J-0200000-14_Construction_Work_Proposal_Template_AMEND_0012.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
West Sound (BOS) Services in the state of Washington, at the following major installations, located in Kitsap and Jefferson Counties in Washington State
Solicitation number
N6247018R3002
Issued by

About this file

This pre-solicitation notice describes a forthcoming request for proposal for base operations support services in Washington state. The solicitation will be for a single-award indefinite-delivery/indefinite-quantity contract with both recurring and non-recurring work items. Services will include facilities management, fire and emergency services, wastewater, transportation, and environmental services at naval installations in Jefferson, Kitsap, and Pierce counties. The contract term will be one base year plus seven option years not exceeding 96 months total. Proposals will be due in February 2019 and award is anticipated in early 2019. The incumbent contract held by Chugach Federal Solutions is valued at approximately $32.9 million annually for recurring work and $34.5 million for non-recurring work. The NAICS code is 561210 and size standard is $38.5 million.

J-0200000-14_Construction_Work_Proposal_Template_AMEND_0012.xlsx

View the file

Other files

File Type Posted
N62470-18-R-3002_AMEND_0017.pdf PDF
1503060_J_Pavement_Clearance_Amendment_0017_.pdf PDF
N62470-18-R-3002_AMEND_0016.pdf PDF
J-0200000-12_ELINs_Amendment_0015.xlsx XLSX spreadsheet
N62470-18-R-3002_AMEND_0015.pdf PDF
1501000_J_Facility_Management_Amendment_0014.pdf PDF
1502000_J_Facility_Investment_Amendment_0014.pdf PDF
AMENDMENT_0014.pdf PDF
0200000_J_Management_and_Administration_Amendment_0014.pdf PDF
AMENDMENT_0013.pdf PDF
J-3_Final_Award_Fee_Plan_AMEND_0013.pdf PDF
J-0200000-13_Service_Work_Proposal_TemplateAMEND_12.xlsx XLSX spreadsheet
AMEND_0012.pdf PDF
Attachment_J-8_Small_Business_Participation_and_Commitment_Strategy_AMEND_0012.pdf PDF
AMEND_0011.pdf PDF
AMEND_0010.pdf PDF
AMEND_0009.pdf PDF
AMEND_0008.pdf PDF
Amendment_0007.pdf PDF
Attachment_J-9_Small_Business_Subcontracting_Plan_template_Amendment_0006.pdf PDF
Attachment__J-1__DD_Form_254_Draft_amendment_0006.pdf PDF
AMEND_0006.pdf PDF
J-10_SITE_VISIT_LIST_OF_ATTENDEES_{AMENDMENT_0005}.pdf PDF
AMEND_0005.pdf PDF
J-11_SITE_VISIT_PRESENTATION_{AMENDMENT_0005}.pdf PDF
AMEND_0004.pdf PDF
J-0200000-05_-_Service_Provider_Information_Amendment_0004.xlsx XLSX spreadsheet
J-3_Award_Fee_Plan_DRAFT_0003.pdf PDF
AMEND_0003.pdf PDF
Attachment_J.F-1_Section_F_Deliverables.xlsx XLSX spreadsheet
AMEND_02.pdf PDF
N62470-18-R-3002_Amendment_0001.pdf PDF
0402000_C_Fire_and_Emergency_Services_Amendment_0001.pdf PDF
J-1502010-06_NAVFAC_Maximo_Asset_Inventory_Amendment_0001.xlsx XLSX spreadsheet
ATTACHMENT_B__Section_B,_Supplies_or_Services_and_Prices_Amendment_0001.pdf PDF
J-0200000_Management_and_Administration.pdf PDF
N6247018R3002_RFP.pdf PDF
Attachment_F.5_Section_F_Deliverables.xlsx XLSX spreadsheet
J-0200000-12_Exhibit_Line_Item_Numbers.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS
It is anticipated that the J.G-2 will only be utilized for Non-Pre-Priced Construction Task Orders and will not be used for Recurring Work contract modifications.
1Preparation of Nonrecurring Work Task Order ProposalsIn response to the Government's Request for Proposal (RFP), the Contractor shall submit a price proposal utilizing the appropriate template in Section G. The RFP will direct the contractor to provide either a proposal that includes competitive subcontractor quotes or is developed from the most current version of a widely accepted estimating tool such as R.S. Means. Any proposal that contradicts the pricing methodology instructed in the RFP will be rejected. Price proposals shall be accompanied by a technical proposal and necessary documentation indicating that adequate planning was performed to accomplish the requirement identified in the RFP. Documentation may include an estimated project duration if the project completion time will be different than what is specified in the RFP, contractor prepared drawings/sketches, catalog cuts, or a preliminary schedule indicating: mobilization, submittals, material lead times, performance, phasing, etc. Regardless of the preparation method, the Contractor is responsible for submitting proposals that are complete, accurate, and reasonable in price. The proposal shall be valid for 60 calendar days from date of proposal submission unless otherwise specified in the RFP. Typically proposals are due between 14 and 30 days from issuance of RFP. For approximately five percent of RFP, the Contractor shall be prepared to respond to emergent and urgent requests requiring due dates to be within two to five days. The Contractor may submit a written request to extend the proposal due date, stating the reasons for the request. Additionally, the Contractor may have pre-proposal inquiries (PPIs) requiring a Government response. All PPIs shall be submitted in writing utilizing the PPI format by the date indicated in the RFP. Inquiries shall state a specific reference section/paragraph/page of the RFP or SOW (including SOW Attachments). Incomplete PPIs may be rejected and/or returned for corrections.

