MS 076 Backflow Preventer.pdf

PDF 716 KB Posted

Attached to
Repair Maintenance Shop BLDG 8040
Solicitation number
FA4661-21-R-0001
Issued by

View the file

Other files

File Type Posted
AF Form 3065 Dyess Progress Report 42 Gov.pdf PDF
12-0053 Addendum Four - New Contractor (11-19-20) v2.doc DOC document
12-0053 Addendum Three - New Contractor (11-9-20).pdf PDF
Solicitation Amendment FA466121R00010001 SF 30.pdf PDF
12-0053 Attachment C - Contractor Pricing Breakdown 11.29.16.xlsx XLSX spreadsheet
MS 004 Staging Plan.pdf PDF
MS 039 HM Doors Frames and Hardware.pdf PDF
MS 026 Cove Base Submittal.pdf PDF
MS 032 Concrete Vapor Barrier.pdf PDF
MS 042A Overhead Coiling Doors.pdf PDF
MS 030 Steel Shop Drawings.pdf PDF
MS 024 MBCI Panel Roof and Color Chart.pdf PDF
MS 037 MBCI and Welding Certifications.pdf PDF
AF Form 3065 Dyess Progress Report 42 Gov.pdf PDF
MS 044 Casework.pdf PDF
MS 079 Radius Bullnose for Doorways.pdf PDF
MS 007 Mech and Plumb Consumables.pdf PDF
MS 027-028 Metal Slat Fencing - Color.pdf PDF
MS 011 Fire Alarm and Mass Notification MS 005a.pdf PDF
MS 025 VCT.pdf PDF
MS 070 Water Meter Specifications.pdf PDF
MS 073 Breakroom Sink Type and Color.pdf PDF
MS 031A Toilet Partions and Accessories.pdf PDF
MS 016 HVAC Controls.pdf PDF
MS 055 South Structural Steel.pdf PDF
MS 006 Mech and Plumb.pdf PDF
MS 008 Abatement Plan.pdf PDF
MS 069 Sidewall Sprinkler Head.pdf PDF
MS 064 Dryvit Backstop Air Barrier.pdf PDF
MS 021 HVAC.pdf PDF
MS 050 Welder Certification.pdf PDF
MS 083 Aerospace Air Shower Substitution.pdf PDF
MS 030 Steel Shop Drawings Page 2.pdf PDF
MS 029 Anchor Rod Shop Drawings and Details.pdf PDF
MS 001 QC Plan.pdf PDF
MS 065 Concrete Test Reports.pdf PDF
MS 020A Electrical Transformer.pdf PDF
MS 041 Toilet Accessories and Fire Ext.pdf PDF
MS 022 Louvers and Color Chart.pdf PDF
MS 035 Geotech Compaction Testing.pdf PDF
MS 078 078A Overhead Doors Warranty.pdf PDF
MS 023 Metal Panels.pdf PDF
MS 047 28 Day Concrete Test Results.pdf PDF
MS 061 Masonry Sealant Substitution.pdf PDF
MS 066 Roof Flashing.pdf PDF
REF 12 0053 PR 42 Thru 09 30 2019.xlsx XLSX spreadsheet
MS 010 Insulation.pdf PDF
MS 067 Steel Building Certifications.pdf PDF
MS 052 CMU Specs and Certs.pdf PDF
MS 036 MBCI Panels.pdf PDF
Show 40 more

Latest 50 of 163 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

For Non-Health Hazard Applications

ES-LF007

Now Available WattsBox Insulated Enclosures.

For more information, send for literature ES-WB.

Series LF007 Double Check Valve Assemblies Sizes: 1⁄2" – 3" (15 – 80mm) Series LF007 Double Check Valve Assemblies shall be installed at referenced cross-connections to prevent the backflow of polluted water into the potable water supply. Only those cross-connections identified by local inspection authorities as non-health hazard shall be allowed the use of an approved double check valve assembly.

The LF007 features Lead Free* construction to comply with Lead Free* installation requirements.

Check with local authority having jurisdiction regarding vertical orientation, frequency of testing or other installation requirements.

The valve shall meet the requirements of ASSE Std. 1015 and AWWA Std. C510. Approved by the Foundation for Cross- Connection Control and Hydraulic Research at the University of Southern California.

Features

• Ease of maintenance — only one cover

• Top entry

• Replaceable seats and seat discs

• Modular construction

• Compact design

• Lead Free* cast copper silicon alloy body construction —

1⁄2" – 2" (15 – 50mm)

• Fused epoxy coated cast iron body — 21⁄2" – 3" (65 – 80mm)

• Top mounted Lead Free* ball valve test cocks

• Low pressure drop

• No special tools required for servicing

• 1⁄2" – 1" (15 – 25mm) have tee handles

Specifications A Double Check Valve Assembly shall be installed at each noted location. The assembly shall consist of two positive seating check modules with captured springs and rubber seat discs. The check module seats and seat discs shall be replaceable. Service of all internal components shall be through a single access cover secured with stainless steel bolts. The Double Check Valve Assemblies shall be constructed using Lead Free* cast copper silicon alloy. Lead Free* Double Check Valve Assemblies shall comply with state codes and standards, where applicable, requir-ing reduced lead content. The assembly shall also include two resilient seated isolation valves; four top mounted, resilient seated test cocks. The assembly shall meet the requirements of ASSE Std. 1015 and AWWA Std. C510. Approved by the Foundation for Cross-Connection Control and Hydraulic Research at the University of Southern California. Assembly shall be a Watts Series LF007.

Test Cocks

First Check Module Assembly

The LF007 Series features a modular design concept which facilitates complete maintenance and assembly by retaining the spring load.

Second Check Module Assembly

*The wetted surface of this product contacted by consumable water contains less than 0.25% of lead by weight.

Job Name ––––––––––––––––––––––––––––––––––––––––––– Contractor ––––––––––––––––––––––––––––––––––––––––––––

Job Location ––––––––––––––––––––––––––––––––––––––––– Approval –––––––––––––––––––––––––––––––––––––––––––––

Engineer ––––––––––––––––––––––––––––––––––––––––––––– Contractor’s P.O. No. ––––––––––––––––––––––––––––––––––

Approval ––––––––––––––––––––––––––––––––––––––––––––– Representative ––––––––––––––––––––––––––––––––––––––––

LEAD FREE*

NOTICE

Inquire with governing authorities for local installation requirements

3⁄4" (20mm) LF007M3QT

The information contained herein is not intended to replace the full product installation and safety information available or the experience of a trained product installer. You are required to thoroughly read all installation instructions and product safety information before beginning the installation of this product.

NOTICE

Watts product specifications in U.S. customary units and metric are approximate and are provided for reference only. For precise measurements, please contact Watts Technical Service. Watts reserves the right to change or modify product design, construction, specifications, or materials with-out prior notice and without incurring any obligation to make such changes and modifications on Watts products previously or subsequently sold.

As

A

C B

TRD

Bs

F

Subscript ‘S’ = strainer model

Pressure — Temperature 1⁄2" – 2" (15 – 50mm) Temperature Range: 33°F – 180°F (0.5°C – 82°C).

Maximum Working Pressure: 175psi (12.1 bar).

21⁄2" – 3" (65 – 80mm) Temperature Range: 33˚F – 110°F (0.5˚C – 43°C) continuous, 140°F (60°C) intermittent.

Maximum Working Pressure: 175psi (12.1 bar).

Standards ASSE Std. 1015, AWWA Std. C510

IAPMO PS31, CSA B64.5

Approvals

† ASSE, AWWA, IAPMO, CSA, UPC

s Approved by the Foundation for Cross-Connection Control and Hydraulic Research at the University of Southern California.

• Models with suffix LF and S are not listed.

u UL Classified (without shutoff valves only) 3⁄4" – 2"

(20 – 50mm) (except 007M3LF) u UL Classified with OSY gate valves

(21⁄2" and 3" horizontal only.)

▼1⁄2" - 2" models Lead Free* with strainer
Horizontal and vertical “flow up" approval on all sizes

Models Sizes:

1⁄2" – 2" (15 – 50mm) Suffix:

S – copper silicon alloy strainer LF – without shutoff valves W/Press** – press inlet x press outlet (1⁄2" - 2" only)

Prefix:

U – Union connections

21⁄2" – 3" (65 – 80mm) Suffix:

NRS – non-rising stem resilient seated gate valves OSY – UL/FM outside stem and yoke resilient seated gate valves LF – without shutoff valves QT-FDA – FDA epoxy coated quarter-turn ball valves

MODEL SIZE (DN) DIMENSIONS WEIGHT

A B C D F G R T

in. mm in. mm in. mm in. mm in. mm in. mm in. mm in. mm in. mm lbs. kgs.

†s▼ LF007QT 1⁄2 15 10 254 45⁄8 117 27⁄16 62 — — 5 127 33⁄8 85 25⁄16 59 21⁄16 52 4.5 2 †s▼ LF007M3QT 3⁄4 20 111⁄8 282 4 102 31⁄8 79 — — 63⁄16 157 37⁄16 87 21⁄8 54 15⁄16 33 5 2.3 †s▼ LF007M1QT 1 25 131⁄4 337 51⁄8 130 4 102 — — 71⁄2 191 33⁄8 85 111⁄16 43 111⁄16 43 12 5.4 †s▼ LF007M2QT 11⁄4 32 163⁄8 416 5 127 35⁄16 84 — — 91⁄2 241 5 127 3 76 2 50 15 6.8 †s▼ LF007M2QT 11⁄2 40 163⁄4 425 47⁄8 124 31⁄2 89 — — 93⁄4 248 513⁄16 148 31⁄8 79 211⁄16 68 15.9 7.2 †s▼ LF007M1QT 2 50 191⁄2 495 61⁄4 159 4 102 — — 133⁄8 340 61⁄8 156 37⁄16 87 211⁄16 68 25.7 11.7

•▼ LF007QT-S 1⁄2 15 13 330 6 152 27⁄16 62 3 76 5 127 33⁄8 85 25⁄16 59 21⁄16 52 5.5 2.5 •▼ LF007M3QT-S 3⁄4 20 141⁄2 368 61⁄8 156 31⁄8 79 3 76 63⁄16 157 37⁄16 87 21⁄8 54 15⁄16 33 6.7 3.1 •▼ LF007M1QT-S 1 25 1715⁄16 157 73⁄4 197 4 102 31⁄4 83 71⁄2 191 33⁄8 85 111⁄16 43 111⁄16 43 14 6.4 •▼ LF007M2QT-S 11⁄4 32 211⁄2 546 71⁄16 179 35⁄16 84 31⁄2 83 91⁄2 241 5 127 3 76 2 50 19 8.6 •▼ LF007M2QT-S 11⁄2 40 213⁄4 552 71⁄16 179 31⁄2 89 33⁄4 95 93⁄4 248 513⁄16 148 31⁄8 79 211⁄16 68 19.6 8.9 •▼ LF007M1QT-S 2 50 253⁄4 654 83⁄4 222 4 102 4 102 133⁄8 340 61⁄8 156 37⁄16 87 211⁄16 68 33.5 15.2

Dimensions – Weights

** Viega ProPress® connections are optional factory-installed fitting on each end of the approved/certified assembly.

MODEL SIZE(DN) DIMENSIONS

in. mm in. mm

LFU007QT 1⁄2 15 1213⁄16 326

LFU007M2QT 3⁄4 20 1313⁄16 350

LFU007M2QT 1 25 165⁄8 422

LFU007M2QT 11⁄4 32 203⁄4 527

LFU007M2QT 11⁄2 40 211⁄2 546

LFU007M1QT 2 50 241⁄2 622

Strainer Dimensions

SIZE WEIGHT

M N

in. mm in. mm in. mm lbs. kgs.

21⁄2 65 10 254 61⁄2 165 28 13 3 80 101⁄8 267 7 178 34 15

C (open) 9" (229mm)

45⁄16" (109mm)

N

E1 E R

Union Tailpiece Union Tailpiece Union Nut Union Nut

Dimensions – Weights Sizes: 21⁄2" – 3" (65 – 80mm)

1" LFU007M1QT

Sizes: 1⁄2" – 2" (15 – 50mm)

M

MODEL SIZE (DN) DIMENSIONS WEIGHT

A B E, E1 R

in. mm in. mm in. mm in. mm in. mm lbs. kgs.

LF007QT-FDA 21/2 65 331/8 841 63/8 162 91⁄16 230 83/4 222 155 70

s LF007-NRS 21/2 65 331/8 841 93/8 238 91⁄16 230 83/4 222 155 70 su LF007-OSY 21/2 65 331/8 841 163/8 416 91⁄16 230 83/4 222 158 72

LF007-QT-FDA 3 80 341/4 870 63/8 162 91⁄16 230 83/4 222 155 70

s LF007-NRS 3 80 341/4 870 101/4 260 91⁄16 230 83/4 222 185 84 su LF007-OSY 3 80 341/4 870 187⁄8 479 91⁄16 230 83/4 222 185 84

Capacity As compiled from documented Foundation for Cross-Connection Control and Hydraulic Research at the University of Southern California lab tests.

†† Typical maximum system flow rate (7.5 feet/sec., 2.3 meters/sec.)

** UL rated flow bars psi

1.5 22

1.2 18

.96 14

.69 10

.41 6

.14 2

0 5 10 15 20 25 30 35 40 45 50 gpm 0 19 38 57 76 95 114 133 152 171 190 lpm

7.5 15 lps

2.3 4.6 mps

Pr es su re

D ro p

Flow

3⁄4" (20mm)

11⁄2" (40mm)

.8 12 .7 10 .5 8 .4 6 .3 4 .1 2 0 0

0 10 20 30 40 50 60 70 80 90 100 110 120 gpm 0 38 76 114 152 190 228 66 304 342 380 418 456 lpm 5 7.5 10 15 fps

1.5 2.5 3.0 4.5 mps

0 25 50 75 100 125 150 175 200 gpm 0 95 190 285 380 475 570 665 760 lpm

1.5 2.3 3.0 4.6 mps

2" (50mm)

.8 12 .7 10 .5 8 .4 6 .3 4

.8 12 .7 10 .5 8 .4 6 .3 4

0 2 4 6 8 10 12 gpm 0 7.6 15.2 22.8 30.4 38 45.6 lpm 5 7.5 10 fps

1.5 2.5 3.0 mps

1⁄2" (15mm)

1.1 16 .8 12 .7 10 .5 8 .4 6 .3 4

0 5 10 15 20 25 30 35 40 45 50 55 60 gpm 0 19 38 57 76 95 114 133 152 171 190 209 228 lpm

1" (25mm)

0 25 50 75 100 125 150 175 200 225 250 gpm 0 95 190 285 380 475 570 665 760 855 950 lpm

21⁄2" (65mm)

.7 10 .5 8 .4 6 .3 4

1 14 .8 12 .7 10 .5 8 .4 6 .3 4

0 10 20 30 40 50 60 70 80 90 100 110 120 gpm 0 38 76 114 152 190 228 266 304 342 380 418 456 lpm

11⁄4" (32mm)

0 25 50 75 100 125 150 175 200 225 250 275 300 325 gpm 0 95 190 285 380 475 570 665 760 855 950 1045 1140 1235 lpm 5 7.5 10 fps

1.5 2.3 3.0 mps

3" (80mm)

.7 10 .5 8 .4 6 .3 4

ES-LF007 1808 © 2018 Watts

USA: T: (978) 689-6066 • F: (978) 975-8350 • Watts.com Canada: T: (905) 332-4090 • F: (905) 332-7068 • Watts.ca

Latin America: T: (52) 81-1001-8600 • Watts.com

Job Name:

Contractor:

Job Location:

Approval:

Engineer:

Contractors PO No:

Approval 1:

Representative:

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Form Approved OMB No 9000-0062

Expires May 31, 2005

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and

Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM

NO.

