- Solicitation number
- N6264925RA059-0008
About this file
This document is a federal contract amendment for a ship repair requirement for the USS Blue Ridge (LCC-19) issued by NAVSUP Fleet Logistics Center Yokosuka. The solicitation amendment extends the proposal submission deadline to 30 Jul 2025 at 10:00 AM Japan Standard Time, with a performance period from 12 Jan 2026 through 13 Dec 2027 at Commander, Fleet Activities Yokosuka Naval Base. Contractors must possess an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) to be eligible, and the solicitation is restricted to sources authorized to operate in Japan.
The amendment includes revisions to several sections, responds to a vendor question about drawing availability, and distributes updated technical documents. Offerors must submit a three-volume proposal including a price proposal, technical acceptability proposal (with subfactors for solicitation compliance, labor hours, management/staffing plan, and milestone schedule), and past performance information. Proposals must be submitted electronically, with specific formatting requirements, and access to the full work specification package is only available through a secure DoD file transfer system after requesting access from specified points of contact.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USSBLUERIDGETYCOM7
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this amendment is as follow s.
1. To respond to the question received.
2. To distribute revised TGI_3819P22114A11_c1v2.
3. To distribute DWG_1S-595-5_E, DWG_803-5001021_E, DWG_803-6074287_A, and DWG_2492086_81994_-_0001_ H.
4. To extend the solicitation closing date.
5. To revise Section A paragraph 4.
6. To revise Section L-1.0 paragraph B.
See the continuation sheet for details.
All other information remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jun-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6264925RA059
X 9B. DATED (SEE ITEM 11)
13-Jun-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jun-2025
CODE
NAVSUP FLC YOKOSUKA
(CODE 200)
CONTRACTING DEPARTMENT
PSC 473 BOX 11
FPO AP 96349-0011
N62649 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6264925RA059
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Below is the question received and response.
Question (2)
We have an urgent request regarding 3819P22114A11: Inspect 1A Boiler Economizer Outlet Feed Water System Lift Check Valve.
The following DWG is required for the estimating process, but TGI CPY REQ indicates N.
Please ask SRF to confirm the availability of the DWG.
REF3 DWG 208-2492086
REF4 DWG 1S-595-5
REF9 DWG 803-6074287
REF10 DWG 803-5001021
Government Answer (2)
Revised TGI 3819P22114A11 Reference CPY REQ column to be able to reflect Ref. No. 3, 4, 9, and 10 accordingly.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 23-Jul-2025 10:00 AM to 30-Jul-2025 10:00 AM.
The following have been modified:
SECTION A
SOLICITATION/CONTRACT FORM
MASTER AGREEMENT FOR THE REPAIR AND ALTERATION OF VESSELS (MARAV): In the event the successful offeror possesses an active Master Agreement for Repair and Alteration of Vessels (MARAV) with the U.S. Navy in the form of either a Master Ship Repair Agreement (MSRA) or an Agreement for Boat Repair (ABR), award for this requirement will be made in the form of a firm fixed price job order under the applicable agreement and all of the terms and conditions of the offer’s existing MARAV will apply.
MSRA/ABR Number
Firms who do not possess an active MSRA/ABR as a Prime Contractor are ineligible for award.
Pursuant to FAR 5.202(a)(12), this is a non-mandatory synopsis. This solicitation is intended only for sources duly authorized to operate and do business in Japan as prescribed by DFARS 252.225-7042.
1. USS BLUE RIDGE (LCC-19): NAVSUP Fleet Logistics Center Yokosuka (NAVSUP FLCY) has a new requirement in support of the USS BLUE RIDGE (LCC-19). The repair and maintenance package of work items are included as Task Group Instruction (TGI) as ATTACHMENT (I).
2. PERIOD OF PERFORMANCE: 12 Jan 2026 through 13 Dec 2027
3. PLACE OF PERFORMANCE: Commander, Fleet Activities Yokosuka (CFAY) Naval Base
4. OFFER: Offerors must provide all information required by this solicitation no later than 30 Jul 2025 at 10:00 AM Japan Standard Time (JST).
