MS 011 Fire Alarm and Mass Notification MS 005a.pdf

PDF 6 MB Posted

Attached to
Repair Maintenance Shop BLDG 8040
Solicitation number
FA4661-21-R-0001
Issued by

View the file

Other files

File Type Posted
AF Form 3065 Dyess Progress Report 42 Gov.pdf PDF
12-0053 Addendum Four - New Contractor (11-19-20) v2.doc DOC document
12-0053 Addendum Three - New Contractor (11-9-20).pdf PDF
Solicitation Amendment FA466121R00010001 SF 30.pdf PDF
12-0053 Attachment C - Contractor Pricing Breakdown 11.29.16.xlsx XLSX spreadsheet
MS 004 Staging Plan.pdf PDF
MS 039 HM Doors Frames and Hardware.pdf PDF
MS 026 Cove Base Submittal.pdf PDF
MS 032 Concrete Vapor Barrier.pdf PDF
MS 042A Overhead Coiling Doors.pdf PDF
MS 030 Steel Shop Drawings.pdf PDF
MS 024 MBCI Panel Roof and Color Chart.pdf PDF
MS 037 MBCI and Welding Certifications.pdf PDF
AF Form 3065 Dyess Progress Report 42 Gov.pdf PDF
MS 044 Casework.pdf PDF
MS 079 Radius Bullnose for Doorways.pdf PDF
MS 007 Mech and Plumb Consumables.pdf PDF
MS 027-028 Metal Slat Fencing - Color.pdf PDF
MS 025 VCT.pdf PDF
MS 070 Water Meter Specifications.pdf PDF
MS 073 Breakroom Sink Type and Color.pdf PDF
MS 031A Toilet Partions and Accessories.pdf PDF
MS 016 HVAC Controls.pdf PDF
MS 055 South Structural Steel.pdf PDF
MS 006 Mech and Plumb.pdf PDF
MS 008 Abatement Plan.pdf PDF
MS 069 Sidewall Sprinkler Head.pdf PDF
MS 076 Backflow Preventer.pdf PDF
MS 064 Dryvit Backstop Air Barrier.pdf PDF
MS 021 HVAC.pdf PDF
MS 050 Welder Certification.pdf PDF
MS 083 Aerospace Air Shower Substitution.pdf PDF
MS 030 Steel Shop Drawings Page 2.pdf PDF
MS 029 Anchor Rod Shop Drawings and Details.pdf PDF
MS 001 QC Plan.pdf PDF
MS 065 Concrete Test Reports.pdf PDF
MS 020A Electrical Transformer.pdf PDF
MS 041 Toilet Accessories and Fire Ext.pdf PDF
MS 022 Louvers and Color Chart.pdf PDF
MS 035 Geotech Compaction Testing.pdf PDF
MS 078 078A Overhead Doors Warranty.pdf PDF
MS 023 Metal Panels.pdf PDF
MS 047 28 Day Concrete Test Results.pdf PDF
MS 061 Masonry Sealant Substitution.pdf PDF
MS 066 Roof Flashing.pdf PDF
REF 12 0053 PR 42 Thru 09 30 2019.xlsx XLSX spreadsheet
MS 010 Insulation.pdf PDF
MS 067 Steel Building Certifications.pdf PDF
MS 052 CMU Specs and Certs.pdf PDF
MS 036 MBCI Panels.pdf PDF
Show 40 more

Latest 50 of 163 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

2017-09-24T14:24:32-0600

Mary J. Froemke

2017-09-24T14:24:15-0600

Mary J. Froemke

2017-09-24T14:23:59-0600

Mary J. Froemke

2017-09-24T14:23:44-0600

Mary J. Froemke

2017-09-24T14:23:27-0600

Mary J. Froemke

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Form Approved OMB No 9000-0062

Expires May 31, 2005

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and

Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM

NO.

SPECIFICATION SECTION/

PARA NO./DRAWING NO.

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc.)

AP-

PROVED

DISAP-

PROVED

SEE

REVERSE

INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE (YYYYMMDD) TYPE OR PRINT NAME AND GRADE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

For Evaluation and Action RNLT ________________ OR SOONER

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

TO: (Contractor)

APPROVED

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ____ DAYS OF DATE SHOWN BELOW.

