3819P22114A01_c0v0_FY26_TGI.pdf

PDF 209 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 7 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA059-0008
Issued by

About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for preservation work on the USS Blue Ridge, specifically focusing on the bilge area and foundation in the Fire Room (8-76-0-E). The task involves pumping out, cleaning, and drying the bilge area free from oil, debris, and foreign matter, with work scheduled to start on 7/21/2026 and complete by 11/21/2027. The preservation area covers 822 square feet in the starboard side of the ship, between frames 75 and 81, with potential lead hazard considerations.

The document specifies that SRF-JRMC (Ship Repair Facility-Japan Regional Maintenance Center) will provide supporting services including crane and rigging, utility services (electrical, low pressure air, water, and steam), safety inspections, gas-free inspections, and quality assurance inspections. The task is in response to a Boiler Inspection and Repair Management Information System (BIRMIS) report dated 17 OCT 2024, with the specific line item D74C-01. The work will follow NAVSEA and local standard items, with tasks involving labor hours, painting, and preservation work documentation.

View the file

Other files

File Type Posted
N6264925RA059-0009.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R2.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
3819P22115A06_c0v0_FY26_TGI.pdf PDF
TGI_3819P22115T01_c0v0.pdf PDF
3819P25001T04_c0v0_TGI.pdf PDF
3819P22114A15_c0v0_FY26_TGI.pdf PDF
3819P22114A07_c1v1_FY26_TGI.pdf PDF
3819P123ACA01_c0v0_FY26_TGI.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
3819P22114A17_c0v0_FY26_TGI.pdf PDF
3819P22115A05_c0v0_FY26_TGI.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
3819P25507A01_c0v0_FY26_TGI.pdf PDF
3819P22114A16_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0005.pdf PDF
3819P22115A07_c0v0_FY26_TGI.pdf PDF
3819P22114A06_c1v1_FY26_TGI.pdf PDF
3819P22115A02_c1v1_FY26_TGI.pdf PDF
Attachment III Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
3819P25606A01_c0v1_FY26_TGI.pdf PDF
TGI_3819P123AGT09_c0v0.pdf PDF
3819P123AGA01_c1v1_FY26_TGI.pdf PDF
3819P22115A12_c0v0_FY26_TGI.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
3819P22114A13_c0v1_FY26_TGI.pdf PDF
N6264925RA059-0001.pdf PDF
3819P22115A01_c1v1_FY26_TGI.pdf PDF
3819P22114A12_c0v1_FY26_TGI.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
3819P25201A01_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0008.pdf PDF
3819P22115A13_c0v0_FY26_TGI.pdf PDF
3819P22114A03_c2v2_FY26_TGI.pdf PDF
TGI_3819P22114T01_c0v0.pdf PDF
TGI_3819P22114T02_c0v0.pdf PDF
3819P22115A09_c0v1_FY26_TGI.pdf PDF
3819P22114A08_c1v1_FY26_TGI.pdf PDF
TGI_3819P123AGT03_c0v0.pdf PDF
TGI_3819P123AGT07_c0v0.pdf PDF
3819P25001T05_c0v0_TGI.pdf PDF
3819P22115A08_c0v0_FY26_TGI.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
3819P22114A11_c1v2_FY26_TGI.pdf PDF
3819P22114A02_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0006.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
3819P26001A01_c0v0_FY26_TGI.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

03-MAR-2025 1339

20.14.15.2.9020 (September 2024) ICN: 3819P22114 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-76-0-E MS A 3 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 13011

CU PHASE TITLE: *(D74C-01) F/O - PRESERVE BILGE AREA AND FOUNDATION IN 8-76-0-E

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

EM02L194

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

KUROKAWA, NAOKI 231B 3152430108 24-JAN-2025

APPROVED BY: CODE: PHONE: DATE:

NAKANO, SEIICHI 231B 3152434519 24-JAN-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L194

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

TAKAHASHI, YASUHIKO 8-76-0-E 8 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1114

1. SCOPE/PURPOSE:

1.1 Title: Bilge Area and Foundation in 8-76-0-E; preserve

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (822 SF), Bilge Area including Boiler Foundation in 8-76-0-E, Frame between 75 and 81, Starboard Remarks: The area is surface where mechanical tool, roller, and brush can be reachable, and the area except chock and fastener.

See Sketch Enclosure-01 for location detail.

1.4 Security Classification: None.

TGI Short Form

03-MAR-2025 1339

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-76-0-E MS A 3 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 13011

CU PHASE TITLE: *(D74C-01) F/O - PRESERVE BILGE AREA AND FOUNDATION IN 8-76-0-E

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.5 Initial Condition:

1.5.1 Potential Lead Hazard

1.5.2 Critical Coated Area: CCNY-LCC19-070-25 for the area listed in 1.3.1.

1.6 Contractor Work start date: 7/21/2026

1.7 Contractor Work completion date: 11/21/2027

2. PROCEDURE:

2.1 Pump out, clean and dry the bilge area located in 1.2.1 free from oil, debris, and other foreign matter.

2.2 Accomplish the requirements of 009-32 of Ref. No One, including Table 3, Line(s) 13, for each area listed in 1.3.1.

2.3 Notes:

2.3.1 Planner: Code 231B N. Kurokawa, 243-0108

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 Provision of oily/chemical water barge will be coordinated by Project Team.

2.3.4 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1A Boiler report dated 17 OCT 2024, Line Item(s) D74C-01.

2.3.5 JCN EM02-L194 is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC will provide the following service work: (TGI No. 3819P22114S02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbol(s) and review coating application data.

03-MAR-2025 1339

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-76-0-E MS A 3 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 13011

CU PHASE TITLE: *(D74C-01) F/O - PRESERVE BILGE AREA AND FOUNDATION IN 8-76-0-E

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 LBR HRs 22/KE PC N

2.2 PNTR HRs, SFTR HRs, QA HRs 22/KE PC N

Preservation Work CFM for all paints, thinners, sampler/analyze lead, and MISC such as covering material and other consumable.

22/MQ CS N

Process Funding Document 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P22114A01-Sketch.pdf 24-JAN-2025 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22114 KEY OP: A01

A

Sheet 1 of 23819P22114A01

SKETCH

ENCLOSURE-01

Naoki.Kurokawa.ja Rectangle

Naoki.Kurokawa.ja_1 Typewritten Text

PLAN VIEW

Naoki.Kurokawa.ja_2 Typewritten Text

INNER BOTTOM

Naoki.Kurokawa.ja_3 Line

Sheet 2 of 23819P22114A01

SKETCH

ENCLOSURE-01

SECTION 2-A

Area excepts chock and fasteners

Naoki.Kurokawa.ja_4 Polygon

Naoki.Kurokawa.ja_5 Polygon

Naoki.Kurokawa.ja_6 Polygon

Naoki.Kurokawa.ja_7 Polygon

File details come from the government source that posted it. Updated .