 243-2371
9B 5640 LL9607842 NA 4 N 50067531 4/EA
405 M CLOTH,PL, ORDER FOR KTR
C234 H. SHINMEI 243-2371
9B 8305 001487364 NA 4 N 50065164 1/RO
406 M ADHESIVE, S642 FOR
LAGGING CLOTH
ORDER FOR KTR
C234 H. SHINMEI 243-2371
9B 8040 002738708 NA 4 Y 50065169 3/GL
407 M ADHESIVE, S660 FOR PLUSTIC
TUBE
ORDER FOR KTR
C234 H. SHINMEI 243-2371
9B 8040 008419773 NA 4 Y 50065181 4/PT
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 MN SW CLG SCOOP INJ V- A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P25606 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 MN SW CLG SCOOP INJ V- A 0
3819P25606A01 ENCLOSURE-01 SHEET 1 OF 1
REFERENCE:
(a). DWG NO. 2134-5 “-”, 36” x 38” – 30” TILTING DISC CHECK VALVE – CAST BRZ
FLANGED ENDS – MONEL TRIM
INSPECTON NOTES:
1. Conduct mechanical cleaning for the valve using reference (a) as guidance.
2. Conduct visual inspection for the internal parts to ensure any damage using reference (a) as guidance.
3. Conduct performance check for the valve using Ref. (a) as guidance.
3-1. Manually operate the valve through 3 complete cycles.
Allowable binding or excessive opening and closing defects: None.
4. Conduct the hydrostatic test at 50 - 51 psig for 30 minutes to ensure no external leakage. Allowable external leakage and deformation: None.
5. Conduct the seat tightness test at 7.5 – 7.6 psig operational pressure (total head pressure of main condenser circ pump) for 3 minutes to ensure leakage rate at system operating condition.
Allowable seat leakage: 100 cc/hour/inch. dia (3600 cc)
* Leakage between the seat ring and body is not included.
NOTE:
1. The new fastener material of outlet flange joint for replacement shall be Nickel
Copper Alloy 400 in accordance with MIL-STD-777F.
C240 LTA concurred.
/s/ C240A, D. Lum DATE: 1/21/25
ENGRG INST
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P25606A01 - ENCLOSURE-02-1 - TOTAL 2
SHOP TEST RECORD Page 1 of 1 QA FORM 28 (6/05) Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC-19 EX00-L026 KTR N/A Main Condenser Scoop Injection Check Valve
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. DWG: 2134-5 Rev “-”, B. TM: S9086-RK-STM-010/CH-505 Rev “06”, C. N/A D. N/A
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T Y
PE
(S
EE
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
AND POINT OF
ENTRY
REF
LTR
GAGE
USED
(LTR
FROM
BLK 7)
REQUIRED
MEDIUM
USED
PRESSURE
ACTUAL
MINIMUM
DURATION
ALLOWED
LEAKAGE
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.2.3 A, B, Clean Fresh Water 50 PSIG 30
Minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
DATE
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P25606A01 - ENCLOSURE-02-2 - TOTAL 2
SHOP TEST RECORD Page 1 of 1 QA FORM 28 (6/05) Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC-19 EX00-L026 KTR N/A Main Condenser Scoop Injection Check Valve
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. DWG: 2134-5 Rev “-”, B. TM: S9086-RK-STM-010/CH-505 Rev “06”, C. N/A D. N/A
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T Y
PE
(S
EE
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
AND POINT OF
ENTRY
REF
LTR
GAGE
USED
(LTR
FROM
BLK 7)
USED
MINIMUM
ALLOWED
LEAKAGE
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
ST 5.2.4 A,
B, Clean Fresh Water 7.5 PSIG 3 Minutes
3600 per hour
(Remark s*1)
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
*1, Leakage between the seat ring and body is not included.
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
DATE
File details come from the government source that posted it. Updated .