About this file

This is an Internal Services Requirements List (ISRL) form for the B60 Production Facility Repairs project at Portsmouth Naval Shipyard (PNSY), Kittery, Maine, under SIOP e-Project #1740579. The form documents equipment and services inventories across multiple building systems and must be completed at the end of each contract phase and submitted to the government no less than 90 days prior to occupancy.

The form requires comprehensive tracking of existing and new equipment across numerous categories including janitorial accessories and cleaning services, fire suppression systems (fire pumps, sprinklers, deluge systems, foam systems), HVAC equipment (boilers, furnaces, air compressors), plumbing systems (backflow preventers, water coolers), electrical systems (emergency generators, lightning protection), building infrastructure (overhead doors, elevators, gutters and downspouts), and grounds/facility maintenance services (refuse removal, pest control, snow removal). The document details specific equipment instances already inventoried, such as a 2500 GPM fire pump (Cummins 6BTA59F diesel-driven Peerless pump) in the Annex Fire Pump Room, a 60 KW diesel emergency generator, and a hydraulic elevator in Building 60. The finishes section itemizes 78 distinct rooms and spaces across first floor, mezzanine, and second floor areas with varying flooring types (concrete, vinyl composition tile, sheet vinyl, carpet tile, wood) and square footage ranging from 16 to 7,127 square feet. An accessories section specifies quantities of fixtures such as toilets, urinals, sinks, mirrors, water coolers, lockers, and dispensers for designated bathroom and break room locations.

View the file

Other files

File Type Posted
AMENDMENT 0011 Attachments.zip ZIP file
Solicitation Amendment N6247026R00120011 SF 30.pdf PDF
Att. GG) Amendment 0011 Attachment Table of Contents.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
171_P-103_R1_AMENDMENT 010.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
132_AE601_R1_AMENDMENT 010.pdf PDF
275_ET102_R1_AMENDMENT 010.pdf PDF
182_P-601_R2_AMENDMENT 010.pdf PDF
126_AE511_R1_AMENDMENT 010.pdf PDF
101_AE121_R1_AMENDMENT 010.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
173_P-105_R1_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
186_MD102_R1_AMENDMENT 010.pdf PDF
169_P-101_R1_AMENDMENT 010.pdf PDF
177_P-109_R1_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
677 attach Attic_AFPR.pdf PDF
161_Q-601_R2_AMENDMENT 010.pdf PDF
170_P-102_R1_AMENDMENT 010.pdf PDF
Solicitation Amendment N6247026R00120010 SF 30.pdf PDF
175_P-107_R1_AMENDMENT 010.pdf PDF
01 30 10.00 22_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0010.pdf PDF
115_AE402_R1_AMENDMENT 010.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
18_HM101_R1_AMENDMENT 009.pdf PDF
07 22 00_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Equipment

NAVFAC Internal Services Requirements List
Project Name B60 Production Facility Repairs - SIOP: e-Project#1740579
**** this form needs to be filled out at the end of each phase of the contract and turned into the government no less than 90 days prior to occupancy***
CURRENT INVENTORY - FILLED OUT BY GOVERNMENTFILLED OUT BY CONTRACTORINFORMATION ONLYNEW INVENTORY - CONTRACTOR
Janitorial Accessories & Cleaning Services Required - ** ATTACH FLOOR PLAN CADD FILE **A
Room Use (Administration / Bathroom / Kitchenette / Locker Room, etc) and Room NumberRoom #INFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesRoom Use (Administration / Bathroom / Kitchenette / Locker Room, etc)Room NumberFlooring Type (VCT, Resilient, Carpet, Ceramic, Concrete, Wood, other)Square Footage (Include Shower Floors)Planned Number of OccupantsShower Square FootageQuantities(Dispensers MUST be compatible with existing Paper and Soap Products. Consult with FSC)equipment to include in this report are:Square Footage of RoomFlooring Type (VCT, Tile, Carpet)Wall Type (Tile or Sheetrock) %Use (Admin/ Bathroom / Kitchenette, etc)# of anticipated occupantsManufacturerModel NumberSerial Number*Attach CAD file of building
FloorsWallsToiletsUrinalsSinksMirrorsWater FountainsLockersPaper Towel DispensersToilet Paper DispensersSoap DispensersSoap (Grit) DispensersPaper Towel DispensersSoap DispensersSquare Footage of RoomFlooring Type (VCT, Tile, Carpet)Wall Type (Tile or Sheetrock) %Use (Admin/ Bathroom / Kitchenette, etc)# of anticipated occupantsManufacturerModel NumberSerial Number*Attach CAD file of building
See Finishes TabToilet Paper DispensersRecessed Trash Cans
FlooringFixtures
Fire Suppression
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTFire Pump DataFire Pump Driver Datasystems to include in this report are:Pre ActivationDelugeD-DripAir CompressorFire PumpsPump DataStand PipeCO2Wet ChemicalDry ChemicalFoamClean AgentRange Hoods
ManufacturerGPMManufacturerModelSerial #HPRPMAutomatic Sprinkler SystemsGas Systems
Fire Pump1Annex (Fire Pump Room)XFire Pumps and DriversChemical Systems1DieselCummins6BTA59F2082500Peerless2500 GPM2
Wet Pipe Sprinkler System1First Floor, Second Floor, and MezzaninesXXXAir CompressorsRange HoodsElectricMarathonXF404TSTDS7026HNW1001775Peerless2500 GPM
Stand PipesFoam Systems
Drum Drips
Fire Alarm Systems Equipment (not applicable @ PNSY)
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesControl PanelHeat and Smoke DetectorsAddressable SystemHorn Strobessystems to include in this report are:ModelMBHFuelCertification ExpirationNational Board Number
ManufacturerModelTypeSmoke or HeatMfgrModelYes or NoQuantityFire Alarm System ComponentsModelMBHFuelCertification ExpirationNational Board Number
Boilers, Furnaces, Heating Equipment
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTManufacturerModelSerial #MBHFuelDate of Manufacturesystems to include in this report are:ModelMBHFuelCertification ExpirationNational Board Number
Boilers
Furnaces
HVAC (not applicable @ PNSY - Shops maintained)
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTquantityUnique IDManufacturerModelSerial #Tonnage / HP# of FiltersSize of FiltersBelt SpecsRefrigerantsystems to include in this report are:ModelMBHFuelCertification ExpirationNational Board Number
Major HVAC Components
Boilers and Unfired Pressure Vessels (UPV) Certification
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTBoiler or UPVDescriptionNational Board #USN NumberDate Inspectedsystems to include in this report are:ModelMBHFuelCertification ExpirationNational Board Number
Boilers
Pressure Vessels
Back Flow Preventers
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTLocation
Floor #ManufacturerModelSerial #SizeTypeSystem installed in

Burdick, Laurence E CIV NAVFAC MIDLANT, PWD Maine: Water systems include but limited to;

Fire Suppression, Heat Makeup, Building Feed

systems to include in this report are:Model NumberSerial NumberSize (1",3" etc)Type of Back Flow (BLDG FEED, Heat Make up etcFrequency
Back Flow Preventers2Inspection 112, Mech 115111Backflow Prevention Devices
Emergency Generators
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTManufacturerModelSerial #KWHPsystems to include in this report are:Serial NumberKWHPFuel Type
Diesel generator1Adjacent to Building 60XEmergency generators
Water Cooler Filters
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTFloorWater CoolerFiltersystems to include in this report are:FloorOutlet LocationOutlet #Outlet Type (floor/wall mount)ManufacturerModel #Serial NumberFilter Model Number
MfgrModel #Model #Water Sentry Y/NWater CoolersFloorOutlet LocationOutlet #Outlet Type (floor/wall mount)ManufacturerModel #Serial NumberFilter Model Number
Water Cooler Filters0Shop 111, Shop 207 wtr clr filters deleted per Shipyard Request
Gutters & Downspouts
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTGuttersDownSpoutsRoof Drainssystems to include in this report are:LF above 30'LF below 30'# of DropsDownspout Size 4" etcLF above 30'LF below 30'#of Roof Drains
SizeMaterialHeightLengthMaterial# of DropsSizeHeightQuantityLow Sloped RoofsLF above 30'LF below 30'# of DropsDownspout Size 4" etcLF above 30'LF below 30'#of Roof Drains
Overhead Doors
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTDoor #WidthHeightManufacturerType

Burdick, Laurence E CIV NAVFAC MIDLANT, PWD Maine: Type:

U-M Upper Acting Sectional Wood U-M Upper Acting Sectional Metal RMC Rolling Metal Curtain VLM-W Vertical Lift, Single/Multi-Sectional Wood VLM-M Vertical Lift, Single/Multi-Sectional Metal S-M Sliding Metal F Fabric

Fire Door Y / NElectric / ManualInterior / ExteriorVoltagesystems to include in this report are:HeightManufacturerType (U-M RMP)Condition
Overhead Coiling Door1West side Exteriorxx1Overhead Doors
Motion Activated Glass Doors
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTModel NumberSerial NumberDimension Height Widthsystems to include in this report are:HeightManufacturerType (U-M RMP)Condition
Motion Activated Doors
Low Sloped Roof
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTRoofing MaterialYear InstalledEave HeightSquare FootageRoof Drawing Included?systems to include in this report are:Model NumberSQ/FT
Low Sloped Roofs
Elevator
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTSpeed (FPM)# of StopsCapacity (Pounds)ManufacturerInstallerDate InstalledVTE Type

Burdick, Laurence E CIV NAVFAC MIDLANT, PWD Maine: VTE Types:

PE/E - Electric Passenger Elevator PE/H - Hydraulic Passenger Elevator WL/E - Electric Wheelchair Lift FE/E - Electric Freight Elevator FE/H - Hydraulic Freight Elevator D/E - Electric Dumbwaiter

Rope Gripper Y/NSiesmic InstalledSmoke Detectors Y/NShunt Trip Y/NFire Extinquisher Y/NMachineroom Sprinklers Y/Nsystems to include in this report are:ManufacturerMFG DateType (FE/H)
Hydraulic Elevator1 eaBuilding 60XVTEs
Elevator Sump Pump1Elevator ShaftX
Lightning Protection
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTquantityProvide drawings showing Lightning Protection Equipment and locationssystems to include in this report are:ManufacturerModel NumberSerial Number
Lightning Protection System1Building 60XLightning Protected buildings
Storm Water Management Soil Filters, Ponds, etc.
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTProvide Drawings Showing Desgn and Location of OWSsystems to include in this report are:
Storm Water Management Systems Equipment
Oil and Water Separators
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTProvide Drawings Showing Desgn and Location of OWSsystems to include in this report are:Model NumberSerial Number
Oil Water Separators
Motorized Gate / Turnstile
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTModel NumberSerial Numbersystems to include in this report are:Model NumberSerial NumberDimension (Hieght, Width)Total Liner Feet of Fencing
Other ST Recurring Services
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTquantityInclude in this report are Systems and Equipment not listed above including but not limited to;Model NumberSerial NumberDimension (Hieght, Width)Total Liner Feet of Fencing
UPS SystemsAutomatic Transfer Switch
Consult with FSC, FMD, and CI before filling outSewage Lift StationsCatch Basins
the Other ST Recurring Services section
Other FX Recurring Services
ServicequantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesServices to Include but not limited toPlacement Location
Grounds MaintenanceRefuse Removal
Consult with FSC, FMD, and CI before filling outPest ControlSnow Removal
the Other FX Recurring Services section

Finishes

NAVFAC Internal Services Requirements List
Project Name: B60 Production Facility Repairs - SIOP e-Project# 1740579
**** this form needs to be filled out at the end of each phase of the contract and turned into the government no less than 90 days prior to occupancy***
CURRENT INVENTORY - FILLED OUT BY GOVERNMENTFILLED OUT BY CONTRACTORINFORMATION ONLYNEW INVENTORY - CONTRACTOR
Janitorial Cleaning Services Required - ** ATTACH FLOOR PLAN CADD FILE **A
Room Use (Administration / Bathroom / Kitchenette / Locker Room, etc) and Room NumberRoom #INFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesRoom Use (Administration / Bathroom / Kitchenette / Locker Room, etc)Room NumberFlooring Type (VCT, Resilient, Carpet, Ceramic, Concrete, Wood, other)Square Footage (Include Shower Floors)Planned Number of OccupantsShower Square Footageequipment to include in this report are:Square Footage of RoomFlooring Type (VCT, Tile, Carpet)Wall Type (Tile or Sheetrock) %Use (Admin/ Bathroom / Kitchenette, etc)# of anticipated occupantsManufacturerModel NumberSerial Number*Attach CAD file of building
FloorsWallsPaper Towel DispensersSoap DispensersSquare Footage of RoomFlooring Type (VCT, Tile, Carpet)Wall Type (Tile or Sheetrock) %Use (Admin/ Bathroom / Kitchenette, etc)# of anticipated occupantsManufacturerModel NumberSerial Number*Attach CAD file of building
Toilet Paper DispensersRecessed Trash Cans
StairFirst FloorXStairConcrete84
MechanicalFirst FloorXMechanicalConcrete300
StorageFirst FloorXStorageConcrete340
StorageFirst FloorXStorageConcrete75
Chemical StorageFirst FloorXChemical StorageConcrete325
ProductionFirst FloorXProductionConcrete174
MillingFirst FloorXMillingConcrete500
ProductionFirst FloorXProductionConcrete7830
ProductionFirst FloorXProductionConcrete556
ProductionFirst FloorXProductionConcrete520
StairFirst FloorXStairConcrete42
CorridorFirst FloorXCorridorConcrete98
StorageFirst FloorXStorageConcrete415
StorageFirst FloorXStorageConcrete275
StairFirst FloorXStairConcrete145
MenFirst FloorXMenWood Floor275
WomenFirst FloorXWomenConcrete185
HazmatFirst FloorXHazmatConcrete200
Annex Space 1First FloorXAnnex Space 1Concrete1940
Annex Space 2First FloorXAnnex Space 2Concrete583
Annex LoadingFirst FloorXAnnex LoadingConcrete525
Annex ShedFirst FloorXAnnex ShedConcrete155
Elev001First FloorXElev001Sheet Vinyl Flooring108
Elev001AFirst FloorXElev001AConcrete101
Stair002AFirst FloorXStair002AConcrete235
Stair003AFirst FloorXExisting Stairs are a character defining featureStair003AConcrete284
Stair004AFirst FloorXStair004AConcrete111
Vestibule101First FloorXVestibule101Concrete255
Corridor102First FloorXCorridor102Concrete492
Corridor103First FloorXCorridor103Concrete1006
Corridor104First FloorXCorridor104Concrete195
Men105First FloorXMen105Concrete129
Women106First FloorXWomen106Concrete166
Custodial107First FloorXCustodial107Concrete22
Office108First FloorXWalls are character defining featuresOffice108Concrete207
Storage109First FloorXStorage109Concrete808
Shop110First FloorXShop110Concrete1061
Shop111First FloorXShop111Concrete6690
Inspection112First FloorXInspection112Concrete430
Network113First FloorXNetwork113Concrete107
Electrical114First FloorXElectrical114Concrete213
Mech115First FloorXMech115Concrete307
Annex116First FloorXAnnex116Concrete1981
Annex117First FloorXAnnex117Concrete640
Annex118First FloorXAnnex118Concrete536
