B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID]

Closed Solicitation Posted

Solicitation number
FA485522B0005
Agency
Air Force Special Operations Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y1PZ Construction Of Other Non-Building Facilities
Place of performance
Cannon AFB, New Mexico 88103, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks bids to remove and install two playground structures at Cannon Air Force Base in New Mexico. The Department of the Air Force Special Operations Command is procuring these playground installation services. The selected contractor must furnish all necessary labor, equipment, materials and supervision to complete the work in accordance with conceptual drawings, a statement of objectives, and applicable codes and regulations. Proposals will be evaluated without discussions to select the winning bidder based on price. Bids are due no later than September 27th.

This opportunity is set aside for total small business concerns. The primary NAICS code is 238990 and PSC code S206. The place of performance is Cannon Air Force Base in New Mexico. The contractor will have 30 days for design and 60 days for construction, for a total period of performance of 90 calendar days. The scope of work includes removing one existing toddler playground and one youth playground, and installing replacement structures to comply with accessibility standards at the Doc Stewart Playground location on the base.

Notice text

3 versions

Update #3 · Latest ·

AMENDMENT 0001: 

The purpose of this amendement is to add a bid submission option for Offerors, updating section L of the Invitiation for Bid. Please reference attachement B9992-Playgrounds AMENDED zip folder for these instructions. 

General Scope: The scope of this project includes but is not limited to removal and installation of one (1) toddler and one (1) youth playground structures for the 27 Special Operations Civil Engineer Squadron (SOCES), Cannon Air Force Base (CAFB), NM. Work shall conform to contract documents, specifications and adhere to the most current federal, state, and local requirements.

Work includes but not limited to: Operation of heavy machinery, fencing/cordoning workspace, hazard/safety awareness and mitigation, demolition, dumping, concrete work, playground installation, grading, rubber mulching, adherence to current policies and procedures.

The work to be performed under this contract and in accordance with the Statement of Objectives shall consist of furnishing all necessary parts, labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals necessary for providing all work shown on the conceptual drawings (Technical Exhibits), statement of objectives, and all applicable codes, regulations, standards, and criteria in effect.

Update #2 ·

AMENDMENT 0001: 

The purpose of this amendement is to add a bid submission option for Offerors, updating section L of the Invitiation for Bid. Please reference attachement Solicitation Amendment FA485522B00050001 SF for these instructions. 

General Scope: The scope of this project includes but is not limited to removal and installation of one (1) toddler and one (1) youth playground structures for the 27 Special Operations Civil Engineer Squadron (SOCES), Cannon Air Force Base (CAFB), NM. Work shall conform to contract documents, specifications and adhere to the most current federal, state, and local requirements.

Work includes but not limited to: Operation of heavy machinery, fencing/cordoning workspace, hazard/safety awareness and mitigation, demolition, dumping, concrete work, playground installation, grading, rubber mulching, adherence to current policies and procedures.

The work to be performed under this contract and in accordance with the Statement of Objectives shall consist of furnishing all necessary parts, labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals necessary for providing all work shown on the conceptual drawings (Technical Exhibits), statement of objectives, and all applicable codes, regulations, standards, and criteria in effect.

Update #1 ·

General Scope: The scope of this project includes but is not limited to removal and installation of one (1) toddler and one (1) youth playground structures for the 27 Special Operations Civil Engineer Squadron (SOCES), Cannon Air Force Base (CAFB), NM. Work shall conform to contract documents, specifications and adhere to the most current federal, state, and local requirements.

Work includes but not limited to: Operation of heavy machinery, fencing/cordoning workspace, hazard/safety awareness and mitigation, demolition, dumping, concrete work, playground installation, grading, rubber mulching, adherence to current policies and procedures.

The work to be performed under this contract and in accordance with the Statement of Objectives shall consist of furnishing all necessary parts, labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals necessary for providing all work shown on the conceptual drawings (Technical Exhibits), statement of objectives, and all applicable codes, regulations, standards, and criteria in effect.

Attachments

Files attached to this notice, newest first
File Type Posted
B9992-Playgrounds AMENDED.zip ZIP file
Solicitation Amendment FA485522B00050001 SF 30.pdf PDF
Public Playground Safety Handbook.pdf PDF
Atch 2- QASP- Surveillance Checklist.pdf PDF
Atch 13 - HAZMAT Worksheet.pdf PDF
Atch 11- SOMs.xlsx XLSX spreadsheet
Atch 02 - CAFB Architectural Compatibility Guide-2012.pdf PDF
B9992 Playgrounds SOO.pdf PDF
2. CAFB Design Deliverables.docx DOCX document
Atch 3- QASP- Corrective Action Report (CAR).pdf PDF
Atch 13a - HAZMAT Worksheet instructions.pdf PDF
Atch 07 - AF3064 Schedule example.xlsx XLSX spreadsheet
SOLICITATION.zip ZIP file
Atch 5- QASP- Customer Complaint Record (CCR).pdf PDF
1. Specifications (General Requirements).pdf PDF
Atch 08 - AF Form 3065 Progress Report.xlsx XLSX spreadsheet
Atch 06 - CAFB CAD Standards.pdf PDF
Atch 01 - Contractor Security Hnbk 2021.pdf PDF
Atch 1- QASP- Surveillance Schedule.xlsx XLSX spreadsheet
Atch 6- QASP- Combating Trafficking in Persons Checklist (CTIP).pdf PDF
Atch 4- QASP- Record of Contractors Preformance (CPR).pdf PDF
Atch 7- QASP- Performance Assessment Report (PAR).pdf PDF
Atch 14 - HAZMAT Usage Worksheet.pdf PDF
Atch 12 - AF Fm 3052 Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
Atch 04 - AF103v16 Feb 2020 with attacher.pdf PDF
Atch 03 - Temp Laydown Area.doc.pdf PDF
Playground Assessment 2.pptx PPTX presentation
Site Plan (CZQZ22-0024).pdf PDF
Site Photos.pdf PDF
Atch 09 - Aug 21 Comm Call out Template.pdf PDF
Show all 30

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity