This Task Group Instruction (TGI) details maintenance procedures for the 1A Boiler Smoke Indicator on the USS Blue Ridge (LCC-19), scheduled for work between July 21, 2026, and November 21, 2027. The comprehensive task involves cleaning, inspecting, and aligning multiple components of the smoke indicator, including a lamp unit, damper units, reflector unit, and extension vision unit manufactured by Robert H. Wager Company INC. The maintenance will be performed in the Fire Room (8-76-0-E) and requires specific steps such as mechanical cleaning, visual inspection for deterioration, disconnecting and reconnecting parts, and alignment checks. SRF-JRMC will provide government-furnished materials and supporting services including crane and rigging, utility services, and safety inspections. The task originated from a Boiler Inspection and Repair Management Information System (BIRMIS) report dated October 17, 2024, and is associated with Job Control Number EM02-L194.

View the file

Other files

File Type Posted
3819P43701T01_c0v0_TGI.pdf PDF
3819P25001T02_c0v0_TGI.pdf PDF
TGI_3819P22115T02_c0v0.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT02_c0v0_TT_rev.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
3819P25514A01_c0v0_FY26_TGI.pdf PDF
3819P25001A01_c1v0_FY26_TGI.pdf PDF
3819P22124A01_c0v0_FY26_TGI.pdf PDF
3819P22115A11_c0v0_FY26_TGI.pdf PDF
3819P22115A10_c0v0_FY26_TGI.pdf PDF
3819P22115A08_c0v0_FY26_TGI.pdf PDF
3819P22115A02_c1v1_FY26_TGI.pdf PDF
3819P22114A15_c0v0_FY26_TGI.pdf PDF
3819P22114A11_c1v2_FY26_TGI.pdf PDF
3819P22114A05_c0v0_FY26_TGI.pdf PDF
3819P22114A04_c1v1_FY26_TGI.pdf PDF
3819P22114A01_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0003.pdf PDF
3819P43701T02_c0v0_TGI.pdf PDF
3819P25606T01_c0v0_TGI.pdf PDF
3819P25001T03_c0v0_TGI.pdf PDF
TGI_3819P22115T05_c0v0.pdf PDF
TGI_3819P22114T04_c0v0.pdf PDF
TGI_3819P123AGT05_c0v0.pdf PDF
Attachment IV Request for Information Form.docx DOCX document
Attachment II Price Proposal Breakdown Form N6264925RA059_REV2.xlsx XLSX spreadsheet
3819P22115A04_c0v0_FY26_TGI.pdf PDF
3819P22115A03_c0v0_FY26_TGI.pdf PDF
3819P22114A14_c0v0_FY26_TGI.pdf PDF
3819P22114A07_c1v1_FY26_TGI.pdf PDF
3819P123ACA01_c0v0_FY26_TGI.pdf PDF
3819P25507A01_c0v0_FY26_TGI.pdf PDF
2.01 N6264925RA059.pdf PDF
N6264925RA059-0008.pdf PDF
N6264925RA059-0007.pdf PDF
N6264925RA059-0006.pdf PDF
N6264925RA059-0005.pdf PDF
N6264925RA059-0004.pdf PDF
3819P25001T05_c0v0_TGI.pdf PDF
TGI_3819P22115T03_c0v0.pdf PDF
TGI_3819P22114T02_c0v0.pdf PDF
TGI_3819P22114T01_c0v0.pdf PDF
TGI_3819P123AGT10_c0v0.pdf PDF
TGI_3819P123AGT09_c0v0.pdf PDF
TGI_3819P123AGT08_c0v0.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

03-MAR-2025 1344

20.14.15.2.9020 (September 2024) ICN: 3819P22114 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A BOILER PERISCOPE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K51-01) F/O – ACCOMPLISH CLN, INSP AND ALIGN OF 1A BOILER SMOKE INDICATOR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

EM02L194

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TSUNOI, TAKUMA 234 7077872058 13-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

IZUMI, NORIAKI 234 3152432243 20-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L194

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

TAKAHASHI, YASUHIKO

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1114

1 SCOPE/PURPOSE:

1.1 Title: Cleaning, Inspection, Alignment of 1A Boiler Smoke lndicator (Periscope); accomplish

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Smoke Indicator (Periscope), 1A Boiler Mfr: Robert H. Wager Company INC.

Mfr: ID: 734 Material of Piping: Aluminum Alloy (5086)

FSCM: 79128

APL: 382030009

TGI Short Form

03-MAR-2025 1344

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A BOILER PERISCOPE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K51-01) F/O – ACCOMPLISH CLN, INSP AND ALIGN OF 1A BOILER SMOKE INDICATOR

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.3.1.1 Quantity (One EA), Lamp Unit

Mfr: Robert H. Wager Company INC.

Mfr: ID: 105A

FSCM: 79128

APL: 382030009

1.3.1.2 Quantity (2 EA), Damper Unit

Mfr: Robert H. Wager Company INC.

Mfr: ID: 110A

FSCM: 79128

APL: 382030022

1.3.1.3 Quantity (One EA), Reflector Unit

Mfr: Robert H. Wager Company INC.

Mfr: ID: 95B

FSCM: 79128

APL: 382030009

1.3.1.4 Quantity (One EA), Extension Vision Unit

Mfr: Robert H. Wager Company INC.

Mfr: ID: 100A

FSCM: 79128

APL: 382030021

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 11/21/2027

2 PROCEDURE:

2.1 Accomplish mechanical cleaning of the smoke indicator listed in 1.3.1, using Ref. No. 3, Ref. No. 4 and Paragraph 221-3.5 of Ref. No. 5 for guidance.

2.1.1 Matchmark and Disconnect each part of the smoke indicator for cleaning and inspection.

2.1.2 Clean each scavenging air ports, piping, lamp unit listed in 1.3.1.1, damper unit listed in 1.3.1.2, mirror of the reflector unit listed in 1.3.1.3 and extension vision unit listed in 1.3.1.4, using a non-inflammable glass cleaner, soft, clean, lint-free cloth to apply the cleaner and to buff surface.

2.1.3 Accomplish a visual inspection of smoke indicator for deterioration, pitting, each crack, and area of damage or distortion.

2.1.3.1 Submit one legible copy, in hard copy, or approved transferrable media, of a report listing results of the requirements of

2.1.3 to the SUPERVISOR.

03-MAR-2025 1344

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A BOILER PERISCOPE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K51-01) F/O – ACCOMPLISH CLN, INSP AND ALIGN OF 1A BOILER SMOKE INDICATOR

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.1.4 Connect each part of the smoke indicator.

2.1.4.1 Adjust each mirror and housing of the reflector unit listed in 1.3.1.3 and extension vision unit listed in 1.3.1.4 of the smoke indicator.

2.1.4.2 Accomplish an alignment check of the smoke indicator.

2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.3 Notes:

2.3.1 Planner: Code 234 T. Tsunoi, 070-7787-2058

Planner: Code 233 K. Uchimura, 080-9350-1432

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 Ship’s Force will conduct alignment check of the smoke indicator.

2.3.4 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1A Boiler report dated 17 OCT 2024, Line item "K51-01".

2.3.5 JCN EM02-L194 is related to this TGI.

2.4 Government Furnished Material (GFM):

2.4.1 SRF-JRMC will provide GFM listed in the Material List.

2.5 SRF-JRMC will provide the following service work: (TGI No: 3819P22114S03)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbol(s).

03-MAR-2025 1344

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A BOILER PERISCOPE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K51-01) F/O – ACCOMPLISH CLN, INSP AND ALIGN OF 1A BOILER SMOKE INDICATOR

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY25 Local Standard Items - ORG N 3 DWG 200-2492016 Smoke Indicators - ARRGT &

DETS

A Y ALL

4 DWG 731-A GENERAL ARRANGEMENT

OF 3 UNIT TYPE SMOKE

INDICATOR

A Y ALL

5 TM S9086-GY-STM-

010/CH-221

Boilers 8 Y 181

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 BLRM HRs, INSL HRs, ELEC HRs, RGRS HRs 22/KE PC N

2.2 PNTR HRs, QA HRs, RGRS HRs 22/KE PC N

CFM for asbestos sampler and analysis cost, covering material, insulation tape, plastic bags, rope, tyvek suit, fasteners, painting material felt, cloth, and other consumable material (MISC).

22/MQ CS N

Process Funding Document 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M DAMPER UNIT, C234 T.

TSUNOI 070-7787-2058

ORDER FOR KTR

DAMPER UNIT, SMOKE

INDICATOR

PART#110A

3B 4410 010187093 NA 4 N 50385014 2/EA

002 M REFLECTING UNIT ASS, C234

T. TSUNOI 070-7787-2058

ORDER FOR KTR

REFLECTING UNIT, SMOKE

INDICATOR

PART#95A

9B 4410 003780112 NA 4 N 50385045 1/AY

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22114 KEY OP: A02

03-MAR-2025 1344

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A BOILER PERISCOPE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K51-01) F/O – ACCOMPLISH CLN, INSP AND ALIGN OF 1A BOILER SMOKE INDICATOR

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

003 M VISION UNIT, C234 T. TSUNOI

070-7787-2058

ORDER FOR KTR

VISION UNIT, SMOKE

INDICATOR

PART#100A

9B 4410 003780111 NA 4 N 50385046 1/AY

004 M FELT SHEET, C234 T. TSUNOI

070-7787-2058

ORDER FOR KTR

FELT SHEET, VISION UNIT &

REFLECTING UNIT

SMOKE INDICATOR

9B 8305 002618493 NA 4 N 50385047 1/YD

005 M MIRROR,GLASS, C234 T.

TSUNOI 070-7787-2058

ORDER FOR KTR

WATERPROOF MIRROR,

VISION UNIT & REFLECTING

UNIT

SMOKE INDICATOR

9B 9340 006417089 NA 4 N 50385048 2/EA

006 M ADAPTER,LAMP, C234 T.

TSUNOI 070-7787-2058

ORDER FOR KTR

ADAPTER, LAMP, LAMP UNIT

SMOKE INDICATOR

PART#105A

9B 4410 002186244 NA 4 N 50385050 1/AY

007 M NUT,GLAND, C234 T. TSUNOI

070-7787-2058

ORDER FOR KTR

GLAND NUT, LAMP UNIT &

DAMPER UNIT, SMOKE

INDICATOR

9B 5310 010877980 NA 4 N 50385197 2/EA

008 M LAMP,INCANDESCENT, C234

T. TSUNOI 070-7787-2058

ORDER FOR KTR

LAMP BULB, LAMP UNIT,

SMOKE INDICATOR

9B 6240 009273180 NA 4 N 50385053 1/EA

009 M LAMPHOLDER, C234 T.

TSUNOI 070-7787-2058

ORDER FOR KTR

LAMP SOCKET, LAMP UNIT,

SMOKE INDICATOR

PART# 7N

9B 6250 011959128 NA 4 N 50385055 1/EA

010 M GASKET, C234 T. TSUNOI 070-

7787-2058

ORDER FOR KTR

GASKET SHEET, 50" X 50" X

1/16" THK

9B 5330 013922760 NA 4 N 50495079 1/SH