3819P123ACA01_c0v0_FY26_TGI.pdf

PDF 133 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 7 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA059-0008
Issued by

About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for preservation work on the USS Blue Ridge's Fresh Water Ballast Tank No. 9-86-5-W. The task involves commercial blast cleaning of a 32,307-gallon fresh water ballast tank, which covers 6,900 square feet of interior surface, with work scheduled from July 21, 2026 to November 21, 2027. The preservation effort includes a comprehensive visual inspection of the tank's structural integrity, existing coating, and potential lead hazards, followed by surface preparation, coating application, and air testing.

The task will be supported by SRF-JRMC (Shore Repair Facility - Japan Repair and Maintenance Center), which will provide critical services including crane and rigging, utility services, safety inspections, gas-free inspections, and quality assurance inspections. The work follows specific surface preparation specifications (SSPC-SP 6) and requires detailed reporting of inspection findings and new coating applications. The critical coated area is identified as CCNY-LCC19-080-25, and the work is linked to a specific Job Control Number (ES01-ZAE8) with no government-furnished materials required.

View the file

Other files

File Type Posted
N6264925RA059-0009.pdf PDF
N6264925RA059-0002.pdf PDF
N6264925RA059-0001.pdf PDF
3819P25001T04_c0v0_TGI.pdf PDF
3819P25001T01_c0v0_TGI.pdf PDF
TGI_3819P22115T01_c0v0.pdf PDF
TGI_3819P22114T06_c0v0.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment V Contract Data Sheet.pdf PDF
3819P65416A01_c1v2_FY26_TGI.pdf PDF
3819P26001A01_c0v0_FY26_TGI.pdf PDF
3819P25201A01_c0v0_FY26_TGI.pdf PDF
3819P22115A12_c0v0_FY26_TGI.pdf PDF
3819P22115A06_c0v0_FY26_TGI.pdf PDF
3819P22115A05_c0v0_FY26_TGI.pdf PDF
3819P22115A01_c1v1_FY26_TGI.pdf PDF
3819P22114A17_c0v0_FY26_TGI.pdf PDF
3819P22114A13_c0v1_FY26_TGI.pdf PDF
3819P22114A12_c0v1_FY26_TGI.pdf PDF
3819P22114A10_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0003.pdf PDF
3819P43701T02_c0v0_TGI.pdf PDF
3819P25606T01_c0v0_TGI.pdf PDF
3819P25001T03_c0v0_TGI.pdf PDF
TGI_3819P22115T05_c0v0.pdf PDF
TGI_3819P22114T04_c0v0.pdf PDF
TGI_3819P123AGT05_c0v0.pdf PDF
Attachment IV Request for Information Form.docx DOCX document
Attachment II Price Proposal Breakdown Form N6264925RA059_REV2.xlsx XLSX spreadsheet
3819P22115A04_c0v0_FY26_TGI.pdf PDF
3819P22115A03_c0v0_FY26_TGI.pdf PDF
3819P22114A14_c0v0_FY26_TGI.pdf PDF
3819P22114A07_c1v1_FY26_TGI.pdf PDF
3819P25507A01_c0v0_FY26_TGI.pdf PDF
3819P43701T01_c0v0_TGI.pdf PDF
3819P25001T02_c0v0_TGI.pdf PDF
TGI_3819P22115T02_c0v0.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT02_c0v0_TT_rev.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
3819P25514A01_c0v0_FY26_TGI.pdf PDF
3819P25001A01_c1v0_FY26_TGI.pdf PDF
3819P22124A01_c0v0_FY26_TGI.pdf PDF
3819P22115A11_c0v0_FY26_TGI.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

07-APR-2025 0911

20.14.15.2.9020 (September 2024) ICN: 3819P123AC KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BLST 9-86-5-W AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - PRESERVE FRESH WATER BALLAST (9-86-5-W)

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

ES01ZAE8

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

HAGA, MASAMICHI 231B 3152432513 05-APR-2025

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 05-APR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-ZAE8

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A16AC

1 SCOPE/PURPOSE:

1.1 Title: Fresh Water Ballast (9-86-5-W); preserve

1.2 Location of Work:

1.2.1 Fresh Water Ballast (9-86-5-W)

1.2.2 Self Service Storeroom (6-86-1-A)

1.3 Identification:

1.3.1 Quantity (One EA), Fresh Water Ballast

Tank No.: 9-86-5-W Capacity: 32,307 Gallons

TGI Short Form

07-APR-2025 0911

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P123AC KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BLST 9-86-5-W AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - PRESERVE FRESH WATER BALLAST (9-86-5-W)