SPECIFICATION SECTION/

PARA NO./DRAWING NO.

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc.)

AP-

PROVED

DISAP-

PROVED

SEE

REVERSE

INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE (YYYYMMDD) TYPE OR PRINT NAME AND GRADE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

For Evaluation and Action RNLT ________________ OR SOONER

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

TO: (Contractor)

APPROVED

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ____ DAYS OF DATE SHOWN BELOW.

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

New Resubmittal

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

2019-08-30T11:04:00-0500

ROLAN.PATRICK.M.1515150249

2019-08-30T11:06:04-0500

GARRIGAS.CHRISTA.L.1287173314

TO Contracting Officer: SrA Lydia SimpkinsWater

FROM Contractor: FARR Builders LLC S. Gevers, San Antonio, TX 78210

DATE: 28 August 2019

CONTRACT NUMBER: FA4661-15-D-0001

SUBMISSION NUMBER: 76

PREVIOUS SUBMISSION NUMBER: 75

PROJECT NUMBER: FNWZ 12-0053

ITEM NORow1: 1

SPECIFICATION SECTION PARA NODRAWING NORow1: Per Sow

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1: Backflow Preventer Details And Specs

INITIALRow1: PR

ITEM NORow2:

SPECIFICATION SECTION PARA NODRAWING NORow2:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2:

INITIALRow2:

ITEM NORow3:

SPECIFICATION SECTION PARA NODRAWING NORow3:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3:

INITIALRow3:

ITEM NORow4:

SPECIFICATION SECTION PARA NODRAWING NORow4:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4:

INITIALRow4:

ITEM NORow5:

SPECIFICATION SECTION PARA NODRAWING NORow5:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5:

INITIALRow5:

ITEM NORow6:

SPECIFICATION SECTION PARA NODRAWING NORow6:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6:

INITIALRow6:

ITEM NORow7:

SPECIFICATION SECTION PARA NODRAWING NORow7:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7:

INITIALRow7:

ITEM NORow8:

SPECIFICATION SECTION PARA NODRAWING NORow8:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8:

INITIALRow8:

ITEM NORow9:

SPECIFICATION SECTION PARA NODRAWING NORow9:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9:

INITIALRow9:

ITEM NORow10:

SPECIFICATION SECTION PARA NODRAWING NORow10:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10:

INITIALRow10:

ITEM NORow11:

SPECIFICATION SECTION PARA NODRAWING NORow11:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11:

INITIALRow11:

DATE YYYYMMDD: 2019/08/28

TYPE OR PRINT NAME AND GRADE: Wayne Owens, PS

TO Base Civil Engineering Officer: 502 CE

RNLT:

DATE YYYYMMDD_2:

TYPE OR PRINT NAME AND GRADE_2:

TO AF Contracting Office:

DATE YYYYMMDD_3: 20190830

TYPE OR PRINT NAME AND GRADE_3: Patrick Rolan, GS-12

TO Contractor:

DATE YYYYMMDD_4: 20190830

TYPE OR PRINT NAME AND GRADE_4: Christa Garrigas, CO

Text5:

Check Box6: Yes

Check Box7: Off

Check Box8: Off

Check Box9: Off

Check Box10: Off

Check Box11: Off

Check Box12: Off

Check Box13: Off

Check Box14: Off

Check Box15: Off

Check Box16: Off

Check Box17: Off

Check Box18: Off

Check Box19: Off

Check Box20: Off

Check Box21: Off

Check Box22: Off

Check Box23: Off

Check Box24: Off

Check Box25: Off

Check Box26: Off

Check Box27: Off

Check Box28: Off

Check Box29: Off

Check Box30: Off

Check Box31: Off

Check Box32: Off

Check Box33: Off

Check Box34: Off

Check Box35: Off

Check Box36: Off

Check Box37: Off

Check Box38: Off

Check Box3: Yes

Check Box50: Off

Check Box4: Yes

Check Box5: Off

Check Box39: Yes

Check Box40: Off

COMMENTS Number to correspond with applicable Item Number on reverseRow1:

File details come from the government source that posted it. Updated .