This document is a Task Assignment Change Order (TACO #1) between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (Intertek-PSI), a contractor operating under Contract Number HW686. The change order amends the original Task Assignment DC021A for the Coastal Cleaners environmental remediation project located at 2166 Main Street in Dunedin, Pinellas County, Florida (ERIC_5272). The project manager for FDEP is Kelly Crain, and the contractor's project manager is Nana Westmark, Senior Geologist/Principal Consultant.

The change order reconciles Work Change Directive #1 by adding new granular activated carbon (GAC) vessel and reconfiguring the manifold on the Soil Vapor Extraction (SVE) system, and provides a 60-day time extension to address delays caused by power supply issues. The amended total task value increased from $180,217.65 to $188,978.70, representing an increase of $8,761.05. This includes a fixed unit rate of $187,829.70 and cost reimbursement of $1,149.00 for utilities. The task completion date was extended from March 14, 2024, to May 13, 2024 (a 60-day extension). The WCD #1 cost of $8,800.00 (covering carbon at $2,800, labor at $4,000, and materials/equipment/travel at $2,000) was incorporated into the change order with subcontractor WD Environmental Services providing the carbon filter installation and manifold cover work for $7,800.00. Deliverables include system installation documentation, start-up field notes, construction completion reports, operations and maintenance checklists, and project management services, with invoicing structured around FDEP approval milestones through February 12, 2024.

View the file

Other files

File Type Posted
CN-370000-HW686-DC003C.pdf PDF
CN-370000-HW686-DC004A.pdf PDF
CN-370000-HW686-DC004B.pdf PDF
CN-370000-HW686-DC006B.pdf PDF
CN-370000-HW686-DC006C.pdf PDF
CN-370000-HW686-DC008A.pdf PDF
CN-370000-HW686-DC008C.pdf PDF
CN-370000-HW686-DC009A.pdf PDF
CN-370000-HW686-DC010E.pdf PDF
CN-370000-HW686-DC011C.pdf PDF
CN-370000-HW686-DC012A.pdf PDF
CN-370000-HW686-DC013B.pdf PDF
CN-370000-HW686-DC013C.pdf PDF
CN-370000-HW686-DC01ACO5.pdf PDF
CN-370000-HW686-DC020A.pdf PDF
CN-370000-HW686-DC027A.pdf PDF
CN-370000-HW686-DC029A.pdf PDF
CN-370000-HW686-DC02ECO1.pdf PDF
CN-370000-HW686-DC02ECO2.pdf PDF
CN-370000-HW686-DC030A.pdf PDF
CN-370000-HW686-DC03ACO1.pdf PDF
CN-370000-HW686-DC03DCO1.pdf PDF
CN-370000-HW686-DC04ACO1.pdf PDF
CN-370000-HW686-DC05CCO1.pdf PDF
CN-370000-HW686-DC05CCO2.pdf PDF
CN-370000-HW686-DC07BCO2.pdf PDF
CN-370000-HW686-DC07ECO1.pdf PDF
CN-370000-HW686-DC10ACO1.pdf PDF
CN-370000-HW686-DC11ACO1.pdf PDF
CN-370000-HW686-DC14BCO1.pdf PDF
CN-370000-HW686-DC19BCO1.pdf PDF
CN-370000-HW686-DC21BCO2.pdf PDF
CN-370000-HW686-DC21BCO3.pdf PDF
CN-370000-HW686-DC22ACO1.pdf PDF
CN-370000-HW686-DCO24B.pdf PDF
CN-370000-HW686-FIL11.pdf PDF
CN-370000-HW686-FIL4.pdf PDF
CN-370000-HW686-FIL5.pdf PDF
CN-370000-HW686-FIL7.pdf PDF
CN-370000-HW686-HW006A.pdf PDF
CN-370000-HW686-HW007A.pdf PDF
CN-370000-HW686-HW010A.pdf PDF
CN-370000-HW686-SA253.pdf PDF
CN-370000-HW686-SA253CO1.pdf PDF
CN-370000-HW686-DC001B.pdf PDF
CN-370000-HW686-DC002B.pdf PDF
CN-370000-HW686-DC002D.pdf PDF
CN-370000-HW686-DC003F.pdf PDF
CN-370000-HW686-DC004D.pdf PDF
CN-370000-HW686-DC005B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC021A 1 HW686

This Change Order reconciles WCD #1 to add new carbon and reconfigure the manifold on the SVE system, and provides a 60-day time extension.

Kelly Crain 850-245-8953 Contractor Contractor

Contractor Contractor

Contractor

Intertek-PSI (PSI) Nana Westmark 813–886–1075 Ext 2

ERIC_5272

Coastal Cleaners

✔ $ 187,829.70 $ 179,068.65 ✔ $ 1,149.00 1149.00

$ 188,978.70 $ 180,217.65 Completion

Completion✔ 03/14/2024 05/13/2024 60

✔ 1 1 1

Professional Service Industries, Inc. (Intertek-PSI)

Nana Westmark

Senior Geologist / Principal Consultant

Nana G Westmark Digitally signed by Nana G Westmark Date: 2023.10.19 07:08:06 -04'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.10.18 12:24:57 -04'00'

10/18/23

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW686

DC021A

$ 188,978.70

Subtask2 and 7 : Initial System installation documentation submittal

Subtask 3: System start up field notes

Subtasks 1,4,&6: Construction completion report AND 1 month O&M check list AND Project Management

Subtask 5: utilities 1 month

Submittal and FDEP approval of the Initial System installation documentation Subtask 2 and 7

Submittal and FDEP approval of the Construction completion report AND 1 month O&M check list AND Project Management Subtasks 1,4,&6

Upon receipt of Paid Utility Invoices: Subtask 5 Utilities (Cost Plus Fixed Fee): not to exceed $1149.00 Handling Fee: $490.00

Submittal and FDEP approval of the System start up field notes Subtask 3

11/30/2023

12/11/2023

01/22/2024

02/12/2024

$ 6,968.81

$ 164,310.56

$ 16,060.33

$ 1,639.00

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO:

FROM:

ERIC_5272

Coastal Cleaners

Kelly Crain, Acting Project Manager

SUBJECT: Negotiation Summary

HW686 DC021A

Change Order #1

DATE: October,16 2023

This Change Order reconciles WCD#1 for the addition of carbon and reconfiguring the manifold on the SVE system, as well as provides a 60-day time extension due to delays with the power supply.

Total task amount has been increased to $188,978.70. PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is February 12, 2024. Task completion date is May 13, 2024.

FDEP COST ESTIMATEContractor: Professional Service Industries, Inc.

Date: 10/16/2023

Task #: DC021A SUBTASK 1: Project Management SUBTASK 6: 1 Month O&M

Site: Coastal Cleaners ERIC_52 SUBTASK 2: System Installation SUBTASK 7: Reconcile WCD-1, Carbon

Activity/Phase: SUBTASK 3: Start-up SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: CCR SUBTASK 9:

SUBTASK 5: Utilities SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$56.99 Project Manager 35 35.1 $64.90 Principal Consultant, DC 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $40.87 Project Engineer, MK 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $56.99 Senior Geologist, NW 9 8.0 0.0 0.0 0.0 0 1 0 0 0 $60.00 Senior Engineer, MR 13 0.0 5.0 5.0 0.0 3 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $56.50 Certified Hazardous Materials Manager 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $57.69 Senior Geologist, MR 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $43.27 Project Engineer, JN 97 46.0 14.0 31.0 0.0 6 0 0 0 0 $37.00 Project Geologist, SAM 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.77 Project Scientist, RF 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $33.74 Project Scientist, SB 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $25.00 Staff Scientist, QH 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.86 GIS Specialist, DG 6 0.0 0.0 6.0 0.0 0 0 0 0 0 $24.04 Staff Scientist, OG 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $28.85 Staff Scientist, RP 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $31.51 Remediation Coordinator, RH 301 261.5 18.0 0.0 0.0 21 0 0 0 0 $30.91 Environmental Specialist, CC 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $22.06 Environmental Specialis, MZ 10 10.0 0.0 0.0 0.0 0 0 0 0 0 $21.26 Environmental Specialist,DK 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $20.81 Administrative Assistant, BM 2 0.0 0.0 2.0 0.0 0 0 0 0 0 $15.50 Secretary 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $15.00 Senior Laborer 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $12.00 Laborer 0 0.0 0.0 0.0 0.0 0 0 0 0 0

Total Hours 472.6 35.1 325.5 37.0 44.0 0.0 30 1 0 0 0

Professional Service Industries, Inc.

Direct Labor $17,402.27 $2,002.03 $10,906.81 $1,472.96 $1,862.15 $0.00 $1,101.33 $56.99 $0.00 $0.00 $0.00

Overhead 151.02% $26,280.91 $3,023.47 $16,471.46 $2,224.46 $2,812.22 $0.00 $1,663.23 $86.07 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (PSI) $43,683.18 $5,025.50 $27,378.27 $3,697.42 $4,674.37 $0.00 $2,764.56 $143.06 $0.00 $0.00 $0.00

Other Direct Costs $870.12 $100.10 $545.34 $73.65 $93.11 $0.00 $55.07 $2.85 $0.00 $0.00 $0.00 Travel

Vehicle Rental $3,600.00 $2,880.00 $480.00 $0.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $3,600.00 $2,880.00 $480.00 $0.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00

SVE Install, Startup, CCR & O&M

REV: 02/03 CEF_PSI.XLS Page 1

Task #: DC021A SUBTASK 1: Project Management SUBTASK 6: 1 Month O&M

Site: Coastal Cleaners ERIC_52 SUBTASK 2: System Installation SUBTASK 7: Reconcile WCD-1, Carbon

Activity/Phase: SUBTASK 3: Start-up SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: CCR SUBTASK 9:

SUBTASK 5: Utilities SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10

SVE Install, Startup, CCR & O&M

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying / GPR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $1,149.00 $0.00 $0.00 $0.00 $1,149.00 $0.00 $0.00 $0.00 $0.00 $0.00 WD Environmental $115,425.00 $107,625.00 $0.00 $0.00 $0.00 $0.00 $7,800.00 $0.00 $0.00 $0.00 Duke Energy $1,005.29 $1,005.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $118,329.29 $109,380.29 $0.00 $0.00 $1,149.00 $0.00 $7,800.00 $0.00 $0.00 $0.00 Handling Fee $10,326.78 $9,056.78 $0.00 $0.00 $490.00 $0.00 $780.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $128,656.07 $118,437.07 $0.00 $0.00 $1,639.00 $0.00 $8,580.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $3,211.00 $881.00 $1,398.00 $0.00 $0.00 $932.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,211.00 $881.00 $1,398.00 $0.00 $0.00 $932.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $1,000.00 $840.00 $80.00 $0.00 $0.00 $80.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $500.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $3,090.00 $1,350.00 $870.00 $0.00 $0.00 $870.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $4,590.00 $2,690.00 $950.00 $0.00 $0.00 $950.00 $0.00 $0.00 $0.00 $0.00

Subtotal $184,610.37 $5,125.60 $152,811.68 $6,599.07 $4,767.48 $1,639.00 $4,941.63 $8,725.91 $0.00 $0.00 $0.00 Completion Fee $4,368.33 $502.55 $2,737.83 $369.74 $467.44 $0.00 $276.46 $14.31 $0.00 $0.00 $0.00

Total Estimated Cost $188,978.70 $5,628.15 $155,549.51 $6,968.81 $5,234.92 $1,639.00 $5,218.09 $8,740.22 $0.00 $0.00 $0.00

Delta $8,761.05 $20.83 $0.00 $0.00 $0.00 $0.00 $0.00 $8,740.22 $0.00 $0.00 $0.00

Original DC021A $180,217.65 $5,607.32 $155,549.51 $6,968.81 $5,234.92 $1,639.00 $5,218.09 $0.00 $0.00 $0.00 $0.00

Math $188,978.70 $5,628.15 $155,549.51 $6,968.81 $5,234.92 $1,639.00 $5,218.09 $8,740.22 $0.00 $0.00 $0.00

Difference rounding $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF_PSI.XLS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Coastal Cleaners ERIC_5272 SUBTASK 2: System Installation

DATE: 10/16/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist Evaluate final permit submittal 3.0 (N. Westmark) Provide notices to tenant / owner 3.0

Evaluate final construction drawings for submittal 2.0

Total Hours: 8.0 Project Engineer Travel (roundtrip), preconstruction meeting 3.0 (J. Newell) Preconstruction Meeting 2.0

Update Construction Drawings 3.0 Professional Engineer site review 8.0 Provide technical support to the field crew 10.0 On-Site construction to develop as-builts 10.0 On-site oversight 10.0

Total Hours: 46.0

Remediation Specialist, R Hanson (R. Hanson) Permitting Assistance, Notice of Commencement 5.0

Develop a Site Specific Health and Safety Plan 1.0 Travel (roundtrip) for clean fill sample at borrow pit 3.0 Collect soil sample for clean fill analysis 0.5 Travel (roundtrip) for site visit for layout 3.0 Site visit for layout development 2.0 Develop construction logistics, staging, vehicular access, material storage 8.0 vendors oversee, site owner, place orders, schedule construction commencement Field event preparation 4.0 Travel (roundtrip) for preconstruction meeting 3.0 Preconstruction Meeting 2.0 Transport system to site, set-up 10.0 Cleanup, troubleshoot old system 8.0 Oversite of Construction activities (10 hrs/day x 20 days) 200.0 Oversite of Electrical Contractor (10 hr/day x 1day) 10.0 stage IDW drums, label, 2.0

Total Hours: 261.5

Environmental Specialist, M Zilske Transport system to site, set-up 10.0

TOTAL LABOR 325.5

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Construction Construction/O&M Kit $75.00 day 2 $150.00

$300.00 week 4 $1,200.00

Drums $100.00 each 5 $500.00 Expendables $40.00 per day 21 $840.00

TOTAL EQUIPMENT $2,690.00

Page 3 CO-1 Coastal Cleaners ERIC_5272 DC021A

SUBTASK 2: System Installation

DATE: 10/16/2023

VEHICLE TYPE RATE UNIT USAGE

Travel to Borrow Pit for Clean Fill Sample Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00

Transport to Site Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00

Site Layout Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00

Pre construction Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00

Transport System to Site Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00 Equipment Van / Truck / Flat bed (Environmental Specialist) $120.00 day $0.00

Construction Equipment Van / Truck (Staff Scientist) $97.00 day 0 $0.00 Equipment Van / Truck (Remediation Specialist) $480.00 week 4 $1,920.00 Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00

Equipment Van / Truck (Project Engineer) $120.00 day 2 $240.00

TOTAL VEHICLE $2,880.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM -$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs, by EPA Method 8260 $73.00 3 $219.00

