TGI_3819P22114T02_c0v0.pdf
PDF 25 KB Posted
- Solicitation number
- N6264925RA059-0008
About this file
This WebAIM Short Form Task Group Instruction details a tightness and operational test for the Main Feed Water System on the USS Blue Ridge (LCC-19). The document is dated 01-MAY-2025 and involves three primary work groups: Contractor (22/KE), Quality Assurance (33/G1), and Ship's Force (EM02), each tasked with accomplishing and documenting the test in accordance with reference document TP 25511-3-300KTR. The task group instruction includes preparation details from Mizushima Masaki and Ohta Jason Y., with Takahashi Yasuhiko listed as the Zone Manager, and is marked as For Official Use Only (FOUO).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
01-MAY-2025 0921
20.14.15.2.9020 (September 2024) ICN: 3819P22114 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 25511-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 25511
CU PHASE TITLE: MAIN FEED WATER SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EM02L194
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
MIZUSHIMA, MASAKI 246.2 3152434112 17-APR-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 29-APR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM02-L194
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI, YASUHIKO U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
221A1114
Tightness & Operational Test for Main Feed Water System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
01-MAY-2025 0921
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 25511-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 25511
CU PHASE TITLE: MAIN FEED WATER SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 25511-3-300KTR MAIN FEED WATER (T & OP) -
KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 25511-3-300KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 25511-3-300KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 25511-3-300KTR.
/ EM02 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P22114 KEY OP: T02