About this file

This pre-solicitation notice announces a forthcoming request for proposal for base operations support services at naval installations in Washington state. The proposed contract will be a single-award indefinite-delivery/indefinite-quantity, fixed-price with award fee performance-based contract for recurring and non-recurring work items including general management and administration, fire and emergency services, facilities support, wastewater, transportation, and environmental services. The tradeoff source selection process will evaluate corporate experience, technical approach, safety, and past performance along with price. The contract term is a base period of up to 12 months plus seven option periods of 12 months each, not to exceed 96 months total. The incumbent contractor provides these services under the current contract which is in the fifth option year through September 2019. The anticipated request for proposal date is January 4, 2019 with a proposal due date of February 18, 2019.

View the file

Other files

File Type Posted
N62470-18-R-3002_AMEND_0017.pdf PDF
1503060_J_Pavement_Clearance_Amendment_0017_.pdf PDF
N62470-18-R-3002_AMEND_0016.pdf PDF
J-0200000-12_ELINs_Amendment_0015.xlsx XLSX spreadsheet
N62470-18-R-3002_AMEND_0015.pdf PDF
1501000_J_Facility_Management_Amendment_0014.pdf PDF
1502000_J_Facility_Investment_Amendment_0014.pdf PDF
AMENDMENT_0014.pdf PDF
0200000_J_Management_and_Administration_Amendment_0014.pdf PDF
AMENDMENT_0013.pdf PDF
J-3_Final_Award_Fee_Plan_AMEND_0013.pdf PDF
J-0200000-13_Service_Work_Proposal_TemplateAMEND_12.xlsx XLSX spreadsheet
J-0200000-14_Construction_Work_Proposal_Template_AMEND_0012.xlsx XLSX spreadsheet
AMEND_0012.pdf PDF
Attachment_J-8_Small_Business_Participation_and_Commitment_Strategy_AMEND_0012.pdf PDF
AMEND_0011.pdf PDF
AMEND_0010.pdf PDF
AMEND_0009.pdf PDF
AMEND_0008.pdf PDF
Amendment_0007.pdf PDF
Attachment_J-9_Small_Business_Subcontracting_Plan_template_Amendment_0006.pdf PDF
Attachment__J-1__DD_Form_254_Draft_amendment_0006.pdf PDF
AMEND_0006.pdf PDF
J-10_SITE_VISIT_LIST_OF_ATTENDEES_{AMENDMENT_0005}.pdf PDF
AMEND_0005.pdf PDF
J-11_SITE_VISIT_PRESENTATION_{AMENDMENT_0005}.pdf PDF
AMEND_0004.pdf PDF
J-0200000-05_-_Service_Provider_Information_Amendment_0004.xlsx XLSX spreadsheet
J-3_Award_Fee_Plan_DRAFT_0003.pdf PDF
AMEND_0003.pdf PDF
Attachment_J.F-1_Section_F_Deliverables.xlsx XLSX spreadsheet
AMEND_02.pdf PDF
N62470-18-R-3002_Amendment_0001.pdf PDF
0402000_C_Fire_and_Emergency_Services_Amendment_0001.pdf PDF
J-1502010-06_NAVFAC_Maximo_Asset_Inventory_Amendment_0001.xlsx XLSX spreadsheet
ATTACHMENT_B__Section_B,_Supplies_or_Services_and_Prices_Amendment_0001.pdf PDF
J-0200000_Management_and_Administration.pdf PDF
N6247018R3002_RFP.pdf PDF
J-0200000-12_Exhibit_Line_Item_Numbers.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION F 0200000

0200000 Management and Administration
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionDistributionFrequency
2.2.1.2N/ARequest to Work Outside Government’s Regular Working HoursAt least three working days prior to requested dayFSCM, SPARAs required
2.3.3.1N/APartnering Meeting MinutesWithin one week after the partnering meetingCORSemi-annually or as required
2.3.3.2N/APartnering CharterWithin one week after the initial partnering meetingCOREach update
2.3.4N/APermits and LicensesBefore work commences and as requested by the KOFSCMAs specified
2.3.5N/ACertificate of InsuranceWithin 15 calendar days after award.KO, CORAs specified
2.3.11N/ACost Account Code (CAC) ReportFirst work day of each monthFSCMMonthly
2.4N/AGFP Shortage NotificationNLT 30 days after contract startGPAOnce
2.4DD Form 200GFP Loss ReportWithin five working days of discovery or suspicion of discrepancyGPAPer occurrence
2.4N/AGFP Maintenance and Certification PlanNLT 60 days after contract start and October 1GPAAnnually
2.6.4N/AEmail Notification of Deliverable UploadImmediately upon upload of deliverable to websiteAs specified in this columnPer occurrence
2.6.6.2N/AService Provider Flat-fileAt the end of the following work day when updates are requiredFSCMAs required
2.6.6.2N/AAsset Flat-FileAt the end of the following work day when updates are requiredFSCMAs required
2.6.6.2N/AAsset Specification Flat-FileAt the end of the following work day when updates are requiredFSCMAs required
2.6.6.2N/ACharacteristic Meter Flat-FileAt the end of the following work day when updates are requiredFSCMAs required
2.6.6.2N/ASample Delimited Flat-FileWithin 15 calendar days after awardFSCMAs specified
2.6.6.3N/AList of Personnel Requiring MAXIMO AccountsNo later than 45 days prior to start of the contract and within seven calendar days of changesFSCMAs specified
2.6.7.1N/AQuality Management PlanNo later than 30 days prior to start of the contract and within seven calendar days of changesCOR, FSCM, SPARAs specified
2.6.7.2N/AQC Inspection FileWithin five calendar days of completion/ termination of the contractFSCM, SPARAs specified
2.6.7.3N/AContractor Quality Inspection and Surveillance ReportFirst work day of each monthKO, FSCM, SPARMonthly
2.6.8N/AProperty Management PlanNo later than 30 days prior to start of the contract and within seven calendar days of changesCOR, GPAAs specified
2.6.10N/AEnergy and Water Conservation PlanNo later than 30 days prior to start of the contract and within seven calendar days of changesCOR, FSCM, SPARAs specified
2.7.1N/AOrganizational ChartWithin 15 calendar days after awardKO, COR, FSCMAs specified
2.7.1N/AKey Personnel Resumes and QualificationsNo less than 15 days prior to contract and NLT five days prior to changesKO, COR, FSCMAs specified
2.7.2.4N/AProof of Legal ResidencyPrior to be admitted to site of workKOAs specified
2.7.3N/AContractor Labor Hours (eCMRA) ReportNo later than 31 OctoberKO, FSCMAnnually
2.8.1N/AEmployee ListUpon request.KO, CORAs required
2.8.3DD Form 1172-2Application for Identification Card / DEERS EnrollmentWithin 30 working days of contract start and as changes occurSecurity SPARSemi-annually
2.8.7N/ASecurity Clearance ApplicationPrior to employee access to classified informationSecurity ManagerAs required
2.8.8FD87 & OF-306NACI ApplicationPrior to employee access to sensitive unclassified informationSecurity ManagerAs required
2.9.1N/AAccident Prevention PlanNo later than 30 days prior to start of the contract and within 15 calendar days prior to effective dates of changesCOR, FSCM, SPARAnnually, as specified
2.9.2N/AActivity Hazard AnalysisTogether with the Accident Prevention Plan15 days after modifications, and 15 days prior to effective dates of changesCOR, FSCM, SPARAs specified
2.9.3N/ACompliance Plans, Programs, and ProceduresTogether with the Accident Prevention Plan15 days after modifications, and 15 days prior to effective dates of changesCOR, FSCM, SPARAs specified
2.9.5J-0200000-03NAVFAC Contractor Incident Reporting System (CIRS)Within five calendar days of accidentKO, FSCM, SPARAs required
2.9.5J-0200000-03Weight Handling Equipment Accident ReportWithin 15 working days of accidentKO, FSCM, SPARAs required
2.9.5J-0200000-03Crane and Rigging Gear Near Miss ReportWithin 15 working days of accidentKO, FSCM, SPARAs required
2.9.7N/AMonthly On-Site Labor ReportFirst work day of each monthKO/SPARMonthly
2.9.8N/AOSHA Citations and Violations Corrective Action ReportWithin 48 hours after receiving a citationFSCM, SPAR, IEOAs required
2.9.12N/ASafety Certifications30 days prior to contract start and within 10 days of old certifications expiration.FSCM, SPAR, IEOAs specified
2.10.1N/AEnergy & Water Conservation PlanNo later than 30 days prior to start of the contract and within seven calendar days of changesCOR, SPAR, IEOAs specified
2.10.2N/AEnvironmental Protection PlanNo later than 30 days prior to start of the contract and within seven calendar days of changesCOR, FSCM, SPAR, IEOAs required
2.10.2.1N/AClass I ODS ReportWithin 24 hours following delivery of refrigerant to DLAIEOAs required
2.10.2.5N/AEmergency Planning and Community Right-To-Know Act (EPCRA) ReportWithin 15 calendar days after contract award and not less than 10 working days prior to planned use of hazardous materialFSCM / IEOAs specified
2.10.2.5J-0200000-03Contractor Hazardous Material Inventory LogWithin 15 calendar days after the end of each calendar year and at termination of the contractFSCM / IEOAnnually
2.10.2.7Protection of Archaeological, Historical, and Natural ResourcesImmediately upon discovery and as updatedKO, SPAR, IEOMonthly
2.10.2.11.3Storm Water Pollution Prevention at Construction SitesNot less than 15 working days prior to planned constructionIEOAs specified.
2.10.2.13Licensed Underground Storage Tanks (USTs)30 day prior to start of contractIEOAnnually
2.10.3N/ASustainable Procurement and Practices PlanNo later than 30 days prior to start of the contract and within seven calendar days of changesCOR, SPAR, IEOAnnually
2.10.3N/ASustainable Delivery of Services ReportWithin five calendar days after each contract periodSPAR, IEOAnnually
2.10.3.2N/ARecovered Material Certification15 days prior to useSPAR, IEOAs specified
2.11N/AMission Essential Contractor Services PlanNo later than 30 days prior to start of the contract and within seven calendar days of changesKO, COR, SPARAnnually
2.15.2.1J-0200000-13 or
J-0200000-14Nonrecurring Work ProposalIndicated in RFPKOPer request
2.15.2.1.1N/ABurdened Labor RatesNLT 15 days prior to the start of the period of performanceKOAnnually
2.16N/AMobilization PlanWithin 15 day after award of contractKO, COR, FSCMNone
2.17N/ADemobilization PlanUpon notificationKO, COR, FSCMNone
NMIC1503020 – Pest Control
1503020/2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/2.3.1N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.2N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.4N/AEquipment Calibration and Droplet Analysis Report15 days prior to the start of work and after every 50 hours of ULV equipment use.KO, COR, EVAs required
1503020/2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2Pest Control Trouble Calls
1503020/3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
NMIC1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
1503050 _ Grounds
1503050/2.3.7.1N/AWater Conservation PlanAs specifiedKO, COR, EV30 days after award/Annually
1503050/3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050/3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050/3.4N/ADebris Removal ScheduleAs specifiedKO, CORAs required
1503060 Pavement Clearance
1503060/3.1.1N/ASchedule for Pavement Sweeping ServicesWithin 30 calendar days after contract awardKO, CORAs required
1503060/3.2.1.1Snow Removal PlanWithin 30 calendar days after contract awardKO, CORAs required

FortWashington Custodial

1503010/2.2.1N/APathogen Training PlanUpon requestKOUpon request
1503010/3.1N/AAnnual Work Schedule1 each yearKOWithin 15 days after award and annually thereafter
1503010/3.1N/AMonthly Work PlanFirst work day of each monthKOMonthly
1503010/3.2N/AUnscheduled Services ReportFirst work day of each monthKOMonthly
FortWashington1503020 – Pest Control
1503020/2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/2.3.1N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.2N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2N/APest Control Trouble Calls
1503020/3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
FortWashington1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
FortWashington1503050 _ Grounds
1503050/3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050/3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050/3.1.3N/ADebris Removal ScheduleAs specifiedKO, CORAs required

NSMA Custodial

1503010/2.2.1N/APathogen Training PlanUpon requestKOUpon request
1503010/3.1N/AAnnual Work Schedule1 each yearKOWithin 15 days after award and annually thereafter
1503010/3.1N/AMonthly Work PlanFirst work day of each monthKOMonthly
1503010/3.2N/AUnscheduled Services ReportFirst work day of each monthKOMonthly
NSMA1503020 – Pest Control
1503020/2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/2.3.1N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.2N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2N/APest Control Trouble Calls
1503020/3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
NSMA1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
NSMA1503050 _ Grounds
1503050/3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050/3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050/3.4N/ADebris Removal ScheduleAs specifiedKO, CORAs required

&A

&UDELIVERABLES

N62470-18-R-3002 Page &P of &N

SECTION F 0402000

0402000 Fire and Emergency Services
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionOriginal/ CopiesFrequency
2.1 / 3N/ATraining Records and CertificationsUpon requestPARAs requested
3N/AFire Extinguisher Inspection and Maintenance Report and ScheduleBy the 5thPAR / NRNW Fire Prevention DivisionMonthly

&A

&UDELIVERABLES

Page &P of &N

SECTION F 1501000

1501000 Facility Management
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionOriginal/ CopiesFrequency
3.1.4N/AUtility Outage Scheduling ReportBy the 5thFSC BRANCH HEADMonthly
3.1.4N/AUnscheduled Outage NotificationImmediately upon identification of outageFSC BRANCH HEAD/ Annex SPARPer occurrence
3.1.4N/AUtility System Incident ReportWithin one working day of outageFSC BRANCH HEADPer occurrence
3.1.4N/AOutage Plan20 working days prior to outageFSC BRANCH HEAD, Annex SPARPer occurrence
3.1.4N/AOutage RequestNo later than 14 calendar days prior to requested outageFSC BRANCH HEAD/ Naval Hospital Facilities Operations DepartmentPer occurrence
3.1.5N/AExcavation Permit Issuance ReportBy the 5thFSC BRANCH HEADMonthly
3.2.1N/ASummary of NAVFAC MAXIMO Asset ChangesBy the 5thICAP Asset Manager, PARMonthly
3.2.3N/ARoof Inspection ScheduleOctober 5thICAP Asset Manager, PARAnnually
3.2.3N/ARoof Inspection ReportBy the 5th day of the quarterICAP Asset Manager, PARQuarterly
3.3N/AProject Submittal POAMAs requestedRequestorPer occurrence
3.3N/AProject Submittal UpdateBy the 5thRequestorMonthly
3.3N/AProject Submittal Delay NotificationImmediately upon identification of delayRequestorAs required
3.4.1N/APlans, files, and Drawing UpdatesOngoingFSC BRANCH HEADAs required
3.5.2N/ATechnical Library OperationOngoingFileAs required
3.5.2N/ATechnical Library Inventory UpdatesBy the 5th day of the quarterFSC BRANCH HEADQuarterly
NMIC1503020 – Pest Control
1503020/ 2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/ 2.3.1N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.2N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.4N/AEquipment Calibration and Droplet Analysis Report15 days prior to the start of work and after every 50 hours of ULV equipment use.KO, COR, EVAs required
1503020/ 2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2Pest Control Trouble Calls
1503020/ 3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
NMIC1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
1503050 _ Grounds
1503050 /2.3.7.1N/AWater Conservation PlanAs specifiedKO, COR, EV30 days after award/Annually
1503050 /3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050 /3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050 /3.4N/ADebris Removal ScheduleAs specifiedKO, CORAs required
1503060 Pavement Clearance
1503060/3.1.1N/ASchedule for Pavement Sweeping ServicesWithin 30 calendar days after contract awardKO, CORAs required
1503060/3.2.1.1Snow Removal PlanWithin 30 calendar days after contract awardKO, CORAs required

Fort Washington Custodial

1503010/ 2.2.1N/APathogen Training PlanUpon requestKOUpon request
1503010/ 3.1N/AAnnual Work Schedule1 each yearKOWithin 15 days after award and annually thereafter
1503010/ 3.1N/AMonthly Work PlanFirst work day of each monthKOMonthly
1503010/ 3.2N/AUnscheduled Services ReportFirst work day of each monthKOMonthly
Fort Washington1503020 – Pest Control
1503020/ 2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/ 2.3.1N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.2N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2N/APest Control Trouble Calls
1503020/ 3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
Fort Washington1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
Fort Washington1503050 _ Grounds
1503050 /3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050 /3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050 /3.1.3N/ADebris Removal ScheduleAs specifiedKO, CORAs required

NSMA Custodial

1503010/ 2.2.1N/APathogen Training PlanUpon requestKOUpon request
1503010/ 3.1N/AAnnual Work Schedule1 each yearKOWithin 15 days after award and annually thereafter
1503010/ 3.1N/AMonthly Work PlanFirst work day of each monthKOMonthly
1503010/ 3.2N/AUnscheduled Services ReportFirst work day of each monthKOMonthly
NSMA1503020 – Pest Control
1503020/ 2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/ 2.3.1N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.2N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2N/APest Control Trouble Calls
1503020/ 3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
NSMA1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
NSMA1503050 _ Grounds
1503050 /3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050 /3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050 /3.4N/ADebris Removal ScheduleAs specifiedKO, CORAs required