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (6,900 SF), Entire Interior Surface of Fresh Water Ballast (9-86-5-W)

Remarks: The area includes tank side of manhole cover plate(s) and bolting ring

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Critical Coated Area: CCNY-LCC19-080-25 for the area listed in 1.3.2

1.5.2 Potential Lead Hazard.

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 11/21/2027

2. PROCEDURE:

2.1 Commercial blast clean each tank listed 1.3.1. Accomplish each requirement of Surface Preparation Specification SSPC-SP 6 of Ref. No. 3.

2.2 Accomplish a visual inspection of each tank listed in 1.3.1 for existing preservation coating, structural integrity, deterioration, pitting, each crack, and area of damage or distortion, including each sounding tube, tank vent, overflow, piping, each structural member, and manhole cover, using Ref. No. 4 through Ref. No. 10 for guidance.

2.2.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 2.2 to the SUPERVISOR.

2.3 Accomplish the requirements of 009-32 of Ref. No. One, including Table 4, Line(s) 17, for each area listed in 1.3.2.

2.3.1 Submit new coating data applied to the SUPERVISOR in accordance with Ref. No. 11 and Ref. No. 12.

2.4 Accomplish the requirements of 009-25 of Ref. No. One for a completion air test of each tank listed in 1.3.1. Test pressure must be 2 PSIG. Allowable drop in pressure: None.

2.5 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.6 Notes:

2.6.1 Planner: Code 231B M. Haga, 243-2513

2.6.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.6.3 Opening, initial cleaning, and closing of each space listed in 1.2.1 will be covered by TGI No. 3819P12343A01 (KTR TGI).

2.6.4 Ref. No. 12 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey (MRC G1N5).

2.6.5 This TGI meets the intent of LCC CSWT File No. 123-010.

07-APR-2025 0911

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P123AC KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BLST 9-86-5-W AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - PRESERVE FRESH WATER BALLAST (9-86-5-W)

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.6.6 JCN ES01-ZAE8 is related to this TGI.

2.7 Government Furnished Material (GFM): None.

2.8 SRF-JRMC will provide the following service work: (TGI No. 3819P123ACS02)

2.8.1 [C740] Crane and crane rigging service.

2.8.2 [X99E] Utility service, electrical.

2.8.3 [X99M] Utility service, including water supply, steam supply, and low pressure air supply except onboard blasting work.

2.8.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.8.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.8.6 [C133] QA inspection for (G) symbol(s) and review of coating application data.

07-APR-2025 0911

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P123AC KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BLST 9-86-5-W AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - PRESERVE FRESH WATER BALLAST (9-86-5-W)

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 TM SYSTEMS &

SPECIFICATIONS

SSPC Painting Manual Volume

- N

4 DWG 100-2491003 SHELL PLTG & STGR FRAME

51 1/2 -102 1/4 CL TO 4 TH

DECK

G Y ALL

5 DWG 101-2491024 WEBS FR 88, 90, 92, 94 & 96 H Y ALL

6 DWG 103-2491033 2 PLATF FR 52-98 J Y ALL

7 DWG 103-2491036 1ST PLATF PLTG FR 52-98 G Y ALL

8 DWG 114-2491157 TRANSV BHD FR 76 & 86 N Y ALL

9 DWG 114-2491158 TRANSV BHD FR 98 &109 K Y ALL

10 DWG 114-2491162 Wing Tank BHD FR76-98 D Y ALL

11 TM T-9630-AB-MMD-

Corrosion Control Assessment and Maintenance Manual

(CCAMM)

3 N

12 TM NAVSEA 4790/14 Tank and Void Structural and Coating Condition Survey (MRC G1N5)

- N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 PNTR, RGRS, QA

2.2 PNTR, SFTR

2.3 PNTR, RGRS, QA

2.4 SFTR

2.5 PNTR, QA

Preservation Work CFM: marine chemist, all paints, thinner, grits, tank watch cost, air compressor, dryer, fuel oil, air conditioning, lead sampling/analysis cost, and misc such as covering material and other consumable.

Process Funding Document.

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P123AC KEY OP: A01

07-APR-2025 0911

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P123AC KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BLST 9-86-5-W AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - PRESERVE FRESH WATER BALLAST (9-86-5-W)

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT