Atch 08 - AF Form 3065 Progress Report.xlsx

Air Force Form XLSX spreadsheet 18 KB Posted

Attached to
B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID]
Solicitation number
FA485522B0005
Issued by

About this file

This document contains a federal contract opportunity solicitation for playground installation services and a contractor progress report template. The solicitation seeks bids to remove and install one toddler and one youth playground structure at Cannon Air Force Base in New Mexico. The scope of work includes demolition, concrete work, playground installation, grading, rubber mulching, and adherence to all applicable codes and regulations. Bids are due by the date specified in the solicitation. The progress report template is to be used by the selected contractor to report the percentage of work completed on a quarterly basis over the course of the contract period.

View the file

Other versions and copies of AF Form 3065

File Revision Posted Attached to
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
Attachment C - AF Form 3065.pdf Revision not stated Airfield Blast Shield
AF Form 3065.xlsx Revision not stated Demo B5276 & B8129 Amendment 0001
Attachment G - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Robins AFB Paving Multi-Award IDIQ
SOW App 003 AF IMT 3065 Progress Report.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
FNWZ 17-0021A - Att E - AF Form 3065.xlsx Revision not stated Demo B6142
FNWZ 21-0071 - Att E - AF Form 3065.xlsx Revision not stated Demo B6119
Attachment 5 - AF FORM 3065 Contract Progress Report.pdf Revision not stated Security System Upgrades
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf Revision not stated Nellis AFB Paving IDIQ
Attachment 4_AF IMT 3065_199600401_VI_Progress Report.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 10 - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Dismantling of Modular Facility & Storage Racks
Attachment 2.8 - AF Form 3065 Progress Report Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Exhibit 7 - AF Form 3065 Contract Progress Report.pdf Revision not stated Multiple Award Task Order Contract (MATOC) Mechanical HVAC/Mechanical Maintenance, Repair and Minor Construction Work Amendment 2
BLANK SAMPLE AF Form 3065.xlsx Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
Atch BLANK SAMPLE AF Form 3065.xlsx Revision not stated Design/Build ANG ACS Weapons Facility
16. AF Form 3065 Contract Progress Report (1 page) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Atch 08 - AF Form 3065 Progress Report.xlsx Same revision and size as this file Revision not stated B9992-Doc Stewart Playgrounds [PRE-SOLICITATION]
Attachment 11 - AF Form 3065.pdf Revision not stated Construct/Repair LOX Canopies
Attachment 11 - AF Form 3065.pdf Revision not stated Communication Lines Installation, Tyndall AFB, FL
Show all 20

Who attaches AF Form 3065

Other files

File Type Posted
B9992-Playgrounds AMENDED.zip ZIP file
Solicitation Amendment FA485522B00050001 SF 30.pdf PDF
Atch 07 - AF3064 Schedule example.xlsx XLSX spreadsheet
Atch 09 - Aug 21 Comm Call out Template.pdf PDF
Public Playground Safety Handbook.pdf PDF
Atch 2- QASP- Surveillance Checklist.pdf PDF
Atch 13a - HAZMAT Worksheet instructions.pdf PDF
2. CAFB Design Deliverables.docx DOCX document
Atch 11- SOMs.xlsx XLSX spreadsheet
Atch 02 - CAFB Architectural Compatibility Guide-2012.pdf PDF
1. Specifications (General Requirements).pdf PDF
Atch 01 - Contractor Security Hnbk 2021.pdf PDF
SOLICITATION.zip ZIP file
Atch 5- QASP- Customer Complaint Record (CCR).pdf PDF
Atch 06 - CAFB CAD Standards.pdf PDF
B9992 Playgrounds SOO.pdf PDF
Atch 3- QASP- Corrective Action Report (CAR).pdf PDF
Atch 13 - HAZMAT Worksheet.pdf PDF
Atch 6- QASP- Combating Trafficking in Persons Checklist (CTIP).pdf PDF
Atch 1- QASP- Surveillance Schedule.xlsx XLSX spreadsheet
Atch 7- QASP- Performance Assessment Report (PAR).pdf PDF
Atch 12 - AF Fm 3052 Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
Atch 14 - HAZMAT Usage Worksheet.pdf PDF
Site Plan (CZQZ22-0024).pdf PDF
Atch 04 - AF103v16 Feb 2020 with attacher.pdf PDF
Atch 03 - Temp Laydown Area.doc.pdf PDF
Playground Assessment 2.pptx PPTX presentation
Site Photos.pdf PDF
Atch 4- QASP- Record of Contractors Preformance (CPR).pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CONTRACT PROGRESS REPORT
Public reporting burden for this collection of information is estimated to average per reseponse, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 9000-0062, Washington, DC, 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
1TO:
LINE NO.WORK ELEMENT% of TOTAL JOBPREVIOUS CUMULATIVE %% COMPLETED THIS PERIOD% COMPLETED CUMULATIVE
1Bond0000
20000
30000
40000
50000
60000
70000
80000
90000
100000
110000
120000
130000
140000
150000
160000
170000
180000
190000
200000
21000
22000
23000
Total0.00%0.00%0.00%0.00%
REMARKS
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR
CONTRACTORBASE CIVIL ENGINEERING
TYPE OR PRINT NAME AND TITLESIGNATUREDATE
19-Feb-16
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

Sheet2

Sheet3

File details come from the government source that posted it. Updated .