FNWZ 21-0071 - Att E - AF Form 3065.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Demo B6119 Federal contract opportunity
- Solicitation number
- FA466126Q0005
About this file
This file is an Air Force Form 3065 Contract Progress Report for the demolition project FNWZ 21-0071, involving One Great Mystery Construction, Inc. as the contractor. The project involves complete demolition of Building 6119, a 2,892 square foot facility located at an Air Force site, with the contract covering comprehensive demolition services including removal of concrete slabs, foundations, sidewalks, utilities, structural elements, mechanical systems, and associated site infrastructure.
The progress report details 37 line items of work, each currently showing 1% completion, with a total cumulative progress of 37.50%. The contract is associated with Solicitation Number FA466126Q0005 under the Department of the Air Force Global Strike Command. The demolition scope includes removing all building components such as framing, mechanical systems, electrical infrastructure, plumbing, roofing, and site features, with work to be performed to a depth of three feet below existing grade elevation. The contract period covers from x/xx/2021 to x/xx/2022, with a completion date of x/xx/2022.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B6119 Demo RFQ COMBO Amendment 0003.pdf | ||
| FNWZ 21-0071 Demo B6119 QA Sheet - Final (12-11-2025).pdf | ||
| B6119 Demo RFQ COMBO Amendment 0002.pdf | ||
| B6119 Demo RFQ COMBO Amendment 0001.pdf | ||
| Demo B6119 QA Sheet (12-10-2025).pdf | ||
| FNWZ21-0071 Demolish Thrift Shop_B6119_SOW.pdf | ||
| FNWZ 21-0071 - Attachment E - Pricing Worksheet - Contractor.xlsx | XLSX spreadsheet | |
| FNWZ 21-0071 - Att E - AF Form 3064.xlsx | XLSX spreadsheet | |
| Wage Determination.pdf | ||
| B6119 Demo RFQ COMBO.pdf | ||
| FNWZ 21-0071 Demo 6119 DWGs.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONTRACT PROGRESS REPORT | OMB No. 0704-0188 | |||||
| CONTRACTOR | PROJECT #: | FNWZ 21-0071 | ||||
| One Great Mystery Construction, Inc. | PROJECT NAME: | Demo Bldg 6119 | ||||
| REPORT #: | PERIOD COVERED | CONTRACT NO. | CONTRACT COMPLETION DATE | |||
| 1 | FROM: x/xx/2021 TO: x/xx/2022 | FA4661- | x/xx/2022 | |||
| LINE | WORK ELEMENT | % OF | % COMPLETED | % COMPLETED | ||
| NO. | TOTAL JOB | THIS PERIOD | CUMULATIVE | |||
| 1 | Bonds | 1.00% | ||||
| 2 | Mobilization | 1.00% | ||||
| 3 | Construction Submittals | 1.00% | ||||
| 4 | Demolition | 1.00% | ||||
| 5 | Site/Utility Work | 1.00% | ||||
| 6 | Foundation/Slab on grade | 1.00% | ||||
| 7 | Frame/Roof Work | 1.00% | ||||
| 8 | Building envelope/Insulation | 1.00% | ||||
| 9 | Plumbling | 1.00% | ||||
| 10 | HVAC materials | 1.00% | ||||
| 11 | HVAC labor | 1.00% | ||||
| 12 | Electrical Materials | 1.00% | ||||
| 13 | Electrical labor | 1.00% | ||||
| 14 | Fire Protection | 1.00% | ||||
| 15 | Finishes/Paint | 1.00% | ||||
| 16 | Testing | 1.00% | ||||
| 17 | Contractor Punchlist | 1.00% | ||||
| 18 | O&M, As-Builts, & Closeout (FIXED AMOUNT) | 1.50% | ||||
| 19 | 1.00% | |||||
| 20 | 1.00% | |||||
| 21 | 1.00% | |||||
| 22 | 1.00% | |||||
| 23 | 1.00% | |||||
| 24 | 1.00% | |||||
| 25 | 1.00% | |||||
| 26 | 1.00% | |||||
| 27 | 1.00% | |||||
| 28 | 1.00% | |||||
| 29 | 1.00% | |||||
| 30 | 1.00% | |||||
| 31 | 1.00% | |||||
| 32 | 1.00% | |||||
| 33 | 1.00% | |||||
| 34 | 1.00% | |||||
| 35 | 1.00% | |||||
| 36 | 1.00% | |||||
| 37 | 1.00% | |||||
| TOTAL | 37.50% | 0.00% | 0.00% | |||
| REMARKS: |
| Scheduled % Complete: _____% | ||||
| Actual % Complete: _____% | ||||
| At the Contracting Officer’s discretion and according to the payments clause of the contract, the information | ||||
| provided on this form may be used for computing progress payments. | ||||
| PROGRESS OR COMPLETION CERTIFICATE | ||||
| I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications. | ||||
| SUBMITTED BY OR FOR | ||||
| Contractor | Base Civil Engineer | |||
| TYPED NAME AND TITLE | SIGNATURE | DATE | ||
| X | X | |||
| REVIEWED BY OR FOR CONTRACTING OFFICER | ||||
| TYPED NAME AND TITLE | SIGNATURE | DATE |
In House Reproduction of AF FORM 3065 PREVIOUS EDITION IS OBSOLETE U.S. G.P.O. 1984-4207979/13318