Att. T) Price Schedule AMD 0004.pdf
PDF 145 KB Posted
- Solicitation number
- N6247026R0012
About this file
This is a B60 Price Schedule for B60 Production Facility Repairs, establishing line items for cost estimation and contract pricing. The schedule encompasses a comprehensive renovation project with a base price (Line Item 1) covering all work in accordance with drawings and specifications, broken down into 33 subtotal line items (1A through 1GG) that segregate work by trade and hazardous material abatement activities. Base bid work includes structural/architectural repairs, fire protection, mechanical and plumbing, electrical (including communications and security systems), civil earthwork and site improvements, building demolition, removal of industrial equipment and hazardous materials, utility connections to existing trailers, rock removal and backfill, soil excavation and replacement, and miscellaneous debris removal. The schedule also includes multiple specialized line items for hazardous material testing and abatement, including lead-containing materials (LCM) paint removal, asbestos-containing materials (ACM) removal across multiple categories (pipe insulation, fittings, joint compound, sealants, flooring, and debris), and testing via PLM, TEM, paint RCRA 8, dust RCRA 8, and PCB analysis. Additional base bid items address micropile installation with load testing, wood flooring and ceiling replacement, masonry crack repairs, and industrial hygienist services.
The schedule includes eleven optional line items (Items 2-12) available for Government exercise within 365 calendar days of contract award, including Furniture, Furnishings, and Equipment ($233,363 government estimated price); Industrial Equipment procurement and installation ($1,695,370 government estimated price); radon fan installation; Electronic Security Systems; additional wood window repairs; additional annex repairs; additional finishes; electrical service infrastructure; resinous flooring; and communication service routing. All optional items require firm fixed pricing with no economic price adjustment. The contract completion date is 622 calendar days after award, with an additional 40 days if Option Item 3 is exercised. Award will be made on Line Item 1 total price only. Evaluation of options will include option prices in the evaluation but does not obligate Government exercise. The Government reserves the right to reject materially unbalanced offers. If any optional items are exercised, additional bonding and surety consent is required, with the Performance Bond reflecting 100 percent of aggregate amounts.
View the file
Other files
Show 40 more
Latest 50 of 157 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B60 PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
Line Item
Description Quantity Unit Unit Price
Sub- Total
Total Price
1 BASE PRICE: Total Price for the entire work for B60 Production Facility Repairs, in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 EA $_
1A Subtotal of Base Price for the all-other items not included in any other line item work complete (including, but not limited to conveying systems), in accordance with the drawings and specifications (identified as 001 Base Bid), but excluding work provided described in Line Item 1B – 1GG and 2 - 12.
1 EA $_
1B Subtotal of Base Price for the entire Structural/Architectural work complete, in accordance with the drawings and specifications (identified as 001 Base Bid), but excluding work provided described in Line Item 1A, 1C – 1GG and 2 - 12.
1 EA $_
1C Subtotal of Base Price for the entire Fire Protection work complete, in accordance with the drawings and specifications (identified as 001 Base Bid), but excluding work provided described in Line Item 1A – 1B, 1D – 1GG and 2 - 12.
1 EA $_
1D Subtotal of Base Price for the entire Mechanical and Plumbing work complete, in accordance with the drawings and specifications (identified as 001 Base Bid), but excluding work provided described in Line Item 1A – 1C, 1E – 1GG and 2 - 12.
1 EA $_
1E Subtotal of Base Price for the entire Electrical work complete (including communication and electronic safety and security system work), in accordance with the drawings and
1 EA $_
specifications (identified as 001 Base Bid), but excluding work provided described in Line Item 1A – 1D, 1F – 1GG and 2 - 12.
1F Subtotal of Base Price for the entire Civil Earthwork, Utilities and Site Improvements including Demolition and Excavation work complete outside of building parameters, in accordance with the drawings and specifications (identified as 001 Base Bid), but excluding work provided described in Line Item 1A – 1E, 1G – 1GG and 2 - 12.
1 EA $_
1G Subtotal of Base Price for the entire Building Removals/Demolition work complete, in accordance with the drawings and specifications (identified as 001 Base Bid), but excluding work provided described in Line Item 1A – 1F, 1H – 1GG and 2 - 12.
1 EA $_
1H Subtotal of Base Price for the entire work associated with removal of existing industrial equipment and process related hazardous materials (identified as 002), but excluding work provided described in Line Item 1A – 1G, 1I – 1GG and 2
- 12.
1 EA $_
1I Subtotal of Base Price for the entire work associated with the management/abatement and removal of hazardous materials (identified as 003), but excluding work provided described in Line Item 1A – 1H, 1J – 1GG and 2 - 12.