5. Access to the work specification package listed in Section J as ATTACHMENT (I) may only be accessed through DoD SAFE. DoD SAFE is a secure U.S. Government repository which enables the sharing of large files and requires outside users to receive a drop-off request from the U.S. Government. Therefore, any offeror intending to provide a proposal to this solicitation shall request access by sending an email to:
risa.sakurai.ln@us.navy.mil and ai.gillard.ln@us.navy.mil by 9 Jul 2025 10:00 am JST. Once the U.S.
Government receives the offeror’s access request, the U.S. Government will provide the offeror with a link and instructions to retrieve ATTACHMENT (I). Offerors shall note that access is only available for 14 days once sent.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
L-1.0 GENERAL INSTRUCTIONS
The Task Group Instructions (TGIs), drawings and references will be provided via the Government’s Department of Defense (DoD) Secure Access File Exchange (SAFE) web-based file transfer service. DoD SAFE is a secure Government repository which enables the sharing of large files which cannot be transmitted via email. The full user guide for DoD SAFE can be found in the following URL (https://safe.apps.mil/help/dod-safe-help.xml). Any offeror intending to submit a proposal to this solicitation shall request access by sending an email to the following personnel serving as the point of contact for this procurement:
Points of Contact (POC):
Risa Sakurai (risa.sakurai.ln@us.navy.mil), Contract Specialist Ai Gillard (ai.gillard.ln@us.navy.mil), Contracting Officer
The Offeror will be required to hold an active U.S. Navy MSRA/ABR Agreement by the proposal submission date, in order for their offer to be considered. Non MSRA/ABR holders may request an application for an MSRA or an ABR certification by requesting an application package from: flcy_msra_abr_group@us.navy.mil. Please note that the MSRA/ABR Certification process may require a year to complete.
The following are the general instructions:
A. The Offeror must respond to all requirements of the solicitation and not alter or rearrange the solicitation.
The Offeror is advised that the Government may incorporate any portions of the Offeror’s proposal into the resulting contract.
B. Questions: Offerors may submit questions in writing via email to the following points of contact listed above. All questions shall be submitted using Attachment (IV) Request for Information (RFI) provided with this solicitation. Questions shall be submitted no later than 23 Jul 2025 10:00 AM Japan Standard Time (JST), to ensure the Government is able to adequately address and respond to questions submitted.
C. Proposal Validity: Offerors shall fill in block 12 in front page of Standard Form 33 (SF 33) with 140 days.
If an offeror fails to fill in block 12, the proposal will be presumed to be valid for 140 days.
D. Amendments: The Government may revise the solicitation at any time by means of an Amendment. Any solicitation amendments and all related documents will be released electronically via email and posted at the Government’s Point of Entry (GPE).
E. Offerors are reminded of the requirements associated with subcontracting with contractors that are debarred, suspended or proposed for debarment contained at FAR 52.209-6. As with all FAR requirements, please ensure you are familiar with those requirements prior to submitting your proposal.
F. Only One Offer: In accordance with DFARS 215.371, if a single offer is received, at the Contracting
Officer’s discretion, certified cost or pricing data may be required to be submitted subsequent to proposal receipt.
G. If any Long Lead Time Material (LLTM) is identified by the offeror during this period, the offeror shall notify the Government using Attachment (IV) RFI.
H. Offerors shall include all anticipated testing work/T-Phase, to include testing work for anticipated standard interference work in your proposal.
I. The Government intends to award without discussions but reserves the right to conduct discussions if necessary. Therefore, offerors are encouraged to submit their best offer from a price standpoint.
