AF Form 3065 Dyess Progress Report 42 Gov.pdf

Air Force Form PDF 301 KB Posted

Attached to
Repair Maintenance Shop BLDG 8040
Solicitation number
FA4661-21-R-0001
Issued by

View the file

Other versions and copies of AF Form 3065

File Revision Posted Attached to
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
Attachment C - AF Form 3065.pdf Revision not stated Airfield Blast Shield
AF Form 3065.xlsx Revision not stated Demo B5276 & B8129 Amendment 0001
Attachment G - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Robins AFB Paving Multi-Award IDIQ
SOW App 003 AF IMT 3065 Progress Report.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
FNWZ 17-0021A - Att E - AF Form 3065.xlsx Revision not stated Demo B6142
FNWZ 21-0071 - Att E - AF Form 3065.xlsx Revision not stated Demo B6119
Attachment 5 - AF FORM 3065 Contract Progress Report.pdf Revision not stated Security System Upgrades
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf Revision not stated Nellis AFB Paving IDIQ
Attachment 4_AF IMT 3065_199600401_VI_Progress Report.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 10 - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Dismantling of Modular Facility & Storage Racks
Attachment 2.8 - AF Form 3065 Progress Report Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Exhibit 7 - AF Form 3065 Contract Progress Report.pdf Revision not stated Multiple Award Task Order Contract (MATOC) Mechanical HVAC/Mechanical Maintenance, Repair and Minor Construction Work Amendment 2
BLANK SAMPLE AF Form 3065.xlsx Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
Atch 08 - AF Form 3065 Progress Report.xlsx Revision not stated B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID]
Atch BLANK SAMPLE AF Form 3065.xlsx Revision not stated Design/Build ANG ACS Weapons Facility
16. AF Form 3065 Contract Progress Report (1 page) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Atch 08 - AF Form 3065 Progress Report.xlsx Revision not stated B9992-Doc Stewart Playgrounds [PRE-SOLICITATION]
Attachment 11 - AF Form 3065.pdf Revision not stated Construct/Repair LOX Canopies
Show all 20

Who attaches AF Form 3065

Other files

File Type Posted
AF Form 3065 Dyess Progress Report 42 Gov.pdf PDF
12-0053 Addendum Four - New Contractor (11-19-20) v2.doc DOC document
12-0053 Addendum Three - New Contractor (11-9-20).pdf PDF
Solicitation Amendment FA466121R00010001 SF 30.pdf PDF
12-0053 Attachment C - Contractor Pricing Breakdown 11.29.16.xlsx XLSX spreadsheet
MS 004 Staging Plan.pdf PDF
MS 039 HM Doors Frames and Hardware.pdf PDF
MS 026 Cove Base Submittal.pdf PDF
MS 032 Concrete Vapor Barrier.pdf PDF
MS 042A Overhead Coiling Doors.pdf PDF
MS 030 Steel Shop Drawings.pdf PDF
MS 024 MBCI Panel Roof and Color Chart.pdf PDF
MS 037 MBCI and Welding Certifications.pdf PDF
MS 044 Casework.pdf PDF
MS 079 Radius Bullnose for Doorways.pdf PDF
MS 007 Mech and Plumb Consumables.pdf PDF
MS 027-028 Metal Slat Fencing - Color.pdf PDF
MS 011 Fire Alarm and Mass Notification MS 005a.pdf PDF
MS 025 VCT.pdf PDF
MS 070 Water Meter Specifications.pdf PDF
MS 073 Breakroom Sink Type and Color.pdf PDF
MS 031A Toilet Partions and Accessories.pdf PDF
MS 016 HVAC Controls.pdf PDF
MS 055 South Structural Steel.pdf PDF
MS 006 Mech and Plumb.pdf PDF
MS 008 Abatement Plan.pdf PDF
MS 069 Sidewall Sprinkler Head.pdf PDF
MS 076 Backflow Preventer.pdf PDF
MS 064 Dryvit Backstop Air Barrier.pdf PDF
MS 021 HVAC.pdf PDF
MS 050 Welder Certification.pdf PDF
MS 083 Aerospace Air Shower Substitution.pdf PDF
MS 030 Steel Shop Drawings Page 2.pdf PDF
MS 029 Anchor Rod Shop Drawings and Details.pdf PDF
MS 001 QC Plan.pdf PDF
MS 065 Concrete Test Reports.pdf PDF
MS 020A Electrical Transformer.pdf PDF
MS 041 Toilet Accessories and Fire Ext.pdf PDF
MS 022 Louvers and Color Chart.pdf PDF
MS 035 Geotech Compaction Testing.pdf PDF
MS 078 078A Overhead Doors Warranty.pdf PDF
MS 023 Metal Panels.pdf PDF
MS 047 28 Day Concrete Test Results.pdf PDF
MS 061 Masonry Sealant Substitution.pdf PDF
MS 066 Roof Flashing.pdf PDF
REF 12 0053 PR 42 Thru 09 30 2019.xlsx XLSX spreadsheet
MS 010 Insulation.pdf PDF
MS 067 Steel Building Certifications.pdf PDF
MS 052 CMU Specs and Certs.pdf PDF
MS 036 MBCI Panels.pdf PDF
Show 40 more

Latest 50 of 163 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDRESS

REPORT NO. PERIOD COVERED PROJECT NO. CONTRACT NO. COMPLETION Date 42 From 16 Sept. Thru 30 Sept.2019 FNWZ 12-0053 20-Oct-19

LINE % OF % COMPLETED % COMPLETED

NO. TOTAL JOB THIS PERIOD CUMULATIVE

1 0.11% 0.00% 0.11% 2 1.10% 0.00% 1.10% 3 1.10% 0.00% 1.10% 4 2.20% 0.00% 2.20% 5 Remediation Testing 1.10% 0.00% 1.10% 6 2.20% 0.00% 2.20% 7 3.75% 0.00% 3.75% 8 2.51% 0.00% 2.51% 9 3.30% 0.00% 3.29%

10 1.65% 0.00% 1.65% 11 9.45% 0.00% 9.44% 12 5.20% 0.00% 5.20% 13 1.43% 0.03% 1.39% 14 1.87% 0.00% 1.87% 15 19.40% 0.00% 19.34% 16 4.95% 0.00% 4.94% 17 2.75% 0.40% 2.15% 18 2.75% 0.00% 2.74% 19 4.95% 0.03% 4.91% 20 1.87% 0.01% 1.85% 21 2.75% 0.01% 2.75% 22 2.75% 0.00% 0.00% 23 0.55% 0.00% 0.55% 24 1.10% 0.00% 1.09% 25 Tape, Float, Texture, & Paint 1.76% 0.01% 1.74% 26 2.20% 0.11% 1.44% 27 1.21% 0.00% 0.00% 28 3.85% 0.25% 3.25% 29 1.65% 0.00% 0.98% 30 0.77% 0.00% 0.00% 31 1.65% 0.00% 0.00% 32 0.95% 0.00% 0.00% 33 0.55% 0.00% 0.00% 34 Fire Suppression Finishout 1.10% 0.75% 1.00% 35 1.40% 0.00% 1.40% 36 Exterior Fencing 1.65% 0.00% 0.83% 37 0.18% 0.00% 0.00% 38 0.07% 0.00% 0.00% 39 0.22% 0.00% 0.00%

1.60% 87.87%

REMARKS: All of the fire suppression piping is installed and tested. All of the walls in the north end and restrooms are covered with kerdi board and tile has begun. All floors are leveled. The painting of the fire suppression lines are ongoing. Refrigeration piping testing is ongoing and insulation is still being done on the pipes. Electrical installation is ongoing. West overhead door was fixed per CE's request. Remaining doors, hardware, cabinets and accessories along with bollards and fencing will be on the next report due on 20 Oct.

Scheduled: 96.53% Through 30 Sept. 2019 Actual: 87.87%

SIGNATURE DATE

Wayne Owens 9/30/2019

SIGNATURE DATE

SIGNATURE DATE

HVAC Equipment And Removal / Stored and Onsite (Compressor Tanks, Stack)

Fire Suppression Rough-In, !ncludes Materials onsite From Previous Submittal

Wall Insulation

Toilet Partitions, Cabinets, & Counters

Concrete Foundation Demolition

Wall Framing

Exterior Sheathing New, /Removal Of Old,/ Column 12 N.End Removal,/ Removal Of Perlins

Doors & Frames

Interior Framing & Sheathing / Structural Steel

Roof Framing

CMU

Windows

Electrical Rough-In

Plumbing Rough-In Fire Alarm / MNS Rough-In

FA4661-15-D-0002

Repair Maintenance Shop BLDG 8040

Bonds

Submittals

3401 S Gevers St # 1, San Antonio, TX 78210

CONTRACT PROGRESS REPORT OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person sall be subject to any penalty for failing to comply with a collection of information if t does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 AIR FORCE PENTAGON, WASHINGTON DC 20330-1060.

CONTRACTOR

TYPE OR PRINT NAME AND TITLE

FARR Builders llc

WORK ELEMENT

TOTAL 100.00%

At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments

PROGRESS OR COMPLETION CERTIFICATE

I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.

SUBMITTED BY OR FOR

CONTRACTOR BASE CIVIL ENGINEER

1.60% 87.87%

Mobilization

Remediation

Framing And Electrical Demolition

Concrete Foundations & Slabs

Wayne Owens, PS

REVIEWED BY OR FOR BASE CIVIL ENGINEER

TYPE OR PRINT NAME AND TITLE

Daryl Carnes Construction Inspector

REVIEWED BY OR FOR CONTRACTING OFFICER

TYPE OR PRINT NAME AND TITLE

O&M & As-Builts

HVAC Rough-In

Exterior Asphalt & Concrete

Wall Sheathing

Ceramic & Porcelain Tile / Kerdi

Electrical Fixtures Onsite And Installed Plumbing Fixtures Restroom Accessories Guard Rail & Bollards HVAC Start-Up Fire Alarm / MNS Testing

Demolition Of Existing South End Steel

Interior & Exterior Signage Contractor Punchlist