This document is an Air Force Form (AF IMT 3065) for a Contract Progress Report, designed to track and document the percentage of contract work completed during a specific period. The form allows contractors to report progress by work element, indicating the percentage of total job completed both for the current reporting period and cumulatively. The form includes sections for the contractor to provide details such as report number, period covered, project number, contract number, and completion date. At the bottom, there are signature lines for the contractor and base civil engineer to certify the work completion, as well as a review section for the contracting officer. The document is associated with OMB No. 0704-0188 and is intended to potentially support progress payments at the Contracting Officer's discretion.

View the file

Other files

File Type Posted
Solicitation Amendment FA486125R00030017 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030017.pdf PDF
Solicitation Amendment - FA486125R00030013.pdf PDF
Attach 79 RFI Log SABER Seed 29 Jan 2026_.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030011 SF 30 .pdf PDF
2 - Price Schedule _13 Jan 2026.xlsx XLSX spreadsheet
3 - Self Scoring Matrix 7_Jan 26.xlsx XLSX spreadsheet
44 -Statement of Objectives (SOO) for RKMF 240010 20 Nov 25.pdf PDF
Solicitation Amendment - FA486125R00030009.pdf PDF
Solicitation Amendment FA486125R00030009_SF 30.pdf PDF
Solicitation Amendment FA486125R00030006 SF 30.pdf PDF
(Attachment 57) SABER Seed SOO Honor Guard Building 10250 Attachment 3 - As-Builts 65 LOCATION and GRADING.pdf PDF
(Attachment 58) SABER Seed SOO Honor Guard Building 10250 Attachment 5 - Attachment 5 AFGIMS Utilities Snapshot.pdf PDF
(Attachment 60) SABER Seed SOO Honor Guard Building 10250 Attachment 7 - Sewer Line with Measurements and Pictures.pdf PDF
(Attachment 68) SABER Seed SOO Honor Guard Building 10250 Attachment 15 - B10250 room numbers.pdf PDF
(Attachment 70) SABER Seed SOO Honor Guard Building 10250 Attachment 17 - Double Check Valve Assembly.pdf PDF
Solicitation Amendment - FA486125R00030006.pdf PDF
Solicitation Amendment - FA486125R00030005.pdf PDF
Solicitation Amendment FA486125R00030004 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030004.pdf PDF
Solicitation Amendment - FA486125R00030003.pdf PDF
Atch 41 NV20250038 19Sep25 Bldg Clark.pdf PDF
Atch 43 NV20250001 1Aug25 NTTR.pdf PDF
Solicitation Amendment FA486125R00030001 SF 30.pdf PDF
Atch 40 NV20250024 19Sep25 Hvy Clark.pdf PDF
Solicitation - FA486125R0003.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf PDF
27 - NTTR Visit Request - 27 Jan 2023.pdf PDF
28 - Nuclear Gauge Form 1.xlsx XLSX spreadsheet
29 - Nuclear Gauge Form 2.docx DOCX document
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf PDF
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
2 - Price Schedule 23 September 25.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB NO. 0704-0188CONTRACT PROGRESS REPORT

Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO : SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060.

CONTRACTOR ADDRESS

REPORT NO. PERIOD COVERED

FROM:

PROJECT NO. CONTRACT NO. COMPLETION DATE

TO:

LINE

NO.

% OF

TOTAL JOB

% COMPLETED

THIS PERIOD

% COMPLETED

CUMULATIVE

WORK ELEMENT

TOTAL

REMARKS

At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.

PROGRESS OR COMPLETION CERTIFICATE

I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.

SUBMITTED BY OR FOR

CONTRACTOR BASE CIVIL ENGINEER

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

CONTRACTOR:
ADDRESS:
REPORT NO:
FROM:
TO:
PROJECT NO:
CONTRACT NO:
COMPLETION DATE:
LINE NORow1:
WORK ELEMENTRow1:
OF TOTAL JOBRow1:
COMPLETED THIS PERIODRow1:
COMPLETED CUMULATIVERow1:
LINE NORow2:
WORK ELEMENTRow2:
OF TOTAL JOBRow2:
COMPLETED THIS PERIODRow2:
COMPLETED CUMULATIVERow2:
LINE NORow3:
WORK ELEMENTRow3:
OF TOTAL JOBRow3:
COMPLETED THIS PERIODRow3:
COMPLETED CUMULATIVERow3:
LINE NORow4:
WORK ELEMENTRow4:
OF TOTAL JOBRow4:
COMPLETED THIS PERIODRow4:
COMPLETED CUMULATIVERow4:
LINE NORow5:
WORK ELEMENTRow5:
OF TOTAL JOBRow5:
COMPLETED THIS PERIODRow5:
COMPLETED CUMULATIVERow5:
LINE NORow6:
WORK ELEMENTRow6:
OF TOTAL JOBRow6:
COMPLETED THIS PERIODRow6:
COMPLETED CUMULATIVERow6:
LINE NORow7:
WORK ELEMENTRow7:
OF TOTAL JOBRow7:
COMPLETED THIS PERIODRow7:
COMPLETED CUMULATIVERow7:
LINE NORow8:
WORK ELEMENTRow8:
OF TOTAL JOBRow8:
COMPLETED THIS PERIODRow8:
COMPLETED CUMULATIVERow8:
LINE NORow9:
WORK ELEMENTRow9:
OF TOTAL JOBRow9:
COMPLETED THIS PERIODRow9:
COMPLETED CUMULATIVERow9:
LINE NORow10:
WORK ELEMENTRow10:
OF TOTAL JOBRow10:
COMPLETED THIS PERIODRow10:
COMPLETED CUMULATIVERow10:
LINE NORow11:
WORK ELEMENTRow11:
OF TOTAL JOBRow11:
COMPLETED THIS PERIODRow11:
COMPLETED CUMULATIVERow11:
LINE NORow12:
WORK ELEMENTRow12:
OF TOTAL JOBRow12:
COMPLETED THIS PERIODRow12:
COMPLETED CUMULATIVERow12:
LINE NORow13:
WORK ELEMENTRow13:
OF TOTAL JOBRow13:
COMPLETED THIS PERIODRow13:
COMPLETED CUMULATIVERow13:
LINE NORow14:
WORK ELEMENTRow14:
OF TOTAL JOBRow14:
COMPLETED THIS PERIODRow14:
COMPLETED CUMULATIVERow14:
LINE NORow15:
WORK ELEMENTRow15:
OF TOTAL JOBRow15:
COMPLETED THIS PERIODRow15:
COMPLETED CUMULATIVERow15:
OF TOTAL JOBTOTAL:
COMPLETED THIS PERIODTOTAL:
COMPLETED CUMULATIVETOTAL:
REMARKS: ACTUAL %: _____

SCHEDULED %: _______

undefined:
BASE CIVIL ENGINEER: Off
TYPE OR PRINT NAME AND TITLE:
DATE:
TYPE OR PRINT NAME AND TITLE_2:
DATE_2:

File details come from the government source that posted it. Updated .