The document is an Air Force Form 3065 Contract Progress Report template designed for tracking and reporting contract progress. The form allows contractors to document work completion percentages for various work elements, with columns for total job percentage, percentage completed in the current period, and cumulative percentage completed. The form includes sections for contractor and base civil engineer certification of work progress, and is intended to potentially support progress payment calculations at the Contracting Officer's discretion. The template is associated with the Nellis AFB Paving IDIQ contract (Solicitation Number FA486125R0006), which will be an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for construction and repair paving projects at Nellis Air Force Base and southern portions of the Nevada Test and Training Range, to be awarded through individual task orders by the 99th Contracting Squadron.

View the file

Other files

File Type Posted
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE.xlsx XLSX spreadsheet
Solicitation - FA486125R0006.pdf PDF
Atch 44-APPENDIX 42 Uniform Standard Specifications for Clark County.pdf PDF
Atch 42-APPENDIX 40 Uniform Design and Construction Standards (UDACS).pdf PDF
Atch 41-APPENDIX 39 Nellis-Creech IFS Electrical Req.pdf PDF
Atch 34-APPENDIX 32 Installation Plan 12 - Hazardous Waste Management Plan (27 Sep 23).pdf PDF
Atch 31-APPENDIX 29 AF 3064 Progress Schedule Template.xlsx XLSX spreadsheet
Atch 24-APPENDIX 22 NAFB 0-74 Range Pass.pdf PDF
Atch 23-APPENDIX 21 Nuclear Gauge Request Form 2.pdf PDF
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf PDF
Atch 17-APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 15-APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 12-APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10-APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 9-APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 7-APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 4-APPENDIX 2 Mooring Detail.pdf PDF
Atch 50-Past Performance Questionnaire.pdf PDF
Atch 49-Past Performance Information Sheet.pdf PDF
Atch 47-AF Form 103 - Outage Request.pdf PDF
Atch 46-Nellis Single Pass (2 Months Max).pdf PDF
Atch 45-99 SFS-Mass Pass Request.xlsx XLSX spreadsheet
Atch 40-APPENDIX 38 Nellis-Creech 2710 Communication Installation Standards.pdf PDF
Atch 39-APPENDIX 37 Typical Exterior Color Schedule.pdf PDF
Atch 38-APPENDIX 36 AF 3000 Material Approval Submittal.pdf PDF
Atch 37-APPENDIX 35 AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
Atch 36-APPENDIX 34 NAFB Suitable Tree List.pdf PDF
Atch 33-APPENDIX 31 14_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP (15 Nov 2019).pdf PDF
Atch 18-Appendix 16 Nellis Creech IFS.pdf PDF
Atch 14-APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE 09AUG24_Blank.xlsx XLSX spreadsheet
Atch 52-NV20250001 Building Heavy and Highway.pdf PDF
Atch 51-Sample Client Authorization Letter.pdf PDF
Atch 48-Sub or Teaming Partner Consent Form.pdf PDF
Atch 43-APPENDIX 41 Uniform Standard Drawings for Clark County.pdf PDF
Atch 35-APPENDIX 33 Desert Tortoise Temporary Fencing Guidelines.pdf PDF
Atch 29-APPENDIX 27 NTTR Visit Request.pdf PDF
Atch 28-APPENDIX 26 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 27-APPENDIX 25 National Manual Uniform Traffic Control Devices 11th Edition.pdf PDF
Atch 26-APPENDIX 24 Work Clearance Triggers.pdf PDF
Atch 25-APPENDIX 23 Env Permit-ATP Guidance (2023).pdf PDF
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf PDF
Atch 3-APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 53-NV20250058 Highway.pdf PDF
Atch 32-APPENDIX 30 Plan 32-7086 Hazardous Material Management Plan June 2021.pdf PDF
Atch 22-APPENDIX 20 Nuclear Gauge Request Form 1.xlsx XLSX spreadsheet
Atch 21-APPENDIX 19 Schedule of Values Template.xlsx XLSX spreadsheet
Atch 16-APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13-APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11-APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB NO. 0704-0188CONTRACT PROGRESS REPORT

Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO : SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060.

