This WebAIM Short Form Task Group Instruction (TGI) details an inspection task for the USS Blue Ridge's 1B Boiler handhole and manhole seats and plates. The document specifies an inspection of multiple boiler components, including 7 handhole seats/plates on the rear wall header, 15 on superheater inlet and outlet headers, 5 on screen wall header, 8 on side wall header, and 2 manhole seats/plates on the steam drum and 1 on the water drum. The contractor work is scheduled from July 21, 2026, to November 21, 2027, with the task involving requirements from multiple reference documents.

The TGI includes support services from SRF-JRMC, which will provide crane and rigging services, electrical and utility services (low pressure air, water, and steam), safety and gas-free inspections, and quality assurance inspections. The task is in response to a Boiler Inspection and Repair Management Information System (BIRMIS) report dated October 17, 2024, and is associated with Job Control Number EM02-L192. The boiler is manufactured by Foster Wheeler Corp, with a design pressure of 705 PSIG and maximum operating pressure of 655 PSIG, located in the Fire Room (8-76-0-E) of the USS Blue Ridge.

View the file

Other files

File Type Posted
N6264925RA059-0009.pdf PDF
N6264925RA059-0002.pdf PDF
N6264925RA059-0001.pdf PDF
3819P25001T04_c0v0_TGI.pdf PDF
3819P25001T01_c0v0_TGI.pdf PDF
TGI_3819P22115T01_c0v0.pdf PDF
TGI_3819P22114T06_c0v0.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment V Contract Data Sheet.pdf PDF
3819P65416A01_c1v2_FY26_TGI.pdf PDF
3819P26001A01_c0v0_FY26_TGI.pdf PDF
3819P25201A01_c0v0_FY26_TGI.pdf PDF
3819P22115A12_c0v0_FY26_TGI.pdf PDF
3819P22115A06_c0v0_FY26_TGI.pdf PDF
3819P22115A05_c0v0_FY26_TGI.pdf PDF
3819P22115A01_c1v1_FY26_TGI.pdf PDF
3819P22114A17_c0v0_FY26_TGI.pdf PDF
3819P22114A13_c0v1_FY26_TGI.pdf PDF
3819P22114A12_c0v1_FY26_TGI.pdf PDF
3819P22114A10_c0v0_FY26_TGI.pdf PDF
3819P43701T01_c0v0_TGI.pdf PDF
3819P25001T02_c0v0_TGI.pdf PDF
TGI_3819P22115T02_c0v0.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT02_c0v0_TT_rev.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
3819P25514A01_c0v0_FY26_TGI.pdf PDF
3819P25001A01_c1v0_FY26_TGI.pdf PDF
3819P22124A01_c0v0_FY26_TGI.pdf PDF
3819P22115A11_c0v0_FY26_TGI.pdf PDF
3819P22115A10_c0v0_FY26_TGI.pdf PDF
3819P22115A08_c0v0_FY26_TGI.pdf PDF
3819P22115A02_c1v1_FY26_TGI.pdf PDF
3819P22114A15_c0v0_FY26_TGI.pdf PDF
3819P22114A11_c1v2_FY26_TGI.pdf PDF
3819P22114A05_c0v0_FY26_TGI.pdf PDF
3819P22114A04_c1v1_FY26_TGI.pdf PDF
3819P22114A02_c0v0_FY26_TGI.pdf PDF
3819P22114A01_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0003.pdf PDF
3819P43701T02_c0v0_TGI.pdf PDF
3819P25606T01_c0v0_TGI.pdf PDF
3819P25001T03_c0v0_TGI.pdf PDF
TGI_3819P22115T05_c0v0.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

05-MAR-2025 1725

20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: A07

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER BO A 8 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(BIRMIS) F/O - INSPECT 1B BOILER HANDHOLE, MANHOLE SEAT AND PLATE

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EM02L192

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

KIMURA, REIYA 234 7076038983 11-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

HARADA, HIDEO 234 3152435176 12-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L192

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 8-76-0-E U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1115

1. SCOPE/PURPOSE:

1.1 Title: 1B Boiler Handhole, Manhole Seat and Plate; inspect

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Boiler, Main Propulsion, 1B

Mfr: Foster Wheeler Corp Mfr ID: N/A Design Pressure: 705 PSIG Max Operating Pressure: 655 PSIG

CAGE: 23230

APL: 021550096

TGI Short Form

05-MAR-2025 1725

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A07

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER BO A 8 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(BIRMIS) F/O - INSPECT 1B BOILER HANDHOLE, MANHOLE SEAT AND PLATE

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3.1.1 Quantity (7 EA), Seat and Plate, Handhole, Rear Wall Header

1.3.1.2 Quantity (15 EA), Seat and Plate, Handhole, Superheater Inlet Header

1.3.1.3 Quantity (15 EA), Seat and Plate, Handhole, Superheater Outlet Header

1.3.1.4 Quantity (5 EA), Seat and Plate, Handhole, Screen Wall Header

1.3.1.5 Quantity (8 EA), Seat and Plate, Handhole, Side Wall Header

1.3.1.6 Quantity (2 EA), Seat and Plate, Manhole, Steam Drum

1.3.1.7 Quantity (1 EA), Seat and Plate, Manhole, Water Drum

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor Start Date: 7/21/2026

1.7 Contractor Work Completion Date: 11/21/2027

2. PROCEDURE:

2.1 Accomplish the requirements of 009-62 of Ref. No. One for the handhole and manhole listed in 1.3.1.1 through 1.3.1.7, using Ref. No. 3 for guidance.

2.1.1 Accomplish the requirements of 099-906YO of Ref. No. 2.

2.1.1.1 Accomplish the requirements of 009-09 of Ref. No. One.

2.2 Notes:

2.2.1 Planner: Code 234 R. Kimura, 070-7603-8983

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 Removal and Installation of each handhole plate and manhole plate is covered by TGI No. 3819P22102A01.

2.2.4 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line item “F14-01, G13-01, and I-01”.

2.2.5 JCN EM02-L192 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No: 3819P22115S08)

05-MAR-2025 1725

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A07

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER BO A 8 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(BIRMIS) F/O - INSPECT 1B BOILER HANDHOLE, MANHOLE SEAT AND PLATE

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Provide utility service, electrical.

2.4.3 [X99M] Provide utility service, including low pressure air supply, water supply, and steam supply.

2.4.4 [C106.1] Provide safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Provide gas free inspection for SRF-JRMC employees.

2.4.6 [C133] Provide QA inspection for (G) symbols.

05-MAR-2025 1725

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A07

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER BO A 8 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(BIRMIS) F/O - INSPECT 1B BOILER HANDHOLE, MANHOLE SEAT AND PLATE

FOUO Pg 4 of 4

OTHER SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II.

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 TM S9221-C1-GTP-

MAIN PROPULSION BOILERS;

VOL 1, REPAIR & OVERHAUL

5 N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 BLRM HRs, QA HRs 22/KE PC N

CFM for MISC such as temporary enclosure and covering material, plastic bags, and etc.

22/MQ CS N

Process Funding Document 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22115 KEY OP: A07

File details come from the government source that posted it. Updated .