MS 069 Sidewall Sprinkler Head.pdf

PDF 2 MB Posted

Attached to
Repair Maintenance Shop BLDG 8040
Solicitation number
FA4661-21-R-0001
Issued by

View the file

Other files

File Type Posted
AF Form 3065 Dyess Progress Report 42 Gov.pdf PDF
12-0053 Addendum Four - New Contractor (11-19-20) v2.doc DOC document
12-0053 Addendum Three - New Contractor (11-9-20).pdf PDF
Solicitation Amendment FA466121R00010001 SF 30.pdf PDF
12-0053 Attachment C - Contractor Pricing Breakdown 11.29.16.xlsx XLSX spreadsheet
MS 004 Staging Plan.pdf PDF
MS 039 HM Doors Frames and Hardware.pdf PDF
MS 026 Cove Base Submittal.pdf PDF
MS 032 Concrete Vapor Barrier.pdf PDF
MS 042A Overhead Coiling Doors.pdf PDF
MS 030 Steel Shop Drawings.pdf PDF
MS 024 MBCI Panel Roof and Color Chart.pdf PDF
MS 037 MBCI and Welding Certifications.pdf PDF
AF Form 3065 Dyess Progress Report 42 Gov.pdf PDF
MS 044 Casework.pdf PDF
MS 079 Radius Bullnose for Doorways.pdf PDF
MS 007 Mech and Plumb Consumables.pdf PDF
MS 027-028 Metal Slat Fencing - Color.pdf PDF
MS 011 Fire Alarm and Mass Notification MS 005a.pdf PDF
MS 025 VCT.pdf PDF
MS 070 Water Meter Specifications.pdf PDF
MS 073 Breakroom Sink Type and Color.pdf PDF
MS 031A Toilet Partions and Accessories.pdf PDF
MS 016 HVAC Controls.pdf PDF
MS 055 South Structural Steel.pdf PDF
MS 006 Mech and Plumb.pdf PDF
MS 008 Abatement Plan.pdf PDF
MS 076 Backflow Preventer.pdf PDF
MS 064 Dryvit Backstop Air Barrier.pdf PDF
MS 021 HVAC.pdf PDF
MS 050 Welder Certification.pdf PDF
MS 083 Aerospace Air Shower Substitution.pdf PDF
MS 030 Steel Shop Drawings Page 2.pdf PDF
MS 029 Anchor Rod Shop Drawings and Details.pdf PDF
MS 001 QC Plan.pdf PDF
MS 065 Concrete Test Reports.pdf PDF
MS 020A Electrical Transformer.pdf PDF
MS 041 Toilet Accessories and Fire Ext.pdf PDF
MS 022 Louvers and Color Chart.pdf PDF
MS 035 Geotech Compaction Testing.pdf PDF
MS 078 078A Overhead Doors Warranty.pdf PDF
MS 023 Metal Panels.pdf PDF
MS 047 28 Day Concrete Test Results.pdf PDF
MS 061 Masonry Sealant Substitution.pdf PDF
MS 066 Roof Flashing.pdf PDF
REF 12 0053 PR 42 Thru 09 30 2019.xlsx XLSX spreadsheet
MS 010 Insulation.pdf PDF
MS 067 Steel Building Certifications.pdf PDF
MS 052 CMU Specs and Certs.pdf PDF
MS 036 MBCI Panels.pdf PDF
Show 40 more

Latest 50 of 163 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Model SW-20 and SW-24 — 11.2 K-factor Extended Coverage Ordinary Hazard Horizontal Sidewall Sprinklers (Standard Response)

Page 1 of 6 AUGUST 2018 TFP230

IMPORTANT

Refer to Technical Data Sheet TFP2300 for warnings pertaining to regulatory and health information.

Always refer to Technical Data Sheet TFP700 for the “INSTALLER WARNING” that provides cautions with respect to handling and instal-lation of sprinkler systems and com-ponents. Improper handling and installation can permanently damage a sprinkler system or its compo-nents and cause the sprinkler to fail to operate in a fire situation or cause it to operate prematurely.

Worldwide Contacts www.tyco-fire.com

General Description The TYCO Model SW-20 and SW-24,

11.2 K-factor, Extended Coverage Ordi-

nary Hazard (ECOH) Horizontal Side-wall Sprinklers, Standard Response are decorative glass bulb sprinklers designed for use in ordinary hazard occupancies per NFPA 13.

The SW-20 provides protection of cov-erage areas up to 16 ft x 20 ft (320 ft2), whereas the SW-24 provides protec-tion of coverage areas up to 16 ft x 24 ft (384 ft2), as compared to standard coverage horizontal sidewall sprinklers having a maximum coverage area of 10 ft x 10 ft (100 ft2) for ordi nary hazard occupancies.

Horizontal sidewall sprinklers are designed for installation along a wall or the side of a beam and are com-monly used instead of pendent or upright sprinklers due to aesthetics or building construction considerations, where piping across the ceiling is not desirable.

Corrosion resistant coatings, where applicable, are utilized to extend the life of copper alloy sprinklers beyond that which would otherwise be obtained when exposed to corrosive atmo-spheres. Although corrosion resistant coated sprinklers have passed the standard corrosion tests of the appli-cable approval agencies, the testing is not representative of all possible cor-rosive atmospheres. Consequently, it is recommended that the end user be consulted with respect to the suit-ability of these corrosion resistant coatings for any given corrosive envi-ronment. The effects of ambient tem-perature, concentration of chemicals, and gas/chemical velocity, should be con sidered, as a minimum, along with the corrosive nature of the chemical to which the sprinklers will be exposed.

NOTICE

The Model SW-20 and SW-24 Sprin-klers described herein must be installed and maintained in compliance with this document and with the applicable stan-dards of the National Fire Protection Association, in addition to the stan-dards of any authorities having juris-diction. Failure to do so may impair the performance of these devices.

The owner is responsible for maintain-ing their fire protection system and devices in proper operating condition.

The installing contractor or sprinkler manufacturer should be contacted with any questions.

Sprinkler Identification Number (SIN)

TY5332 - SW-20

TY5337 - SW-24

TY5332 is a re-designation for C5332 TY5337 is a re-designation for C5337

Technical Data Approvals UL and C-UL Listed (Refer to the Design Criteria Section) Polyester coated sprinklers are UL and C-UL Listed as Corrosion Resistant Sprinklers

NYC under MEA 177-03-E

Maximum Working Pressure 175 psi (12,1 bar) Discharge Coefficient K= 11.2 GPM/psi½ (161,3 LPM/bar½)

Temperature Rating

SW-20: 155°F (68°C) & 200°F (93°C)

SW-24: 200°F (93°C)

Finishes Refer to Table B Physical Characteristics:

Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . Bronze Button. . . . . . . . . . . . . . . . . . . . . . . . . . . . Bronze Sealing Assembly . . . . . . . . . . . . . . . . Beryllium

Nickel w/ TEFLON Bulb . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Glass Compression Screw . . . . . . . . . . . . . . . . . Brass Deflector. . . . . . . . . . . . . . . . . . . . . . . . . . Bronze

SW-24

SW-20

TFP230

Operation The glass bulb contains a fluid that expands when exposed to heat. When the rated temperature is reached, the fluid expands sufficiently to shatter the glass bulb, allowing the sprinkler to activate and water to flow.

1/2" (12,7 mm)

NOMINAL

MAKE-IN

WRENCH

FLAT

2-3/8" (60,3 mm)

2" (50,8 mm)

3/4"

NPT

(19,1 mm)

CENTERLINE

OF SPRINKLER

WATERWAY

Temperature rating is indicated on Deflector.

Pipe thread connections per ISO 7-1 can be provided on special request.

4 3 2 1

T O

P

- Button

Deflector

Compression Screw Bulb

Components:

Frame-

Sealing Assembly-5

1/2" (12,7 mm)

1/2" (12,7 mm)

NOMINAL

MAKE-IN

FLAT

2-3/8" (60,3 mm)

2" (50,8 mm)

NPT

(19,1 mm)

9/16" (14,3 mm)

CENTERLINE

WATERWAY

1 5 2

T O

P

4 3

Sealing Assembly

Frame

Components:

Bulb Compression Screw

Deflector

Button

5 - 6 -

Temperature rating is indicated on Deflector.

Pipe thread connections per ISO 7-1 can be provided on special request.

6" (152,4 mm) TO 12" (304,8 mm)

CEILING TO TOP

DEFLECTOR

DISTANCE

4/12

SLOPE

MAXIMUM

MAXIMUM

THROW

APPLY

WRENCH AS

SHOWN

RECESS

(END "B")

FIGURE 2

MODEL SW-24 (TY5337)

EXTENDED COVERAGE ORDINARY HAZARD

HORIZONTAL SIDEWALL SPRINKLER

11.2 K-FACTOR, 3/4 INCH NPT

FIGURE 4

SPRINKLER PLACEMENT

UNDER SLOPED CEILINGS IN

LOADING DOCKS

FIGURE 1

MODEL SW-20 (TY5332)

EXTENDED COVERAGE ORDINARY HAZARD

HORIZONTAL SIDEWALL SPRINKLER

11.2 K-FACTOR, 3/4 INCH NPT

FIGURE 3

W-TYPE 3 SPRINKLER

NOTES

1. Backwall (where sprinkler is located) by sidewall (length of throw).

2. Requirement is based on minimum flow in GPM from each sprinkler. The indicted residual pressures are based on the nominal K-factor.

3. The centerline of the sprinkler waterway is located below the deflector as shown in Figures 1 and 2.

4. Minimum spacing is for lateral distance between sprinklers located along a single wall. Otherwise adjacent sprinklers (i.e., sidewall sprinklers on an adjacent wall, on an opposite wall, or pendent sprinklers) must be located outside of the maximum listed protection area of the extended coverage sidewall sprinkler being utilized.

MODEL SW-20 ECOH HORIZONTAL SIDEWALL SPRINKLER (TY5332)

OH Group 1 (0.15 gpm/sq-ft)

Response Rating

Coverage Area(1), Ft x Ft (m x m)

Minimum Flow(2), GPM (LPM)

Pressure(2), PSI (BAR)

Deflector-To-Ceiling Distance(3), In. (mm)

Temperature

Rating, °F

Spacing(4), Ft (m)

Standard 16 x 16 (4,9 x 4,9 38 (144) 11.5 (0,79) 6 to 12 (150 to 300) 155, 200 8 (2,4)

Standard 16 x 18 (4,9 x 5,5) 43 (163) 14.7 (1,01) 6 to 12 (150 to 300) 155, 200 8 (2,4)

Standard 16 x 20 (4,9 x 6,1) 48 (182) 18.4 (1,27) 6 to 12 (150 to 300) 155, 200 8 (2,4)

MODEL SW-20 ECOH HORIZONTAL SIDEWALL SPRINKLER (TY5332)

OH Group 2 (0.20 gpm/sq.-ft.)

Standard 16 x 16 (4,9 x 4,9 51 (193) 20.7 (1,43) 6 to 12 (150 to 300) 155, 200 8 (2,4)

Standard 16 x 18 (4,9 x 5,5) 58 (220) 26.8 (1,85) 6 to 12 (150 to 300) 155, 200 8 (2,4)

Standard 16 x 20 (4,9 x 6,1) 64 (242) 32.7 (2,25) 6 to 12 (150 to 300) 155, 200 8 (2,4)

MODEL SW-24 ECOH HORIZONTAL SIDEWALL SPRINKLER (TY5337)

OH Group 1 (0.15 gpm/sq.-ft.)

Standard 16 x 22 (4,9 x 6,7) 53 (200) 22.4 (1,54) 6 to 12 (150 to 300) 200 8 (2,4)

Standard 16 x 24 (4,9 x 7,3) 58 (220) 26.8 (1,85) 6 to 12 (150 to 300) 200 8 (2,4)

MODEL SW-24 ECOH HORIZONTAL SIDEWALL SPRINKLER (TY5337)

OH Group 2 (0.20 gpm/sq.-ft.)