CONTRACTOR ADDRESS

REPORT NO. PERIOD COVERED

FROM:

PROJECT NO. CONTRACT NO. COMPLETION DATE

TO:

LINE

NO.

% OF

TOTAL JOB

% COMPLETED

THIS PERIOD

% COMPLETED

CUMULATIVE

WORK ELEMENT

TOTAL

REMARKS

At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.

PROGRESS OR COMPLETION CERTIFICATE

I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.

SUBMITTED BY OR FOR

CONTRACTOR BASE CIVIL ENGINEER

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

CONTRACTOR:
ADDRESS:
REPORT NO:
FROM:
TO:
PROJECT NO:
CONTRACT NO:
COMPLETION DATE:
LINE NORow1:
WORK ELEMENTRow1:
OF TOTAL JOBRow1:
COMPLETED THIS PERIODRow1:
COMPLETED CUMULATIVERow1:
LINE NORow2:
WORK ELEMENTRow2:
OF TOTAL JOBRow2:
COMPLETED THIS PERIODRow2:
COMPLETED CUMULATIVERow2:
LINE NORow3:
WORK ELEMENTRow3:
OF TOTAL JOBRow3:
COMPLETED THIS PERIODRow3:
COMPLETED CUMULATIVERow3:
LINE NORow4:
WORK ELEMENTRow4:
OF TOTAL JOBRow4:
COMPLETED THIS PERIODRow4:
COMPLETED CUMULATIVERow4:
LINE NORow5:
WORK ELEMENTRow5:
OF TOTAL JOBRow5:
COMPLETED THIS PERIODRow5:
COMPLETED CUMULATIVERow5:
LINE NORow6:
WORK ELEMENTRow6:
OF TOTAL JOBRow6:
COMPLETED THIS PERIODRow6:
COMPLETED CUMULATIVERow6:
LINE NORow7:
WORK ELEMENTRow7:
OF TOTAL JOBRow7:
COMPLETED THIS PERIODRow7:
COMPLETED CUMULATIVERow7:
LINE NORow8:
WORK ELEMENTRow8:
OF TOTAL JOBRow8:
COMPLETED THIS PERIODRow8:
COMPLETED CUMULATIVERow8:
LINE NORow9:
WORK ELEMENTRow9:
OF TOTAL JOBRow9:
COMPLETED THIS PERIODRow9:
COMPLETED CUMULATIVERow9:
LINE NORow10:
WORK ELEMENTRow10:
OF TOTAL JOBRow10:
COMPLETED THIS PERIODRow10:
COMPLETED CUMULATIVERow10:
LINE NORow11:
WORK ELEMENTRow11:
OF TOTAL JOBRow11:
COMPLETED THIS PERIODRow11:
COMPLETED CUMULATIVERow11:
LINE NORow12:
WORK ELEMENTRow12:
OF TOTAL JOBRow12:
COMPLETED THIS PERIODRow12:
COMPLETED CUMULATIVERow12:
LINE NORow13:
WORK ELEMENTRow13:
OF TOTAL JOBRow13:
COMPLETED THIS PERIODRow13:
COMPLETED CUMULATIVERow13:
LINE NORow14:
WORK ELEMENTRow14:
OF TOTAL JOBRow14:
COMPLETED THIS PERIODRow14:
COMPLETED CUMULATIVERow14:
LINE NORow15:
WORK ELEMENTRow15:
OF TOTAL JOBRow15:
COMPLETED THIS PERIODRow15:
COMPLETED CUMULATIVERow15:
OF TOTAL JOBTOTAL:
COMPLETED THIS PERIODTOTAL:
COMPLETED CUMULATIVETOTAL:
REMARKS: ACTUAL %: _____

SCHEDULED %: _______

undefined:
BASE CIVIL ENGINEER: Off
TYPE OR PRINT NAME AND TITLE:
DATE:
TYPE OR PRINT NAME AND TITLE_2:
DATE_2: