This is a Task Assignment (TA) document under Contract HW686 between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (PSI), an Intertek company. The Task Assignment is identified as DC011C and covers remedial system decommissioning services at the Coin-O-Magic site located at 11605 North 15th Street, Tampa, Hillsborough County, Florida. The project is managed by Nicole Knutson for FDEP and Joshua Newell for PSI, with a completion date of November 29, 2024.
PSI will decommission the remedial system at the Coin-O-Magic site through the removal and transport of the soil vapor extraction (SVE) remedial system and power pole to the FDEP equipment yard in Lakeland, Florida; abandonment of eight monitoring wells and four vapor extraction wells in compliance with Florida Administrative Code Chapter 62-532; removal and disposal of contaminated activated carbon from the system; and submittal of a summary letter report detailing all decommissioning activities, site repairs, and photographic documentation. The total Task Assignment value is $27,051.44 on a fixed unit rate basis, with invoicing contingent upon FDEP approval of the Letter Report and project management by September 20, 2024. The cost estimate breaks down as follows: Project Management ($1,662.95), Removal/Transport of Remedial System Components and Disposal ($14,531.80), Abandonment of Conduits and Wells ($5,933.35), and Summary of Activities Report ($4,923.34).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW686
DC011C Completion November 29, 2024
PSI will decommission the remedial system at the Coin-O-Magic site, as detailed in the June 20, 2024 proposal. Activities include removal of the remedial system and power pole, as well as abandonment of remedial conduits, monitoring wells, and vapor extraction wells.
Nicole Knutson 850-245-8763 Contractor Professional Service Industries, Inc. (PSI) Contractor
Contractor Joshua Newell Contractor 863 712 4342
ERIC_4690
11605 North 15th Street Tampa, Hillsborough County
Coin-O-Magic
Contractor Contractor
✔ $ 27,051.44
$ 27,051.44
Scope of Work
Professional Service Industries, Inc. (PSI) Contractor
Digitally signed by Joshua S Newell Date: 2024.06.25 13:46:12-04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.06.25 12:48:01 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1-4: Letter Report to include description of SVE system decommission activities, building or site repairs, disposal documentation, required permits, field documentation, and photo-documentation of site activities & PM
09/20/2024
FDEP Approval of Letter Report & PM - Subtasks 1-4 $ 27,051.44
$ 27,051.44
HW686
DC011C
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawnn Hamilton Secretary
Memorandum
TO: ERIC_4690
Coin-O-Magic
FROM: Nicole Knutson, Project Manager
SUBJECT: Negotiation Summary
HW686 DC011C
DATE: June 21, 2024
PSI will decommission the remedial system at the Coin-O-Magic site, as detailed in the June 20, 2024 proposal. Activities include removal of the remedial system and power pole, as well as abandonment of remedial conduits, monitoring wells, and vapor extraction wells.
Total task amount is $27,051.44. PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is September 20, 2024. Task completion date is November 29, 2024.
PSI Proposal Number: 0552-427217 June 20, 2024
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916 www.intertek.com/building
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400
Attention: Mr. Benjamin Grubbs, FCCM Contract Manager Environmental Consultant Email: benjamin.grubbs@floridadep.gov
Re: Proposal for Remediation System Decommission – Rev 1 Coin-O-Magic 11605 North 15th Street Tampa, Hillsborough County, Florida 33612 Facility ID No. 299500268, ERIC_4690
Dear Mr. Grubbs, Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to decommission services for the above referenced site. Included with this proposal is a brief discussion of project history to date, proposed scope of work, cost estimate and a proposed schedule for completion.
PROJECT BACKGROUND
Historical records indicate that this facility utilized perchloroethene (PCE) drycleaning from 1986 through 1994 at which time the drycleaning business was converted to a dry-drop-off and coin-operated laundromat. A Site Screening Investigation completed in August 1996 identified PCE impacts to soil ranging from 46 μg/kg to 83 μg/kg. Based on the Drycleaning Solvent Cleanup Program (DSCP) Application/Site Screening Report for Coin-O-Magic Laundromat in October 1996, the site was determined to be eligible for state-funded cleanup under the DSCP Program with a score of 96.
A Site Access Agreement between the property owner and the FDEP (and its contractors) was signed July 31, 2017. As of January 2017, no large Public Supply Wells have been identified within
FDEP – Coin O-Magic, Decommission
June 20, 2024 www.intertek.com/building
½ mile of the site, whereas one small potable private well is located within ¼ mile of the site. The private potable well provides water for the Hackworth Duplex located at 11720 North 15th Street, which is about 1,100 feet northwest of the Site.
A site assessment was conducted for the Drycleaning Solvent Cleanup Program beginning in May 2018, which consisted of a modified active gas survey (MAGS), a groundwater sampling event, soil screening, and a Site Assessment Report (SAR) was submitted on April 3, 2019. Results indicate that PCE concentrations were not detected above the soil cleanup target levels (SCTL’s). Air samples collected from MAGS test points revealed 4.3 mg/m3 PCE at VE001 and 3.7 mg/m3 PCE at VE003. Groundwater assessment showed low levels of VOH’s present in the saturated zone, however, none were detected above the groundwater cleanup target levels (GCTL’s). The highest dry cleaning contaminant of concern detected from that event was 1.2 μg/L of PCE at DP002 (21- 25 ft bls).
The site assessment results collected from inside and adjacent to the former drycleaner building suggested that a limited mass of residual PCE was present in the area around the former location of the dry-cleaning machine or the active lint trap system. Recommendations at that time included performing soil vapor extraction for vadose zone remediation.
The Interim Source Removal Plan for an SVE System installation was approved by the FDEP on April 22, 2020. The construction activities included; transfer and placement of the SVE trailer, replacement and retrofitting of the SVE wells, construction of the SVE conveyance piping, and electrical connections within the system compound, were completed from May 2021 to August 2021. The electrical service connection with Tampa Electric Company (TECO), including additional modifications to the temporary power pole, were completed in October 2021. The additional repairs to the trailer ventilation and control panel were also completed in January 2022. A Department-owned SVE remediation system trailer (property number 12809) was transferred to the site and was set-up at the northeast corner of the building.
The remediation equipment includes a 7.5 horsepower Amtek Rotron EN808 regenerative vacuum blower, a five-leg inlet manifold (three in use for this project), an 80- gallon aluminum vapor/liquid separator, a ½ horsepower liquid transfer pump, a 110- gallon closed top polytank, and an EOS Pro-2 PLC with cellular modem.
The SVE system operated from January 2022 to May 2023. A system shutdown evaluation was conducted from February 2023 to March 2023. Based on the results from the shutdown evaluation, FDEP recommended ceasing operation of the SVE system. The system electric service ended on May, 24, 2023 and the unit has been off since that time.
June 20, 2024 www.intertek.com/building
PROPOSED SCOPE OF WORK
The proposal contained herein consists of project management, removal and transport of the remedial system, waste analysis and disposal, removal of existing power pole, abandonment of all remedial conduits; abandonment of eight (8) monitoring wells and four (4) vapor extraction wells; and submittal of a summary letter report.
1. Project Management
This scope is provided for in the template worksheets.
2. Removal and Transport of Remedial System, Waste Analysis and Disposal, Power Pole Removal, and Abandonment of Remedial Conduits
The remedial system equipment trailer and associated components will be disassembled and transported to the FDEP equipment yard in Lakeland, Florida. All accompanying attachments, fittings, and essential components will be securely housed within the equipment trailer for safe transport. All anchor points and other supporting infrastructure will be removed or cut-below-grade. The remedial system equipment trailer is not currently street-ready and will need to be transported on a flatbed trailer or equivalent.
This remedial system does have a carbon vessel that contains activated carbon on site. A sample of the used carbon will be collected and submitted for laboratory analysis by EPA Method 8260 for halocarbons and non-halogenated VOCs. Following waste characterization and profile, the carbon will be transported and disposed of at an FDEP-approved facility.
Any SVE conduit lines running along the building interior/exterior (walls and ceilings) will be removed with their brackets/supports and any resulting penetrations will be repaired.
All building access penetrations related to the conduits will be patched/filled as well.
The existing power pole will be removed with electrical components once de-energized by the utility. A SVE well trench is present at the site and will be cut below grade, filled with flowable fill, then capped and patched at grade. Quotes for subcontractor disposal, system removal, and transport/disposal are attached.
3. Abandonment of Monitoring Wells and Vapor Extraction Wells
The proposed abandonment of monitoring wells on the site will include MW001, MW002, MW003, MW004, MW005, MW006, MW007, MW008 and vapor extraction wells VE001, VE002, VE003, and VE004. The abandonment will adhere to the regulatory standards outlined in Chapter 62-532 of the Florida Administrative Code (F.A.C.), ensuring compliance with FDEP guidelines for abandonment procedures. This will include applying
June 20, 2024 www.intertek.com/building for relevant well abandonment permits for groundwater wells only. Bids for licensed subcontractor drill services to complete the abandonment are attached.
4. Summary of Activities Report
A brief letter report will be developed which will describe the SVE system decommission activities, building or site repairs, disposal documentation, required permits, and include completed field documentation, as well as photo-documentation of site activities.
COST ESTIMATE AND SCHEDULE
The estimated cost of decommission is shown on the attached Cost Estimate.
Coin O Magic ERIC_4690 Proposal for Remediation System Decommission
Task Proposed Cost
Schedule / Deliverable
Subtask 1 Project Management $1,662.95 Upon task completion Subtask 2 Removal/Transport of
Remedial System Components and Disposal
$14,531.80 August 30, 2024
Subtask 3 Abandonment of Conduits, Monitoring Wells and Vapor Extraction Wells
$5,933.35 August 30, 2024
Subtask 4 Summary of Activities Report
$4,923.34 September 30, 2024 - Summary of Activities Report
Total Estimated Cost
$ 27,051.44 Period of Service End: November 29, 2024
June 20, 2024 www.intertek.com/building
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.
Respectfully submitted, Professional Service Industries, Inc.
John Daugherty Joshua S. Newell, PE Environmental Project Scientist Senior Engineer / Contract Manager
Enclosure: Cost Estimate Level of Effort
\\Tampa-fs\PROJECTS\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552-427217 Coin-O-Magic Well Abdmt & Site Rest\Proposal
Invoice Schedule
Requirements for Invoice Submittal Subtask 1, 2, and 3 Summary of Activities Report $ 27,301.44 Total: $ 27,301.44
FD
E
P C
O
ST
E
ST
IM
A
T E
C on tr ac to r:
P ro fe ss io na l S er vi ce In du st rie s, In c.
In te rt ek -P
S I)
D at e:
6/ 7/
T as k ub
T as k
P ro je ct
M an ag em en t
S ub
T as k
S ite
C oi n
O M ag ic
E R
IC
_4
T as k
LO
E
S Y
S T
E M
D E
C O
M M
IS
S
IO
N
S ub
T as k
A ct iv ity
/P ha se
O
M , R
A S
S , G
W
T as k
LO
E
W
E
LL
A B
A N
D O
N M
E N
T S ub T as k
P ro je ct
M an ag er
N an a
W es tm ar
T as k
LO
E
S
U M
M A
R Y
O F
A C
T
IV
IT
IE
S S ub T as k
S ub
T as k
S ub
T as k
TT
o ta ls
L ab o r
R at e C at eg o ry
$5 8.
P ro je ct M an ag er
.3
.3
$6 4.
P rin ci pa l C on su lta nt
$6 2.
S en io r E ng in ee r, G R
0.
$5
8.
S en io r
G eo lo gi st , N
W
0.
$4 8.
P ro je ct E ng in ee r, J N
0.
$4
0.
P ro je ct
S ci en tis t, JD
0.
$4 5.
P ro je ct E ng in ee r, M K
0.
$3
3.
P ro je ct
S ci en tis t, S
B
0.
$3 4.
G
IS
C A
D S pe ci al is t, D
G
0.
$2 4.
S ta ff
S ci en tis t, M
M
0.
$3 0.
E nv iro nm en ta l S pe ci al is t, C
C
0.
$2 0.
A dm in is tr at iv e A ss is ta nt
, B M
0.
T o ta l H o ur s
.3
0.
D ire ct L ab or
$5
,2
.9
$6
.2
$2 ,2
.9
$5
.7
$1
,7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
1.
$7
,9
.8
$9
.5
$3 ,4
.0
$8
.6
$2
,6
.7
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
F rin ge 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l L ab o r
$1 3, 0.
$1
,5
.7
$5 ,6
.0
$1
,4
.3
$4 ,4
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ra ve l
V eh ic le
R en ta l
$4
.0
$3
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
F ar e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al T ra ve l $4
.0
$3
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
PS
I- In te rt ek Pa ge
FD
E
P C
O
ST
E
ST
IM
A
T E
C on tr ac r:
ro fe ss io na l S er vi ce In du st rie s, In c.
In te rt ek -P
I) at e:
6/ 7/
T as
T as k
P ro je ct
M an ag em en t
S ub
T as k
S ite
C oi n
O M ag ic
E R
IC
_4
T as k
LO
E
S Y
S T
E M
D E
C O
M M
IS
S
IO
N
S ub
T as k
A ct iv ity
/P ha se
O
M , R
A S
S , G
T as k
LO
E
W
E
LL
A B
A N
D O
N M
E N
T S ub T as k
P ro je ct
M an ag er
N an a
W es tm ar
T as k
LO
E
S
U M
M A
R Y
O F
A C
T
IV
IT
IE
S S ub T as k
S ub
T as k
S ub
T as k
TT
o ta ls
SS
ub co nt ra ct o r
(E q ui p m en t P ro cu re m en t)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l S ub co nt ra ct o r C o st
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct o r
(S er vi ce s P ro cu re m en t) ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
N
E T
D ril lin g
$3 ,7
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
W
D E nv iro nm en ta l
$6 ,2
.0
$6
,2
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P et ro te ch S
E $1
.0
$1
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $1
0, 5.
$6 ,3
.0
$3
,7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
F ee
$1 ,0
.5
$6
.5
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l S ub co nt ra ct o r C o st
$1 1, 1.
$7
,0
.5
$4 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
L ab o ra ry
A na ly tic al
C os ts $5
.0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
F as t T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e S hi pp in g
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l L ab o ra to ry $5
.0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
F ie ld
E xp en se s er so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$1
.0
$1
.0
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al r el at ed
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W r el at ed
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$3
.0
$2
.0
$7
5.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l F ie ld E xp en se s
$4
.0
$3
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $2
5, 7.
$1 ,5
.7
$1
3, 4.
$5 ,7
.3
$4
,4
.7
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C o m p le ti o n
F ee
$1 ,3
.0
$1
.1
$5
.3
$1
.0
$4
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l E st im at e d
C o st $2
7, 1.
$1 ,6
.9
$1
4, 1.
$5 ,9
.3
$4
,9
.3
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
PS
I- In te rt ek Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Coin O Magic ERIC_4690 SubTask 2 LOE 2 SYSTEM DECOMMISSION
DATE: 6/7/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist, NW Coordinate field efforts with owner/tenant 1
Project Scientist, JD Load/unload 1 Travel (4 hr round trip) 12 Oversight of SVE system decommission 30 Total 43
Staff Scientist, MM IDW Sample Collection 8
Senior Engineer, GR Coordinate Utilities disconnect 4
TOTAL LABOR 56
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
$0.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
WD Environmental System decomission, transport, permitting, and site rehab $6,200.00 $6,200.00 Petrotech SE IDW (carbon) Disposal $165.00 $165.00
TOTAL $6,365.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TCLP Metals $130.00 1 $130.00 TCLP Volatile Organics by GC/MS $205.00 1 $130.00 $205.00 TCLP Semi-volatile organics by GC/MS $250.00 1 $250.00
TOTAL LAB $585.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M supplies $75.00 day 3 $225.00 $225.00
Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $345.00
Carbon Disposal Analysis
FINAL --7/24/96
SubTask 3 LOE 3 WELL ABANDONMENT
DATE: 6/7/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist, NW Coordinate field efforts with owner/tenant 1
Project Scientist, JD Load/unload 1 Travel (4 hr round trip) 4 Oversight of Well Abandonment 3 8
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
NET Drilling MW/SVE well abandonment $3,700.00 $3,700.00
TOTAL $3,700.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M supplies $75.00 day 1 $75.00 $75.00
Expendables $40.00 day 1 $40.00
TOTAL EQUIPMENT $115.00
SubTask 4 LOE 4 SUMMARY OF ACTIVITIES
DATE: 6/7/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, GR Review letter report 2
Project Engineer, JN Letter report generation 24 Fill out equipment transfer form(s) 2 Coordinate field efforts 2
Project Scientist, JD Gather report backup (well abandonment logs, disposal manifests, photos) 3 Develop photo log 2
GIS/CADD Specialist, DG Generate figures 2
Administrative Assistant, BM Compile documents 2
TOTAL LABOR 39
VEHICLE TYPE RATE UNIT USEAGE
$0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00
$0.00TOTAL EQUIPMENT
WD Environmental Services Inc.
1013 BRIARWOOD DRIVE
WAUCHULA, FL 33873
(863-781-6971 wdenviro@gmail.com
Estimate
ADDRESS
INTERTEK
PSI/Intertek 5801 Benjamin Center Drive Suite 112 Tampa FL 33634
ESTIMATE # DATE
1553 04/24/2024
ACTIVITY QTY RATE AMOUNT
Project Location:
Coin O Magic 11605 N 15th Street Tampa FL
WD to remove remediation trailer.
WD to remove and cap all pipes above grade.
WD to supply transport of trailer to Lakeland, FL.
Remove power poles.
1 6,200.00 6,200.00
Notes:
1. Power Company has to be disconnected from weatherhead.
TOTAL $6,200.00
Accepted By Accepted Date
This does not specify they will do anything with the compound fencing. Need verbal clarification that the fence will be removed and cut-to-grade.
- JTD 5-32-24
DATE: 04/12/24
CONTRACTOR NAME: Intertek-PSI
SITE NAME & LOCATION: Coin-O-Magic - Tampa
PROJECT NO:
PROPOSED SCOPE OF WORK:
Abandon: 2) .75" Wells 40' Total 5) 1" Wells 158' Total 4) 2" Wells 40' Total
Remove Pad/Manhole and patch
UNIT UNIT RATE QUANTITY EXT. PRICE
SOIL BORINGS
Rig & Labor LUM SUM $0.00 0.0 $0.00
50 FOOT TO 100 FOOT BORING DEPTH PER FOOT $0.00 0.0 $0.00
>100 FOOT BORING DEPTH PER FOOT $0.00 0.0 $0.00
WELL ABANDONMENT
ABANDONMENT - Rig & Labor LUMP SUM $2,988.00 1.0 $2,988.00
1" - 2" WELL ABANDONMENT PER FOOT $0.00 0.0 $0.00
3" - 4" WELL ABANDONMENT PER FOOT $0.00 0.0 $0.00
5" - 6" WELL ABANDONMENT PER FOOT $0.00 0.0 $0.00
1" - 2" WELL INSTALLATION
0 to 50 FOOT DEPTH PER FOOT $0.00 0.0 $0.00
50 FOOT TO 100 FOOT DEPTH PER FOOT $0.00 0.0 $0.00
>100 FOOT DEPTH PER FOOT $0.00 0.0 $0.00
4" WELL INSTALLATION
<50 FOOT DEPTH LUMP SUM $0.00 0.0 $0.00
50 FOOT TO 100 FOOT DEPTH PER FOOT $0.00 0.0 $0.00
>100 FOOT DEPTH PER FOOT $0.00 0.0 $0.00
DOUBLE CASED WELLS
6" SURFACE CASING PER FOOT $0.00 0.0 $0.00
8" SURFACE CASING PER FOOT $0.00 0.0 $0.00
WELL COMPLETION PER WELL $0.00 0.0 $0.00
WELL PAD REMOVAL AND PATCH EACH $23.00 11.0 $253.00
MOBILIZATION ROUNDTRIP $400.00 1.0 $400.00
PER DIEM PER CREW $380.00 0.0 $0.00
DRUMS EACH $68.90 0.0 $0.00
PERMITS EACH $50.00 1.0 $50.00
GROUT FOR BOREHOLE ABANDONMENT EACH $27.00 3.0 $81.00
DECONTAMINATION PER WELL $0.00 0.0 $0.00
DEVELOPMENT PER WELL $0.00 0.0 $0.00
OTHER PER FOOT $0.00 0.0 $0.00
TOTAL ALL WELLS $3,772.00
DAYS TO COMPLETE SCOPE OF WORK: 1 Day
INVOICE SETTLEMENT IS NET 60 DAYS
100 KID ELLIS ROAD, MULBERRY, FL 33860
(863) 425-9600 FAX: (863) 425-9620 TOLL FREE: 800-532-5008
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
Date: 4/15/24 FAC ID#: ERIC_4690
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary_____
HSA Drilling & Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
4" Well Installation (includes screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Double Cased Well $0.00
6" Surface Casing per foot $0.00 per well $0.00
3/4"- 2" Well Abandonment (includes grouting) per foot $11.00 238 $2,618.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $100.00 11 $1,100.00
Mobilization roundtrip $550.00 1 $550.00
Per Diem per crew / per night $0.00 DOT Approved 55-gal Drum each $0.00 each $25.00 3 $75.00
$0.00
$0.00
$0.00 Standby/Delay/Difficult Access Time per hour $0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00
TOTAL QUOTE PRICE $4,343.00
Project No.:
Signature and Title of Person Submitting Quote: _________________________________ Austin Bonacum, Estimator Date: 4/15/24
Consultant Name: Intertek-PSI
Site Name & Location: Coin-O-Magic Cleaners
PROPOSED SCOPE OF WORK:
Abandon (8) 3/4" - 2" MW's, total depth: 208', remove pads and manholes, restore grade
Abandon (3) 2" x 10' VE wells, total depth: 30', remove pads and manholes, restore grade
Days to Complete Scope of Work: 1
11605 N 15th Street, Tampa, Hillsborough County, FL
Well Completion (includes MH w/ cover, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Permits
Intertek-PSI, Coin-O-Magic Cleaners, Tampa, FL (abandonment)
04/24/2024 01:44 PM PAGE 1 OF 7
Scope of Work pricing is based on an approved non hazardous facility in to Enviroserve Mulberry
4600 BROOKPARK ROAD, CLEVELAND,
OHIO, 44134