1 EA $_
1J Subtotal of Base Price for the entire work associated with providing utility connections to Existing Trailer 1 and Existing Trailer 2 (identified as 004), but excluding work provided described in Line Item 1A – 1I, 1K – 1GG and 2 - 12.
1 EA $_
1K Subtotal of Base Price for removing rock and providing
15 CY $_ $_
backfill, but excluding work provided described in Line Item 1A – 1J, 1L – 1GG and 2 - 12.
1L Subtotal of Base Price for removal of soils for installation of new structure and replacement with fill as detailed, but excluding work provided described in Line Item 1A – 1K, 1M – 1GG and 2 - 12.
15 CY $_ $_
1M Subtotal of Base Price for LCM (Paint): Remove paint containing lead, cadmium, and/or chromium from existing building surfaces, but excluding work provided described in Line Item 1A – 1L, 1N – 1GG and 2 - 12.
200 SF $_ $_
1N Subtotal of Base Price for ACM (Pipe Insulation):
Remove asbestos-containing pipe insulation, but excluding work provided described in Line Item 1A – 1M, 1O – 1GG and 2 - 12.
50 LF $_ $_
1O Subtotal of Base Price for ACM (Pipe Fittings): Remove asbestos-containing pipe fittings, but excluding work provided described in Line Item 1A – 1N, 1P – 1GG and 2
- 12.
10 EA $_ $_
1P Subtotal of Base Price for ACM (Joint Compound):
Remove asbestos-containing joint compound at plaster or drywall finishes, but excluding work provided described in Line Item 1A – 1O, 1Q – 1GG and 2 - 12.
50 LF $_ $_
1Q Subtotal of Base Price for ACM (Sealants): Remove asbestos-containing sealants, but excluding work provided described in Line Item 1A – 1P, 1R – 1GG and 2 - 12.
50 LF $_ $_
1R Subtotal of Base Price for ACM (Flooring): Remove asbestos-containing floor tile and mastics, but excluding work provided described in Line Item 1A – 1Q, 1S – 1GG and 2 - 12.
50 SF $_ $_
1S Subtotal of Base Price for ACM (Debris): Remove asbestos-containing debris from trenches, but excluding work provided described in Line Item 1A – 1R, 1T – 1GG and 2
- 12.
50 LF $_ $_
1T Subtotal of Base Price for LCM (Debris): Remove lead-, cadmium-, and/or chromium-containing dust and debris, but excluding work provided described in Line Item 1A – 1S, 1U – 1GG and 2 - 12.
100 SF $_ $_
1U Subtotal of Base Price for PLM Testing: Provide sampling and testing of suspected asbestos-containing materials using PLM Analysis, but excluding work provided described in Line Item 1A – 1T, 1V – 1GG and 2 - 12.
10 EA $_ $_
1V Subtotal of Base Price for TEM Testing: Provide sampling and testing of suspected asbestos-containing materials using TEM Analysis, but excluding work provided described in Line Item 1A – 1U, 1W – 1GG and 2 - 12.
10 EA $_ $_
1W Subtotal of Base Price for Paint Testing: Provide sampling and testing of suspected lead-, cadmium-, and/or chromium-containing paint – RCRA 8 Analysis, but excluding work provided described in Line Item 1A – 1V, 1X – 1GG and 2 - 12.
15 EA $_ $_
1X Subtotal of Base Price for Dust Testing: Provide sampling and testing of suspected lead-, cadmium-, and/or chromium-containing dust – RCRA 8 Analysis, but excluding work provided described in Line Item 1A – 1W, 1Y – 1GG and 2 - 12.
10 EA $_ $_
1Y Subtotal of Base Price for PCB Testing: Provide sampling and testing of suspected PCB-containing materials, but excluding work provided described in Line Item 1A – 1X, 1Z – 1GG and 2 - 12.
10 EA $_ $_
1Z Subtotal of Base Price for Industrial Hygienist, but excluding work provided described in Line Item 1A – 1Y, 1AA – 1GG and 2 - 12.
1 DAY $_ $_
1AA Subtotal of Base Price for Micropiles: Provide micropiles, including testing, but excluding work provided described in Line Item 1A – 1Z, 1BB – 1GG and 2 - 12.
60 LF $_ $_
1BB Subtotal of Base Price for Pile Load Test: per additional 20’ of micropiles, but excluding work provided described in Line Item 1A – 1AA, 1CC – 1GG and 2 - 12.
1 EA $_ $_
1CC Subtotal of Base Price for Drilling Spoils: Remove drilling spoils generated in conjunction with micropile installation. This item includes excavation, stockpiling, testing, handling and disposal, but excluding work provided described in Line Item 1A – 1BB, 1DD – 1GG and 2 - 12.
4 CY $_ $_
1DD Subtotal of Base Price for Replace damaged wood strip flooring (2nd floor), but excluding work provided described in Line Item 1A – 1CC, 1EE – 1GG and 2 - 12.
300 SF $_ $_
1EE Subtotal of Base Price for Replace damaged wood bead board ceiling (2nd floor), but excluding work provided described in Line Item 1A – 1DD, 1FF – 1GG and 2 - 12.
120 SF $_ $_
1FF Subtotal of Base Price for Masonry Crack Repairs, but excluding work provided described in Line Item 1A – 1EE, 1GG and 2 - 12.
50 LF $_ $_
1GG Subtotal of Base Price for Debris: Remove miscellaneous debris (garbage, abandoned utilities, equipment) throughout building, but excluding work provided described in Line Item 1A – 1FF and 2 - 12.
100 CY $_ $_
2 Option Item No. 1: Furniture, Furnishings, and Equipment (FF&E). Price for providing work in connection with labor, Government Estimated Price:
HAR
Percent
(NTE
5%)
HAR
Subtotal
Total
FF&E
Estimated Price material, equipment, transportation, and supervision required for the FF&E, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item (identified as Option Item 1), but excluding work provided described in Line Item 1 – 1GG and 3 - 12.
[$233,363]
3 Option Item No. 2: Total Price for the entire work for Option Item 2, in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 EA $_
3A Subtotal of Option Item 2 for the entire work associated with Industrial Equipment:
procurement/installation of new equipment (identified as Option Item 2), but excluding work provided described in Line Item 1 – 2, 3B and 4 - 12.
Government Estimated Price:
[$1,695,370
HAR
Percent
(NTE
5%)
HAR
Subtotal
Total
FF&E
Estimated Price
3B Subtotal of Option Item 2 for the entire work associated with industrial equipment, including installation of government procured and provided equipment and associated utilities (identified as Option Item 2), but excluding work provided described in Line Item 1 – 2, 3A and 4 - 12.
1 EA $_
4 Option Item No. 3: Price for providing radon fans and associated wiring/controls at third floor radon vents (identified as Option Item 3), but excluding work provided described in Line Item 1 - 3 and 5 – 12.
1 EA $_
5 Option Item No. 4: Price for providing work complete the Electronic Security Systems (ESS), including Intrusion Detection Systems (IDS), Access Control System (ACS), and Video Surveillance Systems (identified as Option
Item 4), but excluding work
Item 1 - 4 and 6 - 12.
Note that provision of supporting permanent infrastructure is included in item 1A. (“Supporting permanent infrastructure” includes electronic door strikes, door-hardware, cable pathways, junction boxes, pullstrings, power connections, exterior duct banks, manholes, and utility connections.).
6 Option Item No. 5: Price for providing work associated with additional existing wood window repairs (identified as Option Item 5), but excluding work provided described in Line Item 1 - 5 and 7 - 12.
1 EA $_
7 Option Item No. 6: Not applicable.
8 Option Item No. 7: Price for providing work associated with Additional Annex Repairs (identified as Option Item 7), but excluding work provided described in Line Item 1 - 7 and 9 - 12.
1 EA $_
9 Option Item No. 8: Price for providing work associated with Additional Finishes (identified as Option Item 8), but excluding work provided described in Line Item 1 - 8 and 10 - 12.
1 EA $_
10 Option Item No. 9: Price for providing work associated with Electrical Service Infrastructure (identified as Option Item 9), but excluding work provided described in Line Item 1 - 9 and 11 - 12.
1 EA $_
11 Option Item No. 10: Price for Resinous Flooring (identified as Option Item 10), but excluding work provided described in Line Item 1 - 10 and 12.
1 EA $_
12 Option Item No. 11: Price for Communication Service Routing (identified as Option
TOTAL PRICE FOR Line Items 1 - 12 $_
GENERAL BID NOTES
a. Award will be made on the total sum of Line Item 1.
b. The Government reserves the unilateral right to award Line Items 6through 12 to the Contractor at the proposed price within 365 calendar days after the contract award. A firm fixed proposed price is required for Line Items 2 through 12. No provision is made for economic price adjustment. If Line Items 6 through 12 are exercised, the contract completion date remains 622 calendar days after the award of the contract. If Option 3 is exercised, 40 days will be added to the contract completion date.
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for Line Item 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
d. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
e. If any of Line Items 2 through 12 are exercised, additional bonding and consent of surety is required.
Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
Item 11), but excluding work
Item 1 - 11.