Standard 16 x 22 (4,9 x 6,7) 71 (269) 40.2 (2,77) 6 to 12 (150 to 300) 200 8 (2,4)

Standard 16 x 24 (4,9 x 7,3) 77 (291) 47,3 (3,26) 6 to 12 (150 to 300) 200 8 (2,4)

TABLE A

UL AND C-UL LISTING COVERAGE AND FLOW RATE CRITERIA

Design Criteria The TYCO Model SW-20 and SW-24,

11.2 K-factor, Extended Coverage Ordi-

nary Hazard (ECOH) Horizontal Side-wall Sprinklers are for use in ordinary hazard occupancies with non-combus-tible un obstructed construction and with a ceiling slope not exceeding 2 inches per foot (9.2°), using the design criteria provided in Table A, (as well as any additional requirements speci-fied in NFPA 13 for Extended Coverage Sidewall Spray Sprinklers).

A 36 in. (914 mm) clearance must be maintained between the top of the sprinkler deflector and any miscella-neous storage.

The SW-20 and SW-24 may be in stalled on sloped ceilings in loading docks with a maximum roof slope of 4 in. per foot (18.4°) as shown in Figure 4 and using the design criteria provided in Table A.

The SW-20 and SW-24 can be used only for exposed applications. The SW-20 and SW-24 cannot be recessed.

Installation The TYCO Model SW-20 and SW-24,

11.2 K-factor, Extended Coverage Ordi-

nary Hazard (ECOH) Horizontal Side-wall Sprinklers must be installed in accordance with this section.

General Instructions Do not install any bulb type sprinkler if the bulb is cracked or there is a loss of liquid from the bulb. With the sprin-kler held horizontally, a small air bubble should be present. The diameter of the air bubble is approximately 1/16 in. (1,6 mm).

A leak tight 1/2 in. NPT sprinkler joint should be obtained with a minimum to maximum torque of 7 to 14 lb-ft (9,5 to 19,0 N·m). Higher levels of torque can distort the sprinkler Inlet with con-sequent leakage or impairment of the sprinkler.

Do not attempt to compensate for insufficient adjustment in the Sprinkler by under- or over-tightening the Sprin-kler/Support Cup Assembly. Re-adjust the position of the sprinkler fitting to suit.

Step 1. Horizontal sidewall sprinklers are to be installed with their center-line perpendicular to the back wall and parallel to the ceiling. The word “TOP” on the deflector is to face towards the ceiling.

Step 2. With pipe thread sealant applied to the pipe threads, hand tighten the sprinkler into the sprinkler fitting.

Step 3. Tighten the sprinkler into the sprinkler fitting using only the W-Type 3 (End B) Sprinkler Wrench (Ref. Figure 3). With reference to Figures 1 and 2, the W-Type 3 Sprinkler Wrench is to be applied to the sprinkler wrench flats

Care and Maintenance The TYCO Model SW-20 and SW-24,

11.2 K-factor, Extended Coverage Ordi-

nary Hazard (ECOH) Horizontal Side-wall Sprinklers must be maintained and serviced in accordance with this section.

Before closing a fire protection system main control valve for maintenance work on the fire protection system that it controls, obtain permission to shut down the affected fire protec-tion system from the proper authorities and notify all personnel who may be affected by this action.

The owner is responsible for the inspection, testing, and maintenance of their fire protection system and devices in compliance with this document, as well as with the applicable standards of the National Fire Protection Asso-ciation (e.g., NFPA 25), in addition to the standards of any other authorities having jurisdiction. Contact the install-ing contractor or sprinkler manufac-turer regarding any questions.

Automatic sprinkler systems should be inspected, tested, and maintained by a qualified Inspection Service in accor-dance with local requirements and/or national code.

Absence of an escutcheon, which is used to cover a clearance hole, may delay the time to sprinkler operation in a fire situation.

Automatic sprinklers must never be painted, plated, coated or other-wise altered after leaving the factory.

Modified sprinklers must be replaced.

Sprinklers that have been exposed to corrosive products of combustion, but have not operated, should be replaced if they cannot be completely cleaned by wiping the sprinkler with a cloth or by brushing it with a soft bristle brush.