Clean Fill Sample Semi-volatiles, PAH Method 8270 (solid) $110.00 1 $110.00 Base/Neutral/Acid Extractables, Method 8270 (solid) $240.00 1 $240.00 Arsenic, Method 6010 (solid) $13.00 1 $13.00 Barium, Method 6010 (solid) $13.00 1 $13.00 Cadmium, Method 6010 (solid) $13.00 1 $13.00 Chromium, Method 6010 (solid) $13.00 1 $13.00 Lead, Method 6010 (solid) $13.00 1 $13.00 Mercury, Method 7471 (solid) $28.00 1 $28.00 Selenium, Method 6010 (solid) $13.00 1 $13.00 Silver, Method 6010 (solid) $13.00 1 $13.00 Pesticides, Organochlorine Method 8081 (solid) $105.00 1 $105.00 FL-PRO (solid) $88.00 1 $88.00

TOTAL LAB $881.00

SUBCONTRACTOR COSTS

NAME PURPOSE

Services WD Environmental Remedial Construction Contractor per quote $107,625.00

(includes system install, fence, electrical sub)

Duke Energy Power Drop per quote #REF! $1,005.29

Petrotech Southeast IDW 5 $150.00 $750.00

TOTAL SUBCONTRACTOR $109,380.29

Page 4 CO-1 Coastal Cleaners ERIC_5272 DC021A

SUBTASK 3: Start-up

DATE: 10/16/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Download telemetry software and troubleshoot communication 3.0 Provide technical support to the field crew from the office 2.0

Total Hours: 5.0 Remediation Specialist, R Hanson Travel (roundtrip) 3.0

Field Event Preparation 1.0 Conduct system startup, optimize performance, troubleshoot operation 6.0 Collect vacuum/flow measurements 2.0 Collect vapor samples for PID screening 2.0 Collect vapor analytical samples 2.0 Pick-up / drop-off samples 2.0

Total Hours: 18.0

Project Engineer, J Newell Travel (roundtrip) 3.0 Conduct system startup, optimize performance, troubleshoot system 6.0 Collect vacuum/flow measurements 2.0 Collect vapor samples for PID screening 2.0 Collect vapor analytical samples 1.0

Total Hours: 14.0

TOTAL LABOR 37.0

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 2 $720.00 Construction/O&M supplies $75.00 day 2 $150.00

$870.00 Expendables $40.00 day 2 $80.00

TOTAL EQUIPMENT $950.00

VEHICLE TYPE RATE UNIT USAGE

Equipment Van / Truck (staff scientist) $120.00 day 2 $240.00 Equipment Van / Truck (project engineer) $120.00 day 2 $240.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (4 SVE wells, effluent and influent) 200.00$ 6 0 1,200.00$ Summa Cannisters 33.00$ 6 198.00$

1,398.00$

TOTAL LAB 1,398.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

Page 5 CO-1 Coastal Cleaners ERIC_5272 DC021A

SUBTASK 4: CCR

DATE: 10/16/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Review construction drawings, data 4.0 sign & seal CCR 1.0

Total Hours: 5.0

Project Engineer, J Newell Prepare CCR 20.0 Input data into tables 4.0 Develop construction drawings 6.0 Develop photo logs 1.0

Total Hours: 31.0

GIS / CADD Specialist, D Grove Update drawings 6.0

Administrative Assistance, B Meynardie Compile report into pdf 2.0

TOTAL LABOR 44.0

Page 6 CO-1 Coastal Cleaners ERIC_5272 DC021A

SUBTASK 5: Utilities

DATE: 10/16/2023

SUBCONTRACTOR COSTS

NAME PURPOSE COST

(Electric - Duke Energy)Electric $850.00 Month 1 $850.00 Setup Utility connection / hook up fee $225.00 one time 1 $225.00

Sensophone - AT&T cellular subscription $299.00 1 $299.00 Setup Utility Connection/hook up fee $225.00 one time 1 $225.00

$1,149.00

Handling fee Electric $20.00 Month 1 $20.00

Handling fee Monthly Invoice fee ($20/month) $20.00 Month 1 $20.00

$490.00

TOTAL $1,639.00

Total Utility

Page 7 CO-1 Coastal Cleaners ERIC_5272 DC021A

SUBTASK 6: 1 Month O&M

DATE: 10/16/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Provide oversight and technical support 1.0 System evaluation/optimization 2.0

Total Hours: 3.0 Week 1 Visit Remediation Specialist, R Hanson Field event preparation 1.0

Travel (roundtrip) 3.0 Conduct O&M, optimize performance 2.0 Collect vacuum influence / vacuum flow measurements 1.0 Collect vapor samples for PID screening 1.0 Pick-up / Drop-off lab samples 2.0

Project Engineer, J Newell Telemetry check (3 times per week) 3.0 Monthly preparation, recording of system data to ongoing operational tables 3.0

Total Hours: 6.0

Month 1 Visit Remediation Specialist, R Hanson Field event preparation 1.0

Travel (roundtrip) 3.0 Conduct O&M, optimize performance 2.0 O&M checklists (1 hr/month) 1.0 Collect vacuum influence / vacuum flow measurements 1.0 Collect vapor samples for PID screening 1.0 Pick-up / Drop-off lab samples 2.0