J. Growth CLIN: The price for CLIN 0002, Growth Work will be derived from the proposed price for CLIN 0001 in accordance with the formula contained in Attachment (II) Proposal Breakdown Form. The average of the labor rate the successful offeror provides in the Price Proposal Breakdown Sheet will be inserted into H-Clause: Growth CLIN paragraph (e)(1) upon contract award as the fully loaded ship repair labor rate and will be utilized for the purpose of calculating total level of effort to completion under the negotiated Growth Work during the entirety of the contract. The average will be determined by dividing the sum of the total labor costs all CLIN by sum of the total man hours across all CLIN. Additionally, the estimated man-hours and material costs will be inserted into H-Clause: Growth CLIN paragraph (a) upon contract award.
These amounts will be based upon the successful offeror’s proposal in the Attachment (II) Proposal Breakdown Form, CLIN 0002.
K. Ship Check: To schedule a ship check, offerors shall email a request for a ship check to risa.sakurai.ln@us.navy.mil. Participants will be provided additional information to the ship check and will be subject to security, safety, and other applicable regulations established by CFAY Naval Base, SRF- JRMC, and the Commanding Officer of the USS BLUE RIDGE (LCC-19).
L. In accordance with DFAR clause 252.246-7006 and DFARS PGI 246.710-70, Offerers will be required to complete and submit ATTACHMENT (VII) listed in Section J as part of their proposal package and ATTACHMENT (VIII) shall be completed no later than when the warranted items are presented for receipt and/or acceptance.
L-2.0 SUBMISSION OF PROPOSALS
A. Proposal Due Date: All copies of proposals shall be received by the Government no later than the date specified in SF33 block 9 (Front Page) of the Solicitation. Late proposals WILL NOT be considered.
Partial proposals or attachments submitted late WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposal.
B. Electronic Submission: Offerors are instructed to submit their proposal electronically via email to the personnel serving as POC for this procurement. Other submission methods WILL NOT be accepted. In the event that it is impossible to submit the proposal via email due to file size limitations, offerors are instructed to request a drop-off from the POC and submit the proposal via DoD SAFE.
C. Proposal Format: For electronic copies, the files shall be in the format that is compatible with and capable of being opened with Microsoft Office Suite 2016 or Adobe Acrobat Reader 2017. The entire content of the proposal shall be in English. If any required document is written in a language other than English (e.g.
Japanese), the offerer shall make effort to provide an English translation.
L-3.0 PROPOSAL CONTENT
The entire content of the proposal shall be in English. Proposals in Microsoft Office Word document must be formatted using a Times New Roman 12 pt. normal font (no reduction permitted), single-spaced with 1-inch margins all around, and formatted for standard 8.5 x 11 inch paper. The submitted files shall be in the format that is compatible with and capable of being opened with Microsoft Office Suite 2016 or Adobe Acrobat Reader 2017.
Volume Number Volume Title Volume I OFFEROR PRICE PROPOSAL
A. Standard Form (SF33) B. Solicitation Amendment (SF30) – if applicable C. Price Breakdown of Proposal
Volume II TECHNICAL ACCEPTABILITY PROPOSAL A. Subfactor A - Solicitation Compliance B. Subfactor B - Labor Hours C. Subfactor C - Management/Staffing Plan D. Subfactor D - Milestone Schedule/Critical Path Chart
Volume III PAST PERFORMANCE PROPOSAL
A. Past Performance Information (PPI)
Each Volume, Volume I, Volume II, and Volume III shall be submitted in separate attachments as follows:
VOLUME I – OFFEROR PRICE PROPOSAL
Complete and submit the following, which will constitute Volume I:
A. Solicitation (SF 33): The Offeror shall submit one copy of the completed SF33 with blocks 12 through 18 completed as well as all sections (e.g. Section K) with applicable fill-ins. Submission of a signed offer to the Government constitutes agreement and acceptance of the solicited terms and conditions.
B. Solicitation Amendment (SF30): The Offeror shall submit one copy of all acknowledged SF30 by completing and signing block 15.
C. Price Summary: Offerors shall submit the fully completed price proposal utilizing ATTACHMENT (II) “Price Proposal Breakdown Form” of SECTION J. Offerors shall also submit vendor quote’s associated with ATTACHMENT (II).
D. Current MSRA or ABR Certification: Offerors who do not possess a current NAVSUP FLCY MSRA/ABR Agreement will be required to submit a copy of an approved/active U.S. Navy MSRA/ABR Agreement as a Prime Contractor as part of the proposal package.
E. This solicitation is intended only for sources duly authorized to operate and do business in Japan, as prescribed by DFARS 252.225-7042. Contractors outside Japan must submit documentation that unambiguously demonstrates the Offeror's compliance with DFARS 252.225-7042 (e.g., proof of incorporation) as part of their proposal.
VOLUME II – TECHNICAL ACCEPTABILITY PROPOSAL
Volume II is comprised of non-priced proposal information and includes the following subfactors:
A. Subfactor A – Solicitation Compliance: The submission of a responsive proposal will constitute the Offeror’s acceptance of the terms and conditions of the RFP, concurrence with the specifications, and contract type. By submitting an offer in response to this solicitation, the Offeror certifies that they have the capability to accomplish all TGI requirements, and comply with the solicitation terms and conditions, without introducing unacceptable risk. Offerors who cannot fulfill those requirements will be given an “unacceptable” rating under Non-Price Evaluation Factor 2.
Note: The Offeror shall submit one copy of their current MSRA/ABR Certification issued by NAVSUP FLCY or a copy of an approved/active U.S. Navy MSRA/ABR Agreement as a Prime Contractor.
B. Subfactor B – Labor Hours: The Offeror shall provide their proposed labor hours for both prime and subcontractor and proposed material and other direct costs (ODCs) in ATTACHMENT (II) of Section J (Price Proposal Form). The Offeror shall submit the completed ATTACHMENT (II) (without prices) in their technical proposal.
C. Subfactor C – Management / Staffing Plan: The Offeror shall provide a management/staffing plan as an attachment to Volume II of the Technical Proposal and a chart of key trade skill personnel (shipfitter, sheet metal worker, welder, pipefitter, machinist, riggers, quality assurance, engineer, electrician, unskilled laborer, foreman and/or shift supervisor, the shipyardsafety program organization, testing organization, and the quality assurance organization) who will be assigned for the performance of this requirement. The Offeror shall describe how the key trade skill personnel will interact with each other and SRF-JRMC Project Team to perform the functions of upper management, program management, negotiators, estimators, scheduling personnel, engineering personnel, key production personnel by trade. Include the name, title, percentage of time to be devoted to this availability, and years of experience in the ship repair industry for each key person to include estimated labor hours.
D. Subfactor D – Milestone Schedule / Critical Path Chart: The Offeror shall provide a detailed Milestone
Schedule/Critical Path Chart that discusses and demonstrates the Offeror’s overall approach and plan to accomplish overall scope of work and each specification TGI. The Milestone Schedule/Critical Path Chart shall include milestones for each TGI to include support service(s).
WARNING – If the Government determines that an offeror’s proposal is technically unacceptable because the proposed number of labor hours or the proposed quantities of material or others are too high or too low, or that does not reflect and acceptable level of technical understanding, the Government may exclude the proposal from further consideration for award.
VOLUME III – PAST PERFORMANCE INFORMATION (PPI)
A. Past Performance Information (PPI): The offeror should provide PPI “Contract Data Sheet(s)” (utilizing
ATTACHMENT (V)) on no more than three (3) of the offeror’s most recently completed contracts with the U.S. Government, Government of Japan (including Japanese Maritime Self-Defense Forces (JMSDF)/other host nation governments if performed in country other than Japan), and/or the general public not to exceed three (3) years since completion for like or similar services to those to be provided under this solicitation. If the offeror is unable to provide three (3) relevant contracts for past performance evaluation, a lesser number may be submitted. Failure to submit Contract Data Sheet(s) shall be considered a certification that the Contractor has no past performance for like or similar items for the Government to evaluate; however, this does not preclude the Government from considering and evaluating past performance records and information in its possession for work it determines to be relevant.
(End of Summary of Changes)