AF Form 3065.xlsx

Air Force Form XLSX spreadsheet 16 KB Posted

Attached to
Demo B5276 & B8129 Amendment 0001
Solicitation number
FA466126Q0065
Issued by

About this file

This file is an AF Form 3065 Contract Progress Report for Air Force construction demolition project FA4661, submitted by One Great Mystery Construction, Inc. The report covers the demolition of Buildings 5276 and 8129 (contract project numbers FNWZ 15-0059 and 25-0129) during the period from x/xx/2021 to x/xx/2022, with a contract completion date of x/xx/2022. The form outlines 18 defined work elements including bonds, mobilization, construction submittals, demolition, site/utility work, foundation work, frame/roof work, building envelope/insulation, plumbing, HVAC materials and labor, electrical materials and labor, fire protection, finishes/paint, testing, contractor punchlist, and operations and maintenance with as-builts and closeout (the latter designated as a fixed amount). Each line item is valued at 1.00% of the total job cost, except the O&M, as-builts, and closeout line item which represents 1.50%, resulting in a cumulative total of 37.50% across all line items.

The progress report indicates 0.00% completion during the reporting period and 0.00% cumulative completion as of the report date, suggesting this is an initial submission or template. The form requires certification by both the contractor and the Base Civil Engineer, as well as review and approval by the Contracting Officer. The Government notes that this form may be used for computing progress payments in accordance with the contract's payment clause. The related solicitation (FA466126Q0065) for this demolition work was issued with a deadline for questions of July 21, 2026, and an offer submission deadline of July 29, 2026 at 2:00 P.M. CDT, with an optional site visit scheduled for July 15, 2026.

View the file

Other versions and copies of AF Form 3065

File Revision Posted Attached to
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
Attachment C - AF Form 3065.pdf Revision not stated Airfield Blast Shield
Attachment G - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Robins AFB Paving Multi-Award IDIQ
SOW App 003 AF IMT 3065 Progress Report.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
FNWZ 17-0021A - Att E - AF Form 3065.xlsx Revision not stated Demo B6142
FNWZ 21-0071 - Att E - AF Form 3065.xlsx Revision not stated Demo B6119
Attachment 5 - AF FORM 3065 Contract Progress Report.pdf Revision not stated Security System Upgrades
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf Revision not stated Nellis AFB Paving IDIQ
Attachment 4_AF IMT 3065_199600401_VI_Progress Report.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 10 - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Dismantling of Modular Facility & Storage Racks
Attachment 2.8 - AF Form 3065 Progress Report Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Exhibit 7 - AF Form 3065 Contract Progress Report.pdf Revision not stated Multiple Award Task Order Contract (MATOC) Mechanical HVAC/Mechanical Maintenance, Repair and Minor Construction Work Amendment 2
BLANK SAMPLE AF Form 3065.xlsx Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
Atch 08 - AF Form 3065 Progress Report.xlsx Revision not stated B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID]
Atch BLANK SAMPLE AF Form 3065.xlsx Revision not stated Design/Build ANG ACS Weapons Facility
16. AF Form 3065 Contract Progress Report (1 page) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Atch 08 - AF Form 3065 Progress Report.xlsx Revision not stated B9992-Doc Stewart Playgrounds [PRE-SOLICITATION]
Attachment 11 - AF Form 3065.pdf Revision not stated Construct/Repair LOX Canopies
Attachment 11 - AF Form 3065.pdf Revision not stated Communication Lines Installation, Tyndall AFB, FL
Show all 20

Who attaches AF Form 3065

Other files

File Type Posted
Solicitation Amendment FA466126Q00650001 SF 30.pdf PDF
Wage Determination.pdf PDF
Pricing Schedule.pdf PDF
Pricing Worksheet.xlsx XLSX spreadsheet
Statement of Work.pdf PDF
AF Form 3064.xlsx XLSX spreadsheet
Solicitation - FA466126Q0065.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CONTRACT PROGRESS REPORTOMB No. 0704-0188
CONTRACTORPROJECT #:FNWZ 15-0059 & 25-0129
One Great Mystery Construction, Inc.PROJECT NAME:Demo Bldgs 5276 & 8129
REPORT #:PERIOD COVEREDCONTRACT NO.CONTRACT COMPLETION DATE
1FROM: x/xx/2021 TO: x/xx/2022FA4661-x/xx/2022
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds1.00%
2Mobilization1.00%
3Construction Submittals1.00%
4Demolition1.00%
5Site/Utility Work1.00%
6Foundation/Slab on grade1.00%
7Frame/Roof Work1.00%
8Building envelope/Insulation1.00%
9Plumbling1.00%
10HVAC materials1.00%
11HVAC labor1.00%
12Electrical Materials1.00%
13Electrical labor1.00%
14Fire Protection1.00%
15Finishes/Paint1.00%
16Testing1.00%
17Contractor Punchlist1.00%
18O&M, As-Builts, & Closeout (FIXED AMOUNT)1.50%
191.00%
201.00%
211.00%
221.00%
231.00%
241.00%
251.00%
261.00%
271.00%
281.00%
291.00%
301.00%
311.00%
321.00%
331.00%
341.00%
351.00%
361.00%
371.00%
TOTAL37.50%0.00%0.00%
REMARKS:
Scheduled % Complete: _____%
Actual % Complete: _____%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information
provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR
ContractorBase Civil Engineer
TYPED NAME AND TITLESIGNATUREDATE
XX
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPED NAME AND TITLESIGNATUREDATE

In House Reproduction of AF FORM 3065 PREVIOUS EDITION IS OBSOLETE U.S. G.P.O. 1984-4207979/13318

&"Times New Roman,Regular"&12

X

File details come from the government source that posted it. Updated .