Care must be exercised to avoid damage to the sprinklers before, during, and after installation. Sprin-klers damaged by dropping, striking, wrench twist/slippage, or the like, must be replaced. Also, replace any sprin-kler that has a cracked bulb or that has lost liquid from its bulb. (Ref. Installa-tion Section).

Frequent visual inspections are rec-ommended to be initially performed for corrosion resistant coated sprin-klers, after the installation has been completed, to verify the integrity of the corrosion resistant coating. Thereafter, annual inspections per NFPA 25 should suffice; however, instead of in specting from the floor level, a random sampling of close-up visual inspections should be made, so as to better determine the exact sprinkler condi tion and the long term integrity of the corrosion resistant coating as it may be affected by the corrosive conditions present.

Limited Warranty For warranty terms and conditions, visit www.tyco-fire.com.

Ordering Procedure Contact your local distributor for avail-ability. When placing an order, indi-cate the full product name and Part Numbers (P/N).

Sprinkler Assemblies with NPT Thread Connections:

Specify: Model (specify) ECOH Hori-zontal Sidewall Sprinkler, SIN (specify), (specify) temperature rating, (specify) finish, P/N (specify from Table B)

Sprinkler Wrench:

Specify: W-Type 3 Sprinkler Wrench, P/N 56-895-1-001

P/N 51 – XXX – X – XXX

SPRINKLER

TEMPERATURE

RATING

155 155°F (68°C) (SW-20 Only)

200 200°F (93°C) (SW-20 or SW-24)

SPRINKLER

FINISH

1 Natural Brass

4 Signal White (RAL9003) Polyester

9 Chrome Plated

MODEL SIN

072 Model SW-20 TY5332

073 Model SW-24 TY5337

TABLE B

MODEL SW-20 AND SW-24 ECOH HORIZONTAL SIDEWALL SPRINKLERS

WITH 3/4 INCH NPT CONNECTION

PART NUMBER SELECTION

NATIONAL FIRE PROTECTION ASSOCIATION and NFPA are registered trademarks of National Fire Protection Association;

TEFLON is a registered trademark of DuPont

1400 Pennbrook Parkway, Lansdale, PA 19446 | Telephone +1-215-362-0700

© 2018 Johnson Controls. All rights reserved. All specifications and other information shown were current as of document revision date and are subject to change without notice.

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Form Approved OMB No 9000-0062 Expires May 31, 2005

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM

NO.

SPECIFICATION SECTION/

PARA NO./DRAWING NO.

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc.)

AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE (YYYYMMDD) TYPE OR PRINT NAME AND GRADE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

For Evaluation and Action RNLT ________________ OR SOONER

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

TO: (Contractor)

APPROVED DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ____ DAYS OF DATE SHOWN BELOW.

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

TRACTOR CERTIFIES THAT

OF SUBJECT CONTRACT.

SrA Lydia Simpkins FARR Builders LLC S. Gevers, San Antonio, TX 78210 26 June 2019

FA4661-15-D-0001 69

68 FNWZ 12-0053

1 Per SOW Sidewall Sprinkler Head Details

2019-10 May Wayne Owens, PS

502 CE

1515150249C

Typewritten Text

X

PR

20190701

Patrick Rolan, GS-12

1514202059A

20190701

Mrs. Merry Sargent-Green, CO

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

UNDER NO CIRCUMSTANCE may the proposed sprinkler heads be substituted for the required sprinklers shown on FS201. Exterior Secured Receiving 14 is an outdoor space, the required sprinklers must be dry sidewall type, in this case, with a 200 degree temperature rating. The proposed extended coverage sprinkler heads are not rated for service in exterior conditions subject to freezing temperatures. They would freeze and burst at the first hard freeze this winter. If a dry type sidewall head can be located that qualifies as extended coverage, We would look at the possibility of substitution, contingent upon approval of the Fire Protection Engineer of record.

2019-07-01T11:27:10-0500

ROLAN.PATRICK.M.1515150249

2019-07-01T11:51:20-0500

SARGENTGREEN.MERRY.K.1138303361

File details come from the government source that posted it. Updated .