Break RoomFirst Floor Mezzanine - WestXBreak RoomSheet Vinyl750
LockersFirst Floor Mezzanine - WestXLockersSheet Vinyl565
StairFirst Floor Mezzanine - WestXStairConcrete306
Open OfficeFirst Floor Mezzanine - EastOpen OfficePlywood330
Open OfficeFirst Floor Mezzanine - EastOpen OfficePlywood410
Stair002BFirst Floor Mezzanine - WestXStair002BConcrete235
Stair003BFirst Floor Mezzanine - WestXStair003BConcrete292
Stair004BFirst Floor Mezzanine - WestXStair004BConcrete29
Break RoomM101First Floor Mezzanine - WestXBreak RoomM101Solid Vinyl Tile1021
Blind VendingM102First Floor Mezzanine - WestXBlind VendingM102Solid Vinyl Tile230
CorridorM103First Floor Mezzanine - WestXCorridorM103Solid Vinyl Tile138
CustodialM104First Floor Mezzanine - WestXCustodialM104Concrete25
LockersM105First Floor Mezzanine - WestXLockersM105Solid Vinyl Tile408
MechanicalM106Mechanical MezzanineXMechanicalM106Concrete16
Fire PumpM107First Floor Mezzanine - EastXFire PumpM107Concrete237
Mechanical MezzanineM107Mechanical MezzanineXMechanical MezzanineM107Concrete656
UtilityM108Mechanical MezzanineXUtilityM108Concrete223
Mechanical MezzanineM109Mechanical MezzanineXMechanical MezzanineM109Concrete533
StairSecond floorXStairConcrete198
OfficeSecond floorXOfficeVinyl Composition Tile196
CorridorSecond floorXCorridorVinyl Composition Tile280
OfficeSecond floorXOfficeVinyl Composition Tile360
LockedSecond floorXLockedVinyl Composition Tile472
ClassroomSecond floorXClassroomVinyl Composition Tile780
OfficeSecond floorXOfficeVinyl Composition Tile245
OfficeSecond floorXOfficeVinyl Composition Tile245
ProductionSecond floorXProductionExisting Wood5125
OfficeSecond floorXOfficeVinyl Composition Tile330
ProductionSecond floorXProductionVinyl Composition Tile800
OfficeSecond floorXOfficeVinyl Composition Tile240
ConferenceSecond floorXConferenceVinyl Composition Tile565
CorridorSecond floorXCorridorVinyl Composition Tile300
LockedSecond floorXLockedVinyl Composition Tile128
WomenSecond floorXWomenRubber Tile135
MenSecond floorXMenRubber Tile125
Stair003CSecond FloorXStair003CConcrete89
Stair004CSecond FloorXStair004CConcrete91
Stair005Second FloorXStair005Concrete131
Corridor201Second FloorXCorridor201Sheet Vinyl179
Custodial202Second FloorXCustodial202Sheet Vinyl19
Women203Second FloorXWomen203Sheet Vinyl134
Men204Second FloorXMen204Sheet Vinyl58
Expressing205Second FloorXExpressing205Sheet Vinyl67
Upholstery206Second FloorXUpholstery206Refinished Wood1046
Shop207Second FloorXShop207Refinished Wood7127
Open Office208Second FloorXOpen Office208Carpet Tile782
Training209Second FloorXTraining209Carpet Tile492
Office210Second FloorXOffice210Carpet Tile145
Multi-Purpose211Second FloorXMulti-Purpose211Refinished Wood195
Corridor212Second FloorXCorridor212Refinished Wood306
Electrical213Second FloorXElectrical213Refinished Wood49
Network214Second FloorNetwork214Refinished Wood132

Mezzanine M201 Second Floor Mezzanine X Mezzanine M201 Exist Wood 1072

ACCESSORIESRoom NumberQuantities(Dispensers MUST be compatible with existing Paper and Soap Products. Consult with FSC)
ToiletsUrinalsSinksMirrorsWater CoolersLockersPaper Towel DispensersToilet Paper DispensersSoap DispensersSoap (Grit) Dispensers
1041
1052122121
106222121
1071
1141
M101222
M103312
M1041
M10580
2011
2041111
2051
2061122111
207422131
2091

File details come from the government source that posted it. Updated .