&A

&UDELIVERABLES

Page &P of &N

SECTION F 1502000

1502000 Facility Investment
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionOriginal/ CopiesFrequency
3N/AEquipment / System Breakdowns and Service InterruptionsFollowing working dayFSC Branch HeadPer occurrence
3N/AWork Exceeding Contractors Liability NotificationWithin 24 hours of discoveryFSC Branch HeadAs required
3.1N/AService Order Status ReportTuesdays or the first day of the monthFSC Branch Head & PAR, PWD FOSWeekly
3.1N/AWork Exceeding Contractors Liability Report with RS Means EstimateFive Calendar days of discoveryFSC Branch Head, PAR, PWD FOSAs required
3.1N/AService Order Report with Scanned DocumentsOn TuesdaysFSC Branch Head, PAR, PWD FOSWeekly
3.1N/AService Order NotificationUpon response and completion of Service OrderBuilding MangerPer occurrence
3.1.2N/AUrgent Service Order Extension RequestUpon identification of delayFSC Branch Head, PAR, or designated Customer RepresentativesAs required
3.1.3N/ARoutine Service Order Extension RequestUpon identification of delayFSC Branch Head, PAR, or designated Customer RepresentativesAs required
3.2N/APreventive Maintenance Program Plan120 days after contract startFSC Branch Head/PARSAnnually
3.2N/APreventive Maintenance Program Schedule7th day of the month starting quarterFSC Branch Head/PARQuarterly
3.2N/AAsset Discrepancy and Validation ReportFirst Tuesday of the monthFSC Branch Head, PAR , PWD FOSMonthly
3.2N/APM Report (open, complete, deferred, cancelled, extended, incidental repairs) ReportTuesdays or the first day of the monthFSC Branch Head & PARS, PWD FOSWeekly
3.2N/AUnaccomplished PM ReportTuesdays or the first day of the monthFSC Branch HeadWeekly
3.2N/ARepairs Exceeding Liability LimitWithin 24 hours of identificationFSC Branch Head /PARAs required
3.2N/AMaintenance Procedure Updates10th day of the monthFSC Branch Head, PAR, PWD FOSBi-Monthly
3.2N/AMaintenance Program Metrics10th day of the monthFSC Branch HeadQuarterly
3.2N/AMaintenance Program Plan30 days prior to contract startFSC Branch Head/PARSAnnually
3.2N/ATechnical Feedback RequestAs neededFSC Branch Head, PARAs required
3.2N/ANotification of Repair Work Exceeding Incidental Repairs LimitWithin 24 hours of identification that repairs will exceed the limitFSC Branch HeadPer occurrence
3.2.4N/ASecondary Containment Spills, Releases, or Leak NotificationImmediately upon identification for outside of containment and within one day for inside of containmentFSC Branch Head & IEOAs required
3.2.5N/AGrounding Structures Coating Report5th day of the monthSPARMonthly
3.2.6N/ABoiler Log BookImmediately upon completion of maintenanceOn site at each boilerAs required
3.2.4N/AStorage Tank Maintenance and Repair Summary Report3rd working day of each monthKO, FSC Branch Head / PAR and IEOMonthly
3.2.7N/ACathodic Protection Inspection, Testing, and Certification ResultsWithin 5 days of completionFSC Branch Head/PARS and IEOAs required
3.2.7N/ACathodic Protection Testing, Maintenance and Repair Summary Report10th day of the monthFSC Branch Head/PARS and IEOMonthly
3.2.8N/AFacility Grounding ReportFive days after testingNBK-NUWC; C/173 Bld. 894, NBK-BANGOR; Code PRK 232 Bld. 1101; NBK-SWFPAC; SPB 124 Bld. 6401; PSNS-IMF; Code PRK 114, Bld. 7001; NBK-NAVMAGII; Code 4411, Bld. 69Per occurrence
3.2.18N/AShips Overboard Discharge System PM Program30 days after contract startFSC Branch Head, PAR, PWD FOS, IEOAnnually
3.2.20N/ASwimming Pools Maintenance Plan30 days prior to contract start and September 1SPARAnnually
3.2.21N/AIndustrial Control System PM reportFifth working day of each monthFSC Branch Head and PAR, PWD FOSMonthly
3.2.21N/AFacility Control Preventive Maintenance and Calibration Program30 days prior to contract start. Annually on October 1KO, FSC Branch Head and PAR, PWD FOSAnnually
3.2.21N/ACS - Out of Tolerance Notices (OOTN) from SWFPAC Calibration LaboratoryWithin two working days of receiptNBK-SWFPAC; SPB 124 Bld. 6401Per occurrence, average estimated at 50 per year
3.2.21N/ACS - OOTN Monthly Summary ReportThird working day of each monthNBK-SWFPAC; SPB 124 Bld. 6401Monthly
3.2.23N/ACritical Spare Parts Blast/Poppet Valve Inventory3rd working day of each monthAnnex 15 SPAR/ SWFPAC PARMonthly
3.2.23N/AMaintenance Scheduling Problem ReportPer occurrence, within scheduled maintenance periodSWFPAC Industrial Engineering and Resources Division Head or SWFPAC PARPer occurrence, within scheduled maintenance period
3.3.1N/AWHE Accident NotificationWithin one hour of incidentSPAR, RCD, SWFPAC SPAR, CODE 751Per occurrence
3.3.1N/AWHE Accident ReportWithin ten working days of incidentSPAR, RCD, SWFPAC SPAR, CODE 751Per occurrence
3.3.1N/ASpare Parts InventoryFirst work day of each monthSPAR, RCD, SWFPAC SPAR, CODE 751Monthly
3.3.1N/AWork Exceeding 75% of Liability Limit NotificationAs specifiedSPAR, RCD, SWFPAC SPAR, CODE 751As specified
3.3.1N/AWHE Expenditure SummaryFirst work day of each monthSPAR, RCD, SWFPAC SPAR, CODE 751Monthly
3.3.1N/ARegion Capstan Status ReportWeeklySPAR, RCD, SWFPAC SPAR, CODE 751Weekly