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

New Resubmittal

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

TO Contracting Officer: Capt. Hillary Ince

FROM Contractor: FARR Builders LLC S. Gevers, San Antonio, TX 78210

DATE: 25 Sept. 17

CONTRACT NUMBER: FA4661-15-D-0001

SUBMISSION NUMBER: 011

PREVIOUS SUBMISSION NUMBER: 010

PROJECT NUMBER: FNWZ 12-0053

ITEM NORow1: 1

SPECIFICATION SECTION PARA NODRAWING NORow1: Per Sow

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1: fire alarm

INITIALRow1: PR

ITEM NORow2:

SPECIFICATION SECTION PARA NODRAWING NORow2:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2: mass notification

INITIALRow2: PR

ITEM NORow3:

SPECIFICATION SECTION PARA NODRAWING NORow3:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3:

INITIALRow3:

ITEM NORow4:

SPECIFICATION SECTION PARA NODRAWING NORow4:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4:

INITIALRow4:

ITEM NORow5:

SPECIFICATION SECTION PARA NODRAWING NORow5:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5:

INITIALRow5:

ITEM NORow6:

SPECIFICATION SECTION PARA NODRAWING NORow6:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6:

INITIALRow6:

ITEM NORow7:

SPECIFICATION SECTION PARA NODRAWING NORow7:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7:

INITIALRow7:

ITEM NORow8:

SPECIFICATION SECTION PARA NODRAWING NORow8:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8:

INITIALRow8:

ITEM NORow9:

SPECIFICATION SECTION PARA NODRAWING NORow9:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9:

INITIALRow9:

ITEM NORow10:

SPECIFICATION SECTION PARA NODRAWING NORow10:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10:

INITIALRow10:

ITEM NORow11:

SPECIFICATION SECTION PARA NODRAWING NORow11:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11:

INITIALRow11:

DATE YYYYMMDD: 2017-08-15

TYPE OR PRINT NAME AND GRADE: Rene Garcia

TO Base Civil Engineering Officer: 7 CES

RNLT:

DATE YYYYMMDD_2: 20170926

TYPE OR PRINT NAME AND GRADE_2: SrA Vitaliy Poprozhuk

TO AF Contracting Office: 7 CONS

DATE YYYYMMDD_3: 20170926

TYPE OR PRINT NAME AND GRADE_3: Patrick Rolan, GS-12

TO Contractor: FARR

DATE YYYYMMDD_4: 20170926

TYPE OR PRINT NAME AND GRADE_4: Capt Hilary Ince

2017-09-26T10:09:52-0500

POPROZHUK.VITALIY.NIKOLAYEVI.1462881092

2017-09-26T09:53:13-0500

ROLAN.PATRICK.M.1515150249

2017-09-26T10:25:21-0500

INCE.HILARY.RAE.1368173785

Text5:

Check Box6: Yes

Check Box7: Off

Check Box8: Off

Check Box9: Yes

Check Box10: Off

Check Box11: Off

Check Box12: Off

Check Box13: Off

Check Box14: Off

Check Box15: Off

Check Box16: Off

Check Box17: Off

Check Box18: Off

Check Box19: Off

Check Box20: Off

Check Box21: Off

Check Box22: Off

Check Box23: Off

Check Box24: Off

Check Box25: Off

Check Box26: Off

Check Box27: Off

Check Box28: Off

Check Box29: Off

Check Box30: Off

Check Box31: Off

Check Box32: Off

Check Box33: Off

Check Box34: Off

Check Box35: Off

Check Box36: Off

Check Box37: Off

Check Box38: Off

Check Box3: Yes

Check Box4: Yes

Check Box5: Off

Check Box40: Off

COMMENTS Number to correspond with applicable Item Number on reverseRow1:

Check Box39: Yes

Check Box50: Yes

2017-08-08T16:34:03-0500

Rene Garcia

AF 66

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/ CONTRACT NUMBER

FNWZ 12-0053 North Addition to B8040 FA4661-15-D-0001

TO BE COMPLETED BY PROJECT ENGINEER North Addition to B8040

NUMBER OF COPIES REQUIRED = 3 REQUIRED SUBMISSION DATE

Line Number ITEMS OR DESCRIPTION CERTIFICATION OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURER'S RECOMMENDATIONS MANUFACTURER'S WARRANTY CATALOG DATA OPERATING INSTRUCTIONS MSDS OTHER PLANS DATE RECEIVED IN CONTRACTING DATE TO CIVIL ENGINEERING RETURN SUSPENSE DATE SUBMITTAL NUMBER DATE CONTRACTOR CONTRACTOR RESUBMITTAL FINAL APPROVAL REMARKS

OF ITEM, CONTRACT REFERENCE, TYPE OF NOTIFIED

SUBMITTAL APPROVED DIS-APPROVED

1 safety plan x n/a 06/28/17

2 QC plan x 06/28/17

3 bonds x 07/25/17

4 saging plan x 08/08/17

5 fire alarm x x x x x

6 mass/notification x x x x x

7 Plumbing x x

8 Mechanical x x 08/15/17

9 plumbing consumables x x x x

10 mechanical consumables x x x x rene garcia: rene garcia:

08/21/17

11 Abatement Plan x 08/25/17

12 plumbing fixtures x x 08/30/17

13 hvac/plumbing insulation x x x x 09/12/17

14 fire alarm/ mass Not. x 9/25