Proposal submissions shall include the following:

I. Cover Letter (See Additional Instructions Item #3) II. Technical (See Additional Instructions Item #4) III. Price (Shall include Excel version of appropriate template in Section G):

If R.S. Means is selected as the commercially available estimating tool, the City Cost Index for Tacoma, WA, shall be used for preparation of proposals for work that will be performed in Kitsap and Jefferson Counties. For work in other locations, the Contractor shall select the nearest city to which work will be performed.

Proposals prepared via competitive subcontractor quotes shall include the following information for each offeror 1) the total number and cost of direct labor hours to perform the project, 2) the total cost of materials, 3) the total cost of equipment,4) any other allowable direct cost as defined in the FAR, 5) total for mark-ups (overheads) (G&A) and 6) total for profit. The contractor shall attempt to obtain at least three competitive quotes from offerors commercially engaged in the type of work required in the Statement of Work (SOW); however, competition will be considered to be achieved with two subcontractor quotes. The Government will consider quotes competitive quotes when the variance between the high and low price is 15-20%, and will not require additional pricing breakout (See Item #6). The Contractor shall provide additional pricing information on MAJOR elements, definable features of work, or tasks of the SOW for the selected competitive quote when the variance between the high and low is greater than 20% (See Item #7). Discussions may be necessary to clarify provided pricing to ensure the SOW was fully understood or review provided calculations. In the event pricing is only obtained from one subcontractor, additional pricing information may be sought for the MAJOR elements, definable features of work, or tasks of the SOW to ensure there is a full understanding of the work to be performed and allow for a determination of price fairness and reasonableness OR, with the contracting officer’s agreement, the proposal may be resubmitted using a commercially available estimating tool (See Item Numbers 2-10).

2 FAR 15.403-4 requires certified current cost and pricing data be required for procurements which exceed the threshold, which is currently $2,000,000 $750,000, unless an exception from FAR 15.403-1(b)(4) applies, in which case the contracting officer shall not require certified cost or price data to support the contract action, but may require data other than certified cost or pricing data. Because non-pre-priced modifications and task orders for Contractor self performed work will be awarded without benefit of price competition, work awarded to the Contractor which exceeds $750,000 will require cost or pricing data and a certificate of current cost or pricing data unless an exception applies. Where subcontractor's are concerned, should an exception not apply, the same requirement for cost or pricing data applies when the subcontract exceeds $750,000. Per FAR 15.403-1, the following situations would not require cost or pricing data.

1. A subcontract is price competed.

2. The prices agreed upon are based on prices set by law or regulation. (Applies to prime and subcontractor work.)

3. When a commercial item is being acquired (Applies to prime and subcontractor work.)

4. When a wavier has been granted. (Would require the Government obtain a waiver.)

5. When modifying a contract or subcontract for commercial items.

3The contract contains the clauses 52.215-11, Price Reduction for Defective Certified Cost or Pricing Data - Modifications and 52.215-13, Subcontractor Certified Cost or Pricing Data - Modifications. The Prime Contractor and its subcontractor's shall automatically provide the required Certificate of Current Cost or Pricing Data at the conclusions of negotiations whenever it is required as outlined by FAR 15.403-4 and an exception does not apply.
4A cover letter shall accompany the proposal and shall at a minimum include: Contract and Work Order Number, Project Title, Proposal Type (e.g. competed, single source, or R.S. Means), Number of Offerors Solicited and Received (competitive quotes), Performance Period, Proposed Price, Proposal Validation Period (if other than 60 days), and Name/Title/Signature of person authorized to sign the proposal.
5Regardless of pricing methodology, the technical proposal shall include a proposed construction schedule, Site Visit Attendance Roster of subcontractors (competitive quotations) or, list of planned sub-contractor(s) (R.S. Means) and other documents required by the RFP. Proposal must be supported by necessary documentation to indicate that adequate planning has been done to accomplish the requirement as identified in the RFP.
6When submitting proposals which contain price competition of subcontracts, the Contractor shall submit a summary of the price quotes received on the Competed Subcontractors tab, indicate which quote was accepted, and if not the lowest price, explain why the lowest price was not acceptable, such as the price quote did not include all of the work or the reasons why the Contractor's technical proposal was unacceptable (e.g. the price quote did not include all of the work or the reasons why the Contractor's technical proposal was unacceptable).
7When submitting proposals requiring additional pricing information, including single source, the Contractor shall provide at a minimum the following items on the Subcontractor Estimating Tool tab:

a. Detailed Breakdown of Subcontractor Direct Labor

b. Detailed Breakdown of Subcontractor Direct Materials

c. Detailed Breakdown of Subcontractor Equipment Material, labor, and equipment related to one task shall be included on the same row. Mark-ups, overhead, and profit shall be calculated separately on the Construction Work Summary tab and not included as lump sum.

8The Contractor may submit proof that a single source subcontractor's price is fair and reasonable by providing a copy of a GSA catalog price which is very close in price to the single source proposed price; however, the GSA catalog must clearly demonstrate that the supply or service being proposed is an identical item.
9When submitting a proposal based on a widely accepted estimating tool on the Subcontractor Estimating Tool tab such as RS Means, the Contractor shall state the name, date, and version of the tool utilized, so that the Government may verify the accuracy of the proposal. Additionally, when submitting Pre-Priced Work, the Contractor shall provide the Excel format of the proposal. Waste and Excess Quantities are included in Completed-in-Place Construction Quantities. All prices in R.S. MEANS Cost Data Books are for completed-in-place construction unless explicitly described otherwise. Waste or excess material quantities are incidental costs that are included within the contract mark-up rate unless explicitly stated otherwise. Quantities used on individual Task Order proposals shall be taken from field measurement or drawings, as appropriate, without allowance for waste.
10The Contractorshall not edit gray shaded calculation cells.
11Additional instructions will be provided on how to complete this form on each worksheet.

&"Times New Roman,Regular"&10J-0200000-14

&UCONSTRUCTION WORK PROPOSAL TEMPLATE - &A

&"Times New Roman,Regular"&10N62470-18-R-3002 Page &P of &N

Construction Work Summary

CONSTRUCTION WORK SUMMARY - PROPOSAL TEMPLATEDATE:
CONTRACT TITLE:CONTRACT NO:
FEAD OFFICE:WORK ORDER NO:
DESCRIPTION:
PRIME CONTRACTOR'S WORKRevisions/Comments
1Direct Materials*0.00
2Direct Labor*0.00
3Direct Equipment*0.00
4SUBTOTALAdd lines 1-30.00
5Mark-Up Rate% of line 40.00
6SUBTOTALAdd lines 4 and 50.00
Prime Remarks:
SUBCONTRACTOR'S WORKRevisions/Comments
7Direct Materials*
8Direct Labor*
9Direct Equipment*
10SUBTOTALadd lines 7-90.00
11Field Mark-Up Ratemultiply line 11 rate by line 100.00
12SUBTOTALadd lines 10 and 110.00
13Home Office Mark-up Ratemultiply line 13 rate by line 120.00
14SUBTOTALadd lines 12 and 130.00
15Profitmultiply line 15 rate by line 140.00
16SUBTOTALAdd Lines 14 and 150.00
Sub Remarks:
17Prime Contractor's Workfrom line 60.00
18Prime's Profit on Prime's Workmultiply line 18 rate by line 170.00
19TOTAL FOR PRIME WORKadd lines 17 and 180.00
20Subcontractor's Workfrom line 160.00
21Prime's Mark-up on subcontractormultiply line 21 rate by line 200.00
22SUBTOTALadd lines 20 and 210.00
23Prime's Profit on Subcontractor's Workmultiply line 23 rate by line 220.00
24TOTAL FOR SUBCONTRACTOR WORKadd lines 22 and 230.00
25Bonds
26TOTAL PRICE FOR ALL WORKadd lines 19, 24, and 250.00
Estimate time (extension) and justification:
Prime Contractor Name:
Subcontractor Name:
Signature & Title of preparerDate

This proposal template applies to non-pre-priced construction work. The RFP will specify the template.

1Add an additional price column after column G for each option in the task order to allow pricing a separate option CLIN.
2If multiple subcontractors are utilized and each have different overheads and profit, lines 7 through 16 will have to be duplicated for each subcontractor.
3Link Direct Costs From Subcontractor's Worksheet(s) to lines 7 through 9.
4The profit rate for the prime and the subcontractor(s) will be negotiated based on complexity.
5Subcontractor Field and Home Officer Mark-up Rates which exceed 10% and 3%, respectively, requires that the subcontractor provide a DCAA audit or if not available a workbook which demonstrates how the Mark-up Rates were calculated.

&"Times New Roman,Regular"&10J-0200000-14

&UCONSTRUCTION WORK PROPOSAL TEMPLATE - &A

Page &P of &N

Prime Contractor

PROPOSAL FOR CONTRACTOR PERFORMED CONSTRUCTION WORK TASK ORDERS AND MODIFICATIONS
Contractor Name, Estimating Tool Name, Date, and Version:
ITEMS OF WORKDIRECT MATERIALDIRECT LABORRentalDIRECT EQUIPMENTMARK-UP RATEPROFITSUB TOTAL
#Description/Task/Definable Feature of WorkQtyUnitUnit CostTotal CostHoursWage RateTotal CostOwnedQtyRateTotal0%0%
10.000.000.00$0.00$0.00$0.00
20.000.000.00$0.00$0.00$0.00
30.000.000.00$0.00$0.00$0.00
40.000.000.00$0.00$0.00$0.00
50.000.000.00$0.00$0.00$0.00
60.000.000.00$0.00$0.00$0.00
70.000.000.00$0.00$0.00$0.00
80.000.000.00$0.00$0.00$0.00
90.000.000.00$0.00$0.00$0.00
100.000.000.00$0.00$0.00$0.00
110.000.000.00$0.00$0.00$0.00
120.000.000.00$0.00$0.00$0.00
130.000.000.00$0.00$0.00$0.00
140.000.000.00$0.00$0.00$0.00
150.000.000.00$0.00$0.00$0.00
160.000.000.00$0.00$0.00$0.00
170.000.000.00$0.00$0.00$0.00
180.000.000.00$0.00$0.00$0.00
190.000.000.00$0.00$0.00$0.00
200.000.000.00$0.00$0.00$0.00
210.000.000.00$0.00$0.00$0.00
220.000.000.00$0.00$0.00$0.00
230.000.000.00$0.00$0.00$0.00
240.000.000.00$0.00$0.00$0.00
250.000.000.00$0.00$0.00$0.00
Prime Contractor's DIRECT TOTALS0.000.00RTotal (Rental)0.000.000.000.00
OTotal (Owned)0.00
1Contractor should widen the column and/or row width and use wrap text as needed to display the full item description. The description must include either the a full description of the task, the labor classification, type of material, type of equipment, or RS Means line number.
2Make a duplicate of the above spreadsheet for each option if a task order contains option(s).
3Material, labor, and equipment related to one task should be included on the same row.

&"Times New Roman,Regular"&10J-0200000-14

&UCONSTRUCTION WORK PROPOSAL TEMPLATE - &A

Page &P of &N

Competed Subcontractors

PROPOSAL FOR SUBCONTRACTOR PERFORMED CONSTRUCTION WORK USING COMPETITION
Name of Selected Subcontractor:
ITEMS OF WORKDIRECT MATERIALDIRECT LABORDIRECT EQUIPMENTFIELD MARK-UPH.O. MARK-UPPROFITSUB TOTALPRIME MARK-UPPRIME PROFITSUB TOTAL
#Description/Task/Definable Feature of WorkCostHoursCostCost0%0%0%0%0%
1$0.00$0.00$0.00$0.00$0.00$0.00$0.00
2$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3$0.00$0.00$0.00$0.00$0.00$0.00$0.00
4$0.00$0.00$0.00$0.00$0.00$0.00$0.00
5$0.00$0.00$0.00$0.00$0.00$0.00$0.00
6$0.00$0.00$0.00$0.00$0.00$0.00$0.00
7$0.00$0.00$0.00$0.00$0.00$0.00$0.00
8$0.00$0.00$0.00$0.00$0.00$0.00$0.00
9$0.00$0.00$0.00$0.00$0.00$0.00$0.00
10$0.00$0.00$0.00$0.00$0.00$0.00$0.00
11$0.00$0.00$0.00$0.00$0.00$0.00$0.00
12$0.00$0.00$0.00$0.00$0.00$0.00$0.00
13$0.00$0.00$0.00$0.00$0.00$0.00$0.00
14$0.00$0.00$0.00$0.00$0.00$0.00$0.00
15$0.00$0.00$0.00$0.00$0.00$0.00$0.00
16$0.00$0.00$0.00$0.00$0.00$0.00$0.00
17$0.00$0.00$0.00$0.00$0.00$0.00$0.00
18$0.00$0.00$0.00$0.00$0.00$0.00$0.00
19$0.00$0.00$0.00$0.00$0.00$0.00$0.00
20$0.00$0.00$0.00$0.00$0.00$0.00$0.00
21$0.00$0.00$0.00$0.00$0.00$0.00$0.00
22$0.00$0.00$0.00$0.00$0.00$0.00$0.00
23$0.00$0.00$0.00$0.00$0.00$0.00$0.00
24$0.00$0.00$0.00$0.00$0.00$0.00$0.00
25$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontractor's DIRECT TOTALS$0.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Name of Non-Selected Subcontractor:
DIRECT MATERIALDIRECT LABORDIRECT EQUIPMENTFIELD MARK-UPH.O. MARK-UPPROFITSUB TOTAL
Total CostTotal HoursTotal CostTotal Cost
Name of Non-Selected Subcontractor:
DIRECT MATERIALDIRECT LABORDIRECT EQUIPMENTFIELD MARK-UPH.O. MARK-UPPROFITSUB TOTAL
Total CostTotal HoursTotal CostTotal Cost
Name of Non-Selected Subcontractor:
DIRECT MATERIALDIRECT LABORDIRECT EQUIPMENTFIELD MARK-UPH.O. MARK-UPPROFITSUB TOTAL
Total CostTotal HoursTotal CostTotal Cost
1Fill in data on non-selected subcontractor(s) when price is competed.
2Make a duplicate of the above spreadsheet for each option if a task order contains option(s).
3Material, labor, and equipment related to one task should be included on the same row.

&"Times New Roman,Regular"&10J-0200000-14

&UCONSTRUCTION WORK PROPOSAL TEMPLATE - &A

Page &P of &N

Subcontractor Estmating Tool

PROPOSAL FOR SUBCONTRACTOR PERFORMED CONSTRUCTION WORK USING SINGLE SOURCE OR CURRENT, WIDELY ACCEPTED ESTIMATING TOOL SUCH AS R.S. MEANS
Subcontractor Name or Estimating Tool Name, Date, and Version:
ITEMS OF WORKDIRECT MATERIALDIRECT LABORRentalDIRECT EQUIPMENTFIELD MARK-UPH.O. MARK-UPPROFITSUB TOTALPRIME MARK-UPPRIME PROFITSUB TOTAL
#Description/Task/Definable Feature of Work/MeansQtyUnitUnit CostTotal CostHoursWage RateTotal CostOwnedQtyRateTotal0%0%0%0%0%
10.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
20.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
30.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
40.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
50.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
60.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
70.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
80.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
90.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
100.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
110.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
120.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
130.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
140.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
150.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
160.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
170.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
180.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
190.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
200.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
210.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
220.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
230.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
240.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
250.000.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontractor's DIRECT TOTALS0.000.00RTotal (Rental)0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
OTotal (Owned)0.00
1Contractor should widen the column and/or row width and use wrap text as needed to display the full item description. The description must include either the a full description of the task, the labor classification, type of material, type of equipment, or RS Means line number.
2Make a duplicate of the above spreadsheet for each option if a task order contains option(s).
3Make a duplicate of the above spreadsheet for each subcontractor.
4Material, labor, and equipment related to one task should be included on the same row.

&"Times New Roman,Regular"&10J-0200000-14

&UCONSTRUCTION WORK PROPOSAL TEMPLATE - &A

Page &P of &N