3.3.1N/AWHE Six-Week Planning ScheduleWeeklySPAR, RCD, SWFPAC SPAR, CODE 751Weekly
3.3.1N/AWHE Category 3 Safety / Operational ChecklistsFirst work day of each monthSPAR, RCD, SWFPAC SPAR, CODE 751Monthly
3.3.1N/AWHE Status ReportOngoingSPAR, RCD, SWFPAC SPAR, CODE 751Ongoing
3.3.1N/AWHE CRO Status ReportOngoingSPAR, RCD, SWFPAC SPAR, CODE 751Ongoing
3.3.1N/AWHE Confirmed Two-Week ScheduleWeeklySPAR, RCD, SWFPAC SPAR, CODE 751Weekly
3.3.1N/AWHE Master Maintenance ScheduleFirst work day of each monthSPAR, RCD, SWFPAC SPAR, CODE 751Monthly
3.3.1N/AUnaccomplished CRO ReportQuarterlySPAR, RCD, SWFPAC SPAR, CODE 751Quarterly
3.3.1N/AList of Qualification/Certified PersonnelQuarterlySPAR, RCD, SWFPAC SPAR, CODE 751Quarterly
3.3.1N/AChange RequestAs specified in SSP OD 58507SWFPAC SPARPer occurrence
3.3.1N/ACrane Repair OrderAs specifiedSWFPAC SPARAs specified
3.3.1N/ANotification of Emergency WHE RepairAs specifiedSWFPAC SPAR, SWFPAC Crane QASAs specified
3.3.1N/ANotification of Routine WHE RepairAs specifiedSWFPAC SPAR, SWFPAC Crane QASAs specified
3.3.1N/ACrane Processing Completion ReportAs specifiedSWFPAC SPARAs specified
3.3.1N/ATechnical Feedback ReportWithin 14 days after observance.SPAR, RCD, CODE 751As required
3.3.1N/AWHE Work PackagesWithin 14 days after observance.SPAR, RCD, CODE 751As specified
3.3.1N/AWHE In-process Inspection NotificationMinimum of four hours prior to the inspectionSPAR, RCD, CODE 751As required
3.3.1N/AWork Process to Address Load Bearing, Load Controlling, and Operational Safety Device DeficienciesAs specifiedSPAR, RCD, CODE 751As specified
3.3.1N/ACrane Repair OrderAs specifiedSPAR, RCD, CODE 751As specified
3.3.1N/ANotification of Emergency WHE RepairAs specifiedSPAR, RCD, CODE 751As specified
3.3.1N/ANotification of Routine WHE RepairAs specifiedSPAR, RCD, CODE 751As specified
3.3.1N/AReport of Defect/DeficiencyAs specifiedSPAR, RCD, CODE 751As specified
3.3.1N/AWHE Certification PackageAs specifiedSPAR, RCD, CODE 751As specified
3.3.1N/AWHE Inspection and Test Anticipated Weight Test ScheduleWeeklySPAR, RCD, SWFPAC SPAR, CODE 751Weekly
3.3.1N/AWritten Responses to Audit and Plan of Action and Milestones for Deficiency CorrectionWithin ten working days of receipt of audit reportSPAR, RCD, SWFPAC SPAR, CODE 751As specified
3.3.1N/AWHE Inspection, Maintenance, and Repair ScheduleOngoingSPAR, RCD, SWFPAC SPAR, CODE 751Ongoing
3.3.1N/ALubrication Laboratory Analysis ReportWithin ten working days of receipt of reportWeight Handling Equipment Test/Inspection Division (N441.32)Each occurrence
3.3.1.1N/AWork Plan and Schedule for WHE Specialized ServicesWithin two working days of requestSPAR, RCD, SWFPAC SPAR,As specified
3.3.1N/ACrane Processing Completion ReportUpon completion of maintenanceSWFPAC SPARAs specified
3.3.1N/AReport of Defect/DeficiencyAs specifiedSWFPAC SPAR, SWFPAC Crane QASAs specified
3.3.1N/AReport of Defect/DeficiencyWithin 24 hours of identification.SPAR, RCD, CODE 751As required
3.3.1N/A“Window” Extension RequestAs specifiedSPAR, RCD, CODE 751As specified
3.3.1N/AWork Package Completion NotificationNLT 24 hours prior to scheduled work package completionSPAR, RCD, CODE 751As required
3.3.2N/AMaintenance Scheduling Problem ReportWithin scheduled maintenance periodSWFPAC Industrial Engineering and Resources Division Head or SWFPAC PARPer occurrence
3.3.2N/ACritical Spare Parts Inventory High Security Doors3rd working day of each monthAnnex 15 SPAR/ SWFPAC PARMonthly
3.4N/AInspection, Testing, and Certification Schedule3rd working day of each monthFSC Branch Head, PAR, PWD FOSMonthly
3.4N/AInspection, Testing, and Certification Program30 days prior to contract startFSC Branch Head, PAR, PWD FOSAnnually
3.4.1N/ABoiler and UPV Testing, Inspection and Certification Summary ReportWithin two working days of inspectionGovernment Certified Boiler & UPV InspectorAs required
3.4.1N/ABoiler NESHAP ReportJanuary 30 for previous yearIEOAnnually
3.4.3N/ARailroad and Ground Level Track Certification Report3rd working dayNBK-BANGOR PWD Code PRK232Monthly
3.4.3N/ATrack Testing, Inspection and Repair Summary Report5th day of the monthFSC Branch HeadMonthly
3.4.4N/ABackflow Prevention Testing and Inspection RecordsPer Department of Health cross-connection control regulations.FSC Branch Head & BEOAs required
3.4.6N/ARICE NESHAP ReportJanuary 15, April 15, July15, October 15IEOQuarterly
3.4.6N/AResults of Testing and Inspection of Over-Water Fuel SystemsWithin five days of completionFSC Branch Head, IEOAs required
3.4.6N/ASummary of Results of Testing and Inspection of Over-Water Fuel SystemsJanuary 15, April 15, July15, October 15.FSC Branch Head, IEOQuarterly
3.4.6N/APetroleum Piping, Hoses, Pressure Relief Valves and Fuel Gauges for Over the Water Fueling DiscrepanciesWithin two days of identificationFSC Branch Head & PARS, PWD FOS, IEOPer occurrence
3.4.6N/AAnnual Hose Certifications and Test ResultsNo later than 30 days prior to the recertification dateFSC Branch Head & IEOAnnually
3.4.7N/AResults of Testing and Inspection of Land Based Fueling LocationsWithin five days of completion of testingFSC Branch Head, IEOAs required