Total Hours: 21.0

TOTAL LABOR 30.0

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 2 $720.00 Construction/O&M suppElectric $75.00 day 2 $150.00

$870.00 Expendables $40.00 day 2 $80.00

TOTAL EQUIPMEN $950.00

VEHICLE STAFF RATE UNIT USAGE

Equipment Van / Truck $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USAGE

$0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (influent and effluent, week 1 & month 1) $200.00 4 0 $800.00 Summa Cannisters $33.00 4 $132.00

$932.00

TOTAL LAB $932.00

Page 8 CO-1 Coastal Cleaners ERIC_5272 DC021A

SUBTASK 7: Reconcile WCD-1, Carbon

DATE: 10/16/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Provide oversight and technical support , new carbon, reconfigure manifold 1.0

Total Hours: 1.0

TOTAL LABOR 1.0

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMEN $0.00

VEHICLE STAFF RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

$0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

WD Environmental 7,800.00$ 7,800.00$

TOTAL $7,800.00

install new carbon, reconfigure manifold

Page 9 CO-1 Coastal Cleaners ERIC_5272 DC021A

Task #: DC021A SUBTASK 1: Project Management SUBTASK 6: 1 Month O&M

Site: Coastal Cleaners ERIC_52 SUBTASK 2: System Installation SUBTASK 7: Reconcile WCD-1, Carbon

Activity/Phase: SUBTASK 3: Start-up SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: CCR SUBTASK 9:

SUBTASK 5: Utilities SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$56.99 Project Manager 0 0.1 $64.90 Principal Consultant, DC 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $40.87 Project Engineer, MK 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $56.99 Senior Geologist, NW 1 0.0 0.0 0.0 0.0 0 1 0 0 0 $60.00 Senior Engineer, MR 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $56.50 Certified Hazardous Materials Manager 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $57.69 Senior Geologist, MR 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $43.27 Project Engineer, JN 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $37.00 Project Geologist, SAM 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.77 Project Scientist, RF 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $33.74 Project Scientist, SB 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $25.00 Staff Scientist, QH 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.86 GIS Specialist, DG 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $24.04 Staff Scientist, OG 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $28.85 Staff Scientist, RP 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $31.51 Remediation Coordinator, RH 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $30.91 Environmental Specialist, CC 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $22.06 Environmental Specialis, MZ 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $21.26 Environmental Specialist,DK 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $20.81 Administrative Assistant, BM 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $15.50 Secretary 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $15.00 Senior Laborer 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $12.00 Laborer 0 0.0 0.0 0.0 0.0 0 0 0 0 0

Total Hours 1.1 0.1 0.0 0.0 0.0 0.0 0 1 0 0 0

Professional Service Industries, Inc.

Direct Labor $64.40 $7.41 $0.00 $0.00 $0.00 $0.00 $0.00 $56.99 $0.00 $0.00 $0.00

Overhead 151.02% $97.26 $11.19 $0.00 $0.00 $0.00 $0.00 $0.00 $86.07 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (PSI) $161.66 $18.60 $0.00 $0.00 $0.00 $0.00 $0.00 $143.06 $0.00 $0.00 $0.00

Other Direct Costs $3.22 $0.37 $0.00 $0.00 $0.00 $0.00 $0.00 $2.85 $0.00 $0.00 $0.00 Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Task #: DC021A SUBTASK 1: Project Management SUBTASK 6: 1 Month O&M

Site: Coastal Cleaners ERIC_52 SUBTASK 2: System Installation SUBTASK 7: Reconcile WCD-1, Carbon

Activity/Phase: SUBTASK 3: Start-up SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: CCR SUBTASK 9:

SUBTASK 5: Utilities SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10

SVE Install, Startup, CCR & O&M

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying / GPR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 WD Environmental $7,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7,800.00 $0.00 $0.00 $0.00 Duke Energy $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $7,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7,800.00 $0.00 $0.00 $0.00 Handling Fee $780.00 $0.00 $0.00 $0.00 $0.00 $0.00 $780.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $8,580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $8,580.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $8,744.88 $18.97 $0.00 $0.00 $0.00 $0.00 $0.00 $8,725.91 $0.00 $0.00 $0.00 Completion Fee $16.17 $1.86 $0.00 $0.00 $0.00 $0.00 $0.00 $14.31 $0.00 $0.00 $0.00

Total Estimated Cost $8,761.05 $20.83 $0.00 $0.00 $0.00 $0.00 $0.00 $8,740.22 $0.00 $0.00 $0.00

SUBTASK 7: Reconcile WCD-1, Carbon

DATE: 10/16/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Provide oversight and technical support , new carbon, reconfigure manifold 1.0

Total Hours: 1.0

TOTAL LABOR 1.0

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMEN $0.00

VEHICLE STAFF RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

$0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

WD Environmental 7,800.00$ 7,800.00$

TOTAL $7,800.00

install new carbon, reconfigure manifold

Page 3 Delta Coastal Cleaners ERIC_5272 DC021A

Date: /20/2023 Revised 3/14/2023

Task #: SUBTASK 1: Project Management SUBTASK 6: 1 Month O&M

Site: Coastal Cleaners ERIC_52 SUBTASK 2: System Installation SUBTASK 7:

Activity/Phase: SUBTASK 3: Start-up SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: CCR SUBTASK 9:

SUBTASK 5: Utilities SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$56.99 Project Manager 35 35.0 $64.90 Principal Consultant, DC 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $40.87 Project Engineer, MK 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $56.99 Senior Geologist, NW 8 8.0 0.0 0.0 0.0 0 0 0 0 0 $60.00 Senior Engineer, MR 13 0.0 5.0 5.0 0.0 3 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $56.50 Certified Hazardous Materials Manager 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $57.69 Senior Geologist, MR 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $43.27 Project Engineer, JN 97 46.0 14.0 31.0 0.0 6 0 0 0 0 $37.00 Project Geologist, SAM 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.77 Project Scientist, RF 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $33.74 Project Scientist, SB 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $25.00 Staff Scientist, QH 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.86 GIS Specialist, DG 6 0.0 0.0 6.0 0.0 0 0 0 0 0 $24.04 Staff Scientist, OG 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $28.85 Staff Scientist, RP 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $31.51 Remediation Coordinator, RH 301 261.5 18.0 0.0 0.0 21 0 0 0 0 $30.91 Environmental Specialist, CC 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $22.06 Environmental Specialis, MZ 10 10.0 0.0 0.0 0.0 0 0 0 0 0 $21.26 Environmental Specialist,DK 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $20.81 Administrative Assistant, BM 2 0.0 0.0 2.0 0.0 0 0 0 0 0 $15.50 Secretary 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $15.00 Senior Laborer 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $12.00 Laborer 0 0.0 0.0 0.0 0.0 0 0 0 0 0

Total Hours 471.5 35.0 325.5 37.0 44.0 0.0 30 0 0 0 0

Professional Service Industries, Inc.

Direct Labor $17,337.87 $1,994.62 $10,906.81 $1,472.96 $1,862.15 $0.00 $1,101.33 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $26,183.65 $3,012.28 $16,471.46 $2,224.46 $2,812.22 $0.00 $1,663.23 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (PSI) $43,521.52 $5,006.90 $27,378.27 $3,697.42 $4,674.37 $0.00 $2,764.56 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $866.90 $99.73 $545.34 $73.65 $93.11 $0.00 $55.07 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental $3,600.00 $2,880.00 $480.00 $0.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $3,600.00 $2,880.00 $480.00 $0.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00

Date: /20/2023 Revised 3/14/2023

Task #: SUBTASK 1: Project Management SUBTASK 6: 1 Month O&M

Site: Coastal Cleaners ERIC_52 SUBTASK 2: System Installation SUBTASK 7:

Activity/Phase: SUBTASK 3: Start-up SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: CCR SUBTASK 9:

SUBTASK 5: Utilities SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10

SVE Install, Startup, CCR & O&M

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying / GPR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $1,149.00 $0.00 $0.00 $0.00 $1,149.00 $0.00 $0.00 $0.00 $0.00 $0.00 WD Environmental $107,625.00 $107,625.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Duke Energy $1,005.29 $1,005.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $110,529.29 $109,380.29 $0.00 $0.00 $1,149.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $9,546.78 $9,056.78 $0.00 $0.00 $490.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $120,076.07 $118,437.07 $0.00 $0.00 $1,639.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $3,211.00 $881.00 $1,398.00 $0.00 $0.00 $932.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,211.00 $881.00 $1,398.00 $0.00 $0.00 $932.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $1,000.00 $840.00 $80.00 $0.00 $0.00 $80.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $500.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $3,090.00 $1,350.00 $870.00 $0.00 $0.00 $870.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $4,590.00 $2,690.00 $950.00 $0.00 $0.00 $950.00 $0.00 $0.00 $0.00 $0.00

Subtotal $175,865.49 $5,106.63 $152,811.68 $6,599.07 $4,767.48 $1,639.00 $4,941.63 $0.00 $0.00 $0.00 $0.00 Completion Fee $4,352.16 $500.69 $2,737.83 $369.74 $467.44 $0.00 $276.46 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $180,217.65 $5,607.32 $155,549.51 $6,968.81 $5,234.92 $1,639.00 $5,218.09 $0.00 $0.00 $0.00 $0.00

Site Name: Site ID #:

Contract #: Contractor:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

WCP WCD 07-2018

Authorized Contractor Signature:

Authorized FDEP Signature:

WORK CHANGE DIRECTIVE FORM

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Coastal Cleaners ERIC_5272

HW686 Professional Service industries, Inc. (Intertek-PSI)

DC021A 1

Approved ISR requires carbon vessel, additional manifold box to secure valves to prevent unauthorized entry.

New GAC vessel, transport to site, additional labor and materials to build manifold box which was modified slightly to fit tenant needs. Location of manifold will need to be secured.

Carbon - $2800 Labor - $4000 Materials, equipment, travel - $2000

$ 8,800.00

Nana G Westmark Digitally signed by Nana G Westmark Date: 2023.06.12 11:16:37 -04'00'

Kelly Crain Digitally signed by Kelly Crain Date: 2023.06.12 12:01:33 -04'00'

Kelly Crain Digitally signed by Kelly Crain Date: 2023.06.12 12:01:43 -04'00'

WD Environmental Services Inc.

1013 BRIARWOOD DRIVE

WAUCHULA, FL 33873

(863-781-6971 wdenviro@gmail.com

Invoice

BILL TO

INTERTEK

PSI/Intertek 5801 Benjamin Center Drive Suite 112 Tampa FL 33634

INVOICE # DATE TOTAL DUE DUE DATE TERMS ENCLOSED

083754 A 06/28/2023 $7,800.00 07/28/2023 Net 30

DESCRIPTION QTY RATE AMOUNT

Project Location

Coastal Cleaners Dunedin FL

Change Order

Change Order Supply and Install Carbon Filters and cover for manifold on building

1 7,800.00 7,800.00

BALANCE DUE $7,800.00

From: Nana Westmark To: Crain, Kelly Subject: RE: WCD Reconciliation Date: Monday, October 16, 2023 10:28:16 AM Attachments: Coastal Cleaners ERIC_5272 DC021A.xlsx

Delta Coastal Cleaners ERIC_5272 DC021A.xlsx CO-1 Coastal Cleaners ERIC_5272 DC021A.xlsx 05523721 Invoice_083754_A_from_WD_Environmental_Services_Inc.pdf

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good Morning – Please see attached documentation for reconciling Coastal Cleaners. WCD-1 was for adding new carbon and reconfiguring the manifold. See attached subcontractor documentation and our original TA, Delta, and the CO-1.

Also we would like to request a 60 day time extension. We are doing the start-up this week so we are running a little behind (getting the power was an issue).

Please contact me with any questions.

Nana

From: Crain, Kelly <Kelly.Crain@dep.state.fl.us> Sent: Thursday, October 12, 2023 3:02 PM To: Nana Westmark <nana.westmark@intertek.com> Subject: [External] FW: WCD Reconciliation Importance: High

Hi Nana- can you send me a TACO for Coastal Cleaners to reconcile WCD 1? I think we also need to reconcile the Critical Response WCD. Thanks!

From: Grubbs, Benjamin <Benjamin.Grubbs@FloridaDEP.gov> Sent: Thursday, October 12, 2023 2:41 PM To: Cohen, Aaron <Aaron.Cohen@FloridaDEP.gov>; Crain, Kelly <Kelly.Crain@dep.state.fl.us> Subject: WCD Reconciliation Importance: High

Aaron and Kelly, Please have APTIM and PSI reconcile the following WCDs ASAP.

Contract # Cont ID Site Name TA #

WCD

# Amount

Issuance Date

HW689

APTIM

(689) 60-Minute Cleaners DC012B 1 $3,520.00 5/19/2023

HW686 PSI (686) Coastal Cleaners DC021A 1 $8,800.00 6/12/2023

HW689

APTIM

(689) Crystal Cleaners DC017B 1 $385.00 8/10/2023

Thanks, Ben mailto:nana.westmark@intertek.com mailto:Kelly.Crain@dep.state.fl.us mailto:Benjamin.Grubbs@FloridaDEP.gov mailto:Aaron.Cohen@FloridaDEP.gov mailto:Kelly.Crain@dep.state.fl.us

Cost Estimate

Contractor: Professional Service Industries, Inc.

Date: 1/20/2023 Revised 3/14/2023

Task #: SUBTASK 1: Project Management SUBTASK 6: 1 Month O&M

Site: Coastal Cleaners ERIC_5272 SUBTASK 2: System Installation SUBTASK 7:

Activity/Phase: SVE Install, Startup, CCR & O&M SUBTASK 3: Start-up SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: CCR SUBTASK 9:

SUBTASK 5: Utilities SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

Professional Service Industries, Inc.

$56.99 Project Manager 35 35.0

$64.90 Principal Consultant, DC 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$40.87 Project Engineer, MK 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$56.99 Senior Geologist, NW 8 8.0 0.0 0.0 0.0 0 0 0 0 0

$60.00 Senior Engineer, MR 13 0.0 5.0 5.0 0.0 3 0 0 0 0

$34.62 Certified Industrial Hygientist 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$56.50 Certified Hazardous Materials Manager 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$57.69 Senior Geologist, MR 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$48.08 Project Manager 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$43.27 Project Engineer, JN 97 46.0 14.0 31.0 0.0 6 0 0 0 0

$37.00 Project Geologist, SAM 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$29.77 Project Scientist, RF 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$33.74 Project Scientist, SB 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$25.00 Staff Scientist, QH 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Professional Land Surveyor 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Chemist 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$29.86 GIS Specialist, DG 6 0.0 0.0 6.0 0.0 0 0 0 0 0

$24.04 Staff Scientist, OG 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$28.85 Staff Scientist, RP 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$31.51 Remediation Coordinator, RH 301 261.5 18.0 0.0 0.0 21 0 0 0 0

$30.91 Environmental Specialist, CC 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$22.06 Environmental Specialis, MZ 10 10.0 0.0 0.0 0.0 0 0 0 0 0

$21.26 Environmental Specialist,DK 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$20.81 Administrative Assistant, BM 2 0.0 0.0 2.0 0.0 0 0 0 0 0

$15.50 Secretary 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$15.00 Senior Laborer 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$12.00 Laborer 0 0.0 0.0 0.0 0.0 0 0 0 0 0

Chastain-Skillman, Inc.

$0.00 Project Manager 0 0.0

$0.00 Principal 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Electric 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Department Head 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Sr. Consultant 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Sr. Project Manager 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Sr. Project Engineer (Registered) 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Project Engineer 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Engineering Intern 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Project/Designer 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Project Coordinator 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Engineer Aide 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Sr. Hydrogeologist/Env. Scientist 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Hydrogeologist/Env. Scientist III 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Hydrogeologist/Env. Scientist II 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Hydrogeologist/Env. Scientist I 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Sr. Industrial Hygienist (Registered) 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Industrial Hygienist II 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Industrial Hygienist I 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Land Surveyor & Mapper (Registered) 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Survey Supervisor 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 1 man Survey Crew 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 2 man Survey Crew 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 3 man Survey Crew 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 1 man Survey Crew w/ GPS 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 2 man Survey Crew w/ GPS 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 3 man Survey Crew w/ GPS 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 GIS Specialist/Programmer 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Sr. Draftsman 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Draftsman 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Sr. Construction Representative 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Construction Project Representative 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Secretary 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Staff - Clerical 0 0.0 0.0 0.0 0.0 0 0 0 0 0

Total Hours 471.5 35.0 325.5 37.0 44.0 0.0 30 0 0 0 0

Professional Service Industries, Inc.

Direct Labor $17,337.87 $1,994.62 $10,906.81 $1,472.96 $1,862.15 $0.00 $1,101.33 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $26,183.65 $3,012.28 $16,471.46 $2,224.46 $2,812.22 $0.00 $1,663.23 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sub-Total Labor (PSI) $43,521.52 $5,006.90 $27,378.27 $3,697.42 $4,674.37 $0.00 $2,764.56 $0.00 $0.00 $0.00 $0.00

Chastain-Skillman, Inc.

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 117.20% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 54.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sub-Total Labor (CSI) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $43,521.52 $5,006.90 $27,378.27 $3,697.42 $4,674.37 $0.00 $2,764.56 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $866.90 $99.73 $545.34 $73.65 $93.11 $0.00 $55.07 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $3,600.00 $2,880.00 $480.00 $0.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $3,600.00 $2,880.00 $480.00 $0.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying / GPR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $1,149.00 $0.00 $0.00 $0.00 $1,149.00 $0.00 $0.00 $0.00 $0.00 $0.00

WD Environmental $107,625.00 $107,625.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Duke Energy $1,005.29 $1,005.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $110,529.29 $109,380.29 $0.00 $0.00 $1,149.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $9,546.78 $9,056.78 $0.00 $0.00 $490.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $120,076.07 $118,437.07 $0.00 $0.00 $1,639.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $3,211.00 $881.00 $1,398.00 $0.00 $0.00 $932.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $3,211.00 $881.00 $1,398.00 $0.00 $0.00 $932.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $1,000.00 $840.00 $80.00 $0.00 $0.00 $80.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $500.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $3,090.00 $1,350.00 $870.00 $0.00 $0.00 $870.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $4,590.00 $2,690.00 $950.00 $0.00 $0.00 $950.00 $0.00 $0.00 $0.00 $0.00

Subtotal $175,865.49 $5,106.63 $152,811.68 $6,599.07 $4,767.48 $1,639.00 $4,941.63 $0.00 $0.00 $0.00 $0.00

Completion Fee $4,352.16 $500.69 $2,737.83 $369.74 $467.44 $0.00 $276.46 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $180,217.65 $5,607.32 $155,549.51 $6,968.81 $5,234.92 $1,639.00 $5,218.09 $0.00 $0.00 $0.00 $0.00

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Arial,Regular"&8REV: 02/03 &"Arial,Regular"&8CEF_PSI.XLS &"Arial,Regular"&8Page &P

Formula Sheet

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

PSI Labor Costs $1,994.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$455.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $300.00 $300.00 $0.00 $180.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$1,990.42 $605.78 $1,341.37 $0.00 $259.62 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $179.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$8,239.87 $567.18 $0.00 $0.00 $661.71 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$220.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $41.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Chastain-Skillman Labor Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars -PSI $1,994.65 $10,906.81 $1,472.96 $1,862.15 $0.00 $1,101.33 $0.00 $0.00 $0.00 $0.00 total labor dollars - Chastain $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Project Management -PSI $15,343.25 = sum of Direct Labor Costs from Subtasks 2 through 10

$1,994.62 =13% of Direct Labor Costs (Project Management)

34.999 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)

Project Management - Chastain $0.00 = sum of Direct Labor Costs from Subtasks 2 through 10

$0.00 =13% of Direct Labor Costs (Project Management)

0.000 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Service Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $75.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $8,881.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $100.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .