EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf
PDF 287 KB Posted
- Solicitation number
- N6264925RA059-0008
About this file
This Contract Data Requirements List (CDRL) is for ship repair services for the USS Blue Ridge (LCC-19), specifically a Dry Shipyard Repair Availability (DSRA) managed by the U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The contractor is required to provide an Integrated Production Schedule (IPS) within five calendar days of contract award, with subsequent submissions every 30 days until the availability start. Key requirements include attending work package integration conferences, conducting final ship-checks, coordinating with Work Integration Managers, supporting early start periods, ordering long lead time materials, and submitting schedules to integrate with the project timeline. The contract has established key dates of Contractor Work Start on 7/21/2026 and Contractor Work Completion on 6/20/2028, with work to be accomplished within the specified Period of Performance.
The CDRL specifies that the contractor must use Microsoft Office Suite to prepare documentation, support various conference and review events, and follow specific NAVSEA Standard Items and Local Standard Items for Fiscal Years 2025 and 2026. The document requires electronic submission of work schedules to specific points of contact at SRF-JRMC, with distribution authorized to DOD components and contractors. The contractor must prepare for the ship availability by ordering materials, coordinating logistics, and ensuring work can be integrated without causing work stoppages, with a focus on structural materials and equipment preparation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATE
Page of Pages
ALL A X-MGMT
TYCOM 7 TBD TBD
A001 INTEGRATED PRODUCTION SCHEDULE (IPS) N/A
DI-MGMT-82075 SEE BLK 16 SRF-JRMC, CODE 1209
LT
NA D (SEE BLK16)
ASREQ
N/A
SEE BLK16
SEE BLK16
SRF-JRMC (BLK16) 1
0 1 0
BLOCK 4:
Contractor must provide in writing, in English, in approved transferable media, a schedule of work to be performed, in accordance with Category I, NAVSEA Standard Item 009-60.
BLOCK 5:
USS BLUE RIDGE (LCC-19) 5C1 DSRA
BLOCK 9: Distribution authorized to DOD components and DOD contractors; critical technology; October 2007. Other requests for this document shall be referred to Naval Sea Systems Command (SEA 04 RM). Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
BLOCK 10, 12, and 13:
1. Initial submittal of the schedule of work to be performed shall be within five (5) calendar days upon award of the contract in order to integrate with the Project Schedule.
2. Subsequent submissions must be submitted every 30 days after initial submittal, until the start of the availability. Subsequent submissions are not required after the start of the availability.
BLOCK 14
1. The schedule of work to be performed shall be submitted electronically.
2. Code 1209 Points of Contacts (POC) are:
Harumi Todaka (Bldg. 2046 RM 508) harumi.todaka.ln@us.navy.mil
Tooru Tsuno (Bldg. 2046 RM 508) tooru.tsuno2.ln@us.navy.mil
Conan Tsukayama (Bldg. 2046 RM 508) conan.p.tsukayama.civ@us.navy.mil
Leonard Yee (Bldg. 2046 RM 508) leonard.s.yee.civ@us.navy.mil
Adobe Professional 8.0
8/15/2025 8/15/2025
G. PREPARED BY I. APPROVED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DD FORM 1423-1, FEB 2001 Page of Pages
ALL A X-MGMT
CHT RM TANKS & FLUSH TBD TBD
16. REMARKS (Continued)
CONTRACT DATA REQUIREMENTS LISTS (CDRL)
In accordance with the Contract Data Requirements List (CDRL) of the contract, the Contractor shall provide in writing in English utilizing Microsoft Office Suite a schedule of work to be performed, in accordance with Category I, NAVSEA Standard Item 009-060.
Actual physical shipboard work shall begin and end in accordance with the dates documented in their respective Task Group Instructions (TGIs). However, the contractor must perform the following tasks prior to the ship availability:
Performance Work Statement for USS BLUE RIDGE LCC-19 contracting requirements The contractor shall attend and support the IPTD III Work Package Integration Conference (WPIC) 120 days prior to a scheduled availability dated
/ /202 . The contractor shall support the conference by evaluating the Availability Work Package and pinpointing work requirements or issues that conflict, prevent or impact other work items from being accomplished.
The contractor shall conduct final ship-checks and coordination with Work Integration Managers (WIMs) who will liaison with the project team.
The contractor shall attend and support the IPTD IV Work Package Execution Review (WPER) and Schedule Model Review (SMR) events as needed prior to availability. The contractor shall support the mandated conferences executed during planning period leading up to execution of an availability to review work, schedule, and ensure material and resource availability.
The contractor shall support the Early Start period of availability when authorized. Contractor is required to begin work and therefore needs time to coordinate and stage materials and equipment prior to starting the physical work.
The contractor is required to order all long lead time structural materials. Some of which has long duration for fabrication and shipping from United States manufacturers.
The contractor is required to ensure a schedule is submitted to the project team to integrate with existing project schedule and mitigate risks due to space/location constraints to avoid work stoppages.
7) Category I NAVSEA Fiscal Year 2025 (FY25) Original Standard Items are applicable to all items without further reference except TGIs:
3819P123AGA01, 3819P25507A01, 3819P43701A01, and 3819P65416A01. These 4 TGIs are referring Fiscal Year 2026 (FY26) CH-1 Standard Items. Category II NAVSEA FY25 Original and FY26 CH-1 Standard Items are applicable when invoked and/or referenced in individual Task Group Instruction (TGI) specified in ATTACHMENT (I). NSIs may be found at: https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/
8) Category I U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) FY25 Local Standard Items (LSI), FY25 SRF- JRMC LSI (Original) are applicable to all items without further reference except TGIs: 3819P123AGA01, 3819P25507A01, 3819P43701A01, and 3819P65416A01. These 4 TGIs are referring FY26 SRF- JRMC LSI (Original). Category II SRF-JRMC FY25 LSI (Original) and FY26 LSI (Original) are applicable when invoked and/or referenced in individual TGIs specified in ATTACHMENT (I). FY25 and FY26 LSIs and subsequent changes have been distributed to all current NAVSUP FLCY MSRA/ABR holders. Please refer to Section A of this Solicitation when requesting a copy of these references.
1. The Government has established execution dates for the following key events:
EVENT DATE
Contractor Work Start Date /2026 Contractor Work Completion Date The Contractor shall accomplish the work within the Period of Performance (POP) A POP extension will only be issued if the POP for any individual TGI exceeds the Contractor Work Completion Date listed above.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| 2025-08-15T13:56:31+0900 | |
| TSUNO.TOORU.1545209566 |
| 2025-08-15T13:56:56+0900 | |
| TSUNO.TOORU.1545209566 |
File details come from the government source that posted it. Updated .