3.4.7N/ASummary of Results of Testing and Inspection of Land Based Fueling LocationsJanuary 15, April 15, July15, October 15.FSC Branch Head, IEOQuarterly
3.4.7N/APetroleum Piping, Hoses, pressure relief valves and fuel gauges for Land Based Fueling Locations defectsWithin five working days.FSC Branch Head & PARS, PWD FOS, IEOPer occurrence
3.4.10N/AStorage Tank Inspection and Repair Summary Report3rd working day of each monthKO, FSC Branch Head / PAR and IEOMonthly
3.4.10N/AResults of Testing and Inspection for Storage TanksWithin five days of completionKO, FSC Branch Head and PAR, IEOAs required
3.4.10N/ASummary of Regulatory Compliance Inspections and CertificationsJanuary 15, April 15, July 15, October 15.FSC Branch Head, PAR, IEOQuarterly
3.4.11N/AResults of Testing and Inspection of SOD SystemsWithin five days of completionFSC Branch Head, IEOAs required
3.4.11N/ASummary of Results of Testing and Inspection of SOD SystemsJanuary 15, April 15, July15, October 15.FSC Branch Head, IEOQuarterly
3.4.12N/AInspect and Test Lightning Arrestors and Grounding Devices Completion ReportFirst working day of the weekKO, FSC Branch Head and PAR, PWD FOSWeekly
3.5.2N/AHVAC Water Testing Treatment and Freeze Protection Program30 days prior to contract start and on October 1KO, FSC Branch Head and PARAnnually
3.5.2N/AHVAC Water Testing Treatment and Freeze Protection Report5th working day of October, January, April, and July of each year.KO, FSC Branch Head and PARQuarterly
3.5.4N/ABoiler Water Testing and Treatment Program30 days prior to contract start. Annually on October 1FSC Branch HeadAnnually
3.5.4N/ABoiler Water Testing ResultsFive working days from testsKO, FSC Branch Head and PARAs required
3.5.5N/ATraffic Control Devices Program Plan30 days prior to contract startFSC Branch Head and PARAnnually
3.5.5N/ATraffic Control Devices Testing Report5th working days of each monthKO, FSC Branch Head and PARMonthly
3.5.11N/ABullet Tracking ReportFirst working day of the monthKO, FSC Branch Head and PAR, PWD FOSMonthly
3.5.12N/ALock Smith Services ReportTuesdayFSC Branch Head & PAR, PWD FOSEvery other week
3.5.12N/AKey inventory of the high security keys to include Lock and Key Control Program Check Sheet.October and AprilUtilities SPAROctober and April
3.5.12N/AKey Accountable Control LogContractor s Locksmith officeAvailable for reviewAs required
3.5.13N/ACrack Mapping ReportWithin four weeks after inspectionPSNS-IMF Code PRK 114As required
3.5.14N/ADry Dock Control Inspection Reports5th working day of October, January, April, and July of each yearPSNS-IMF Code PRK 114Quarterly
3.5.16N/AWater Quality Tests and Water Analysis ReportsFirst working day of the monthPool Management – Preventative Med at Navy HospitalMonthly
3.2.17N/AStorm Water Work Performance Schedule30 days prior to contract start and October 1SPARAnnually
3.2.17N/AStorm Water Maintenance Report30 days prior to contract start/ Annually on October 1SPARQuarterly
3.5.19N/APaved and Gravel Roads, Road Shoulder and Guard Rail Inspection Plan30 days prior to contract start and by October 1FSC Branch Head, PAR, PWD FOSAnnually
3.5.20N/AParking Lot Paved and Gravel Inspection Plan30 days prior to contract start and by October 1FSC Branch Head, PAR, PWD FOSAnnually
3.5.21N/ASidewalk and Other Paved Surfaces Inspection Plan30 days prior to contract start and by October 1FSC Branch Head, PAR, PWD FOSAnnually
3.5.22N/ARoad, Parking Lot, and Pavement Marking Schedule30 days prior to contract start and by February 15.KO/FSC Branch HeadAnnually
3.5.23N/AHazardous Waste Lockers ReportWithin 10 day of maintenanceSPAR and IEOSemi-annually
3.5.23N/AHazardous Waste Lockers Non-certification NotificationWithin one working day of identificationSPAR and IEOPer occurrence
VariousN/AOperator LogsContinuous at each site that requires a log bookOn-site fileAs required
3.5.14Fuel Operation Plan90 days of contract award.SPAR and PARAnnually
3.5.14Testing Schedule90 days of contract awardSPAR and PARAnnually
3.5.14Fuel Testing ReportWith three days of testSPARPer occurrence
3.5.14Unsafe Condition NotificationWithin one hour of unsafe conditions discoverySPARPer occurrence
3.5.14Fuel Usage Report5th of the monthSPAR, PAR and UEM Billing CoordinatorMonthly
3.5.14Fuel Farm Tank Level NotificationImmediately upon discoverySPAR and PARAs required
3.5.14Fuel Delivery ReceiptsWithin three working day of receipt of fuelSPAR, PAR and UEM Billing CoordinatorAs required
3.5.14Standard Operating Procedures90 days of contract award and five days after making changesSPAR and PARAnnually
3.5.14Preventive Maintenance Program90 days of contract award and when updates are necessarySPARAnnually
3.5.14WAC 173-360 Required Testing, Certification, and Repairs DocumentationWithin 30 days of completion of activitiesIEOAs required
3.5.14Regulatory Compliance Inspections, Tests, and Certifications Report5th day after the end of a quarterIEOQuarterly
3.5.14Preventive Maintenance and Repair Monthly Status Report5th of the monthSPAR and PARMonthly

&A

&UDELIVERABLES

Page &P of &N

SECTION F 1502010

1502010 BUMED Facility Investment
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionOriginal/ CopiesFrequency
2.2.1N/ACHFM, Certified Healthcare Facility Manager CredentialsWithin 30 days after award then as requested.NHB Facility Ops. Mgr. or assigned alternate(s)Once for initial submittal, then as requested
2.2.1N/APersonnel Certification, Training, and LicensingWith one day of requestNHB Facility Ops. Mgr. or assigned alternate(s)As requested
2.3.21502010-2-3-3 Section-F-NHB-4790Above Ceiling Work PermitPrior to any above ceiling workNHB Utility Mgr. or assigned alternate(s)As required
2.3.3N/AThe Joint Commission Compliance and Documentation Plan45 days prior to contract start and first of each monthNHB Facility Ops. Mgr. or assigned alternate(s)Monthly
2.3.41502010-2-3-5-Section-F-NHB-9305.1Electrical Connection and Removal PermitPrior to any electrical connection or removalNHB Utility Mgr. or assigned alternate(s)As required
2.3.71502010-2-3-4-Section-F-NHB-11300Utility OutagesNLT 10 working days prior to outageNHB Utility Mgr. or assigned alternate(s)As required
2.3.7Utility System Incident ReportWithin 24 hours of incidentNHB Utility Mgr. or assigned alternate(s)As required
2.3.8N/ANaval Hospital Bremerton Contractor Employee Training ProgramWithin 14 days of completion of each trainingNHB Facility Ops. Mgr. or assigned alternate(s)As required
2.4Class I ODS ReportWithin 24 hours following delivery of refrigerant to DLAIEOAs required
3.1F-1502010-3-1- -NHB-Weekly-Service-Order-ReportWeekly FYTD Service Order ReportOn Monday by 0700 and end of FY report by 5 OctoberNHB Facility Ops. Mgr. or assigned alternate(s)Weekly
3.1F-1502010-3-1-NHB-Weekly-Open-Service-Order-ReportWeekly Open Service Order ReportOn Monday by 0700NHB Facility Ops. Mgr. or assigned alternate(s)Weekly
3.1F-1502010-3-1-NHB-Monthly-Completion-ReportMonthly Completed Service Order ReportOn first working date of each month by 0700, end of FY by 5 OctoberNHB Facility Ops. Mgr. or assigned alternate(s)Monthly
3.2N/APreventative Maintenance (PM) Program45 calendar days prior to contract startNHB Facility Ops. Mgr. or assigned alternate(s)Annually and as updated
3.2N/APM Schedule30 calendar days prior to contract start and first day of each month by 0700NHB Facility Ops. Mgr. or assigned alternate(s)Annually and updates monthly
3.2N/APM Program InventoryOn first working date of each month by 0700, complete initial inventory by 185 days after contract startNHB Facility Ops. Mgr. or assigned alternate(s)Monthly
3.2N/AUnaccomplished PM ReportFirst day of each month by 0700 and end of FY by 5 OctoberNHB Facility Ops. Mgr. or assigned alternate(s)Monthly
3.2N/ACondition Equipment Report5-OctNHB Facility Ops. Mgr. or assigned alternate(s)Annually
3.2F-1502010-3-2-NHB-Mainteinace-ReportPM ReportsOn Monday by 0700 including the previous dayNHB Facility Ops. Mgr. or assigned alternate(s)Weekly
3.2.6N/AFire and Smoke Damper Inventory ReportWithin 120 days of contract startNHB Facility Ops. Mgr. or assigned alternate(s)
3.2.6N/AFire and Smoke Damper Test ReportOct-21NHB Facility Ops. Mgr. or assigned alternate(s)Quadrennially
3.2.9N/AAuxiliary GeneratorsWithin 24 hours of generator testing completionNHB Utility Mgr. or assigned alternate(s)As required
3.3.8N/AQuarterly Air Flow Monitoring ReportFifth working day of each Quarter for the previous QuarterNHB Facility Ops. Mgr. or assigned alternate(s)Quarterly
3.3.8N/AAir Flow Monitoring ReportFirst working day of the week following a stayNHB Facility Ops. Mgr. or assigned alternate(s)Weekly
3.3.9NACrawl and Mechanical Space InspectionsWithin 14 days after each Quarter for the previous QuarterNHB Facility Ops. Mgr. or assigned alternate(s)Quarterly
3.4.2N/AExhaust Hoods and Ducts Cleaning Schedule30 calendar days prior to contract startNHB Facility Ops. Mgr. or assigned alternate(s)As requested
3.4.4N/AHVAC Water Testing, Treatment and Waterborne Infection Control Program30 calendar days before contract start.NHB Facility Ops. Mgr. or assigned alternate(s)Annually and as requested
3.4.4N/AHVAC Water Testing, Treatment and Waterborne Infection Control ReportWith 48 hours of requestsNHB Facility Ops. Mgr. or assigned alternate(s)As requested
3.4.6NABoiler Water Testing and Treatment Program30 calendar days before contract startNHB Facility Ops. Mgr. or assigned alternate(s)Annually and update as necessary
3.4.6NABoiler Water Testing ReportWith 48 hours of requestsNHB Facility Ops. Mgr. or assigned alternate(s)As requested
3.4.9NAElectrical Receptacles Testing DocumentationWith 48 hours of requestsNHB Facility Ops. Mgr. or assigned alternate(s)As requested in EXCEL/WORD format
3.4.10N/ADrawing UpdatesWithin 30 calendar days from completion of workNHB CAD ManagerPer occurrence
3.4.11N/AControlled Inspection ScheduleWithin 48 hours of requestNHB Facility Ops. Mgr. or assigned alternate(s)As requested
3.4.11N/AControlled Inspection ReportWithin 14 days of inspectionNHB Facility Ops. Mgr. or assigned alternate(s)Quarterly and annually
3.4.19F-1502010-3-1- -NHB-Weekly-Service-Order-ReportWeekly FYTD Locksmith Service Report1. Weekly FYTD on Monday by 0700, End of FY report by 5 OctoberNHB Facility Ops. Mgr. or assigned alternate(s)Weekly
3.4.19F-1502010-3-1-NHB-Weekly-Open-Service-Order-ReportWeekly Open Locksmith Service ReportOn Monday by 0700NHB Facility Ops. Mgr. or assigned alternate(s)Weekly
3.4.19F-1502010-3-1-NHB-Monthly-Completion-ReportMonthly Completed Locksmith Service ReportOn first working date of each month by 0700 and end of FY by 5 OctoberNHB Facility Ops. Mgr. or assigned alternate(s)Monthly
3.4.20F-1502010-3-4-20-NHB-Weekly-Bullet-ReportWeekly FYTD Bullet Report1. Weekly FYTD on Monday by 0700, End of FY report by 5 OctoberNHB Facility Ops. Mgr. or assigned alternate(s)Weekly
3.4.20F-1502010-3-4-20-NHB-Weekly-Open-Bullet-ReportWeekly Open Bullet ReportOn Monday by 0700NHB Facility Ops. Mgr. or assigned alternate(s)Weekly
3.4.20F-1502010-3-4-20-NHB-Monthly-Completion-ReporMonthly Completed Bullet ReportOn first working date of each month by 0700 and end of FY by 5 OctoberNHB Facility Ops. Mgr. or assigned alternate(s)Monthly

&A

&UDELIVERABLES

Page &P of &N

SECTION F 1503060

1503060 Pavement Clearance
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionOriginal/ CopiesFrequency
2.2F-1503060-01Pavement Clearance Map UpdateWithin 30 days of changesSPARAs required
3.1.1F-1503060-02Pavement Sweeping Schedule30 days prior to contract start and 15 days after changesSPARAnnually
3.2.1F-1503060-03Snow Removal Plan30 days prior to contract start and 15 days after changesSPARAnnually
3.2.1.1F-1503060-03Snow Management Plan30 days prior to contract start and 15 days after changesSPARAnnually

&A

&UDELIVERABLES

Page &P of &N

SECTION F 1604000

1604000 Wastewater
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionOriginal/ CopiesFrequency
3N/AIWPTP Maintenance PlanWithin 30 days of Contract start and by October 30FSC Branch Head, IEOAnnually
3N/AHW Tank Certification and Assessment ReportPrior to expiration date of previous tank integrity assessment and/or following major repairsFSC Branch Head & IEOAs required
3DD 1348-1IWPTP Treatment Completion ReportUpon completion of treatmentFSC Branch Head, IEOAs required
3N/AIWPTP Operations PlanWithin 30 days of Contract start and by October 30FSC Branch Head, IEOAnnually
3N/AIWPTP Spill PlanWithin 30 days of Contract start and by October 30FSC Branch Head, IEOAnnually

&A

&UDELIVERABLES

Page &P of &N

SECTION F 1700000

1700000 Transportation
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionOriginal/ CopiesFrequency
2.3.5.4N/ATemporary Suspension of Downtime AccumulationWithin two hours of notice to the Contractor that the material delays will cause the downtime standard to be missed.SPARAs required
3.1.1N/AMonthly "C" Pool or U-Drive-It BillingWithin five calendar days of the start of the monthSPARMonthly
3.1.1N/AMonthly “A” and “B” Vehicle/Equipment Rental BillingWithin five calendar days of the start of the monthSPARMonthly
3.1.1N/ANavy Monthly Fuel (Gasoline/Diesel) BillingWithin five calendar days of the start of the monthSPARMonthly
3.1.3N/AShuttle Bus RoutesPrior to start of contractSPARAnnually and as required for changes
3.1.5N/ATest Weight CalibrationWithin five calendar days of completionSPAR, RCDAs required
3.1.6N/AFuel Delivery ScheduleBy the 25th day of the preceding monthSPARMonthly
3.1.6N/AFuel Delivery and Fuel Accountability ReportsBy the 25th day of the preceding monthSPARMonthly
3.2N/AVehicle Mileage and Hours Odometer ReportBy the 25th day of the preceding monthSPAR, FMISMonthly
3.2.1N/ALicense Expiration Notification90 days prior to license expirationSPAR, Operator’s CommandPer occurrence
3.2.5.1N/AGSA Mileage and Fuel Usage ReportAs required by the rental agreementSPARMonthly
3.3N/AMaintenance ScheduleBy the 25th day of the preceding monthSPARMonthly
3.3N/AWork Exceeding Contractors Liability Limit NotificationWithin two hours of discoverySPARPer occurrence
3.3.1N/AVehicle Accident ReportsWithin five calendar days of the start of the monthSPARMonthly
3.3.1.2N/APM, Inspection, Testing, and Certification ScheduleAnnually and as required after repairsSPARAs required
3.3.1.2N/ATesting and Certification QualificationsPrior to start of contract, annually and, prior to a new employee starting work.SPARAs required
3.3.1.3N/APreventive Maintenance Schedule15 calendar days prior to the start of work and annually.SPARAnnually

&A

&UDELIVERABLES

Page &P of &N

SECTION F 1800000

1800000 Environmental
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionOriginal/ CopiesFrequency
2.3.1N/ATraining Plan and Documentation of Training30 days before contract start, October 15 of each yearEnvironmental SPARAnnually
2.3.1N/ATraining Records and Certifications for Contractor Personnel. See Note 1.One working day upon requestEnvironmental SPARAs Required
2.3.2N/AEnvironmental Supervisor Resume and Qualifications. See Note 2.30 days after Contract Award. Updates as required if changes are madeKO, Environmental SPARAs Required
2.3.2N/AEnvironmental Supervisor and Alternates Contact Information. See Note 3.30 days before contract start. Updates as necessaryEnvironmental SPARAs Required
2.4.1N/ALaboratory Certification/Accreditation. See Note 4.30 days before contract start. Updated as necessaryEnvironmental SPARAs Required
2.4.1N/ALaboratory Quality Management Plan. See Note 5.30 days before contract start. Updated as necessaryEnvironmental SPARAs Required
3N/AEnvironmental Services Plan30 days before contract start. October 15 of each yearEnvironmental SPARAnnually
3.1N/ASampling and Analysis and Quality Assurance Plan (SAP/QAPP)30 days before contract start. October 15 of each yearEnvironmental SPARAnnually
3.1.2, 3.3.4, 3.4.2, 3.6.1, 3.6.2, 3.6.3N/ALaboratory Analysis ReportsReport results as specifiedIEOper each recurring or unscheduled sample. Electronic copy (MSWord or Adobe Acrobat)
3.2.2N/AUsed Oil/Mixed Fuel Status Report3rd working day of following monthIEOMonthly
3.2.2N/AUsed Oil and Mixed Fuel Disposal and Recycling Summary Report15-JanIEOAnnually
3.3N/AGovernment IEO Site Specific Waste Profile Form (e.g. WIS/WGR). See Note 6As RequiredIEOAs Required
3.3.1NAContainer Delivery Report3rd working day of following monthIEOMonthly
3.3.1NARequest for HM/HW/ORW Accumulation Areas30 days before contract start. Updates as requiredIEOUpdates as required
3.3.1NAAccumulation Area Inspection Reports3rd working day of following monthIEOMonthly

This is the start of the file's text. The full file is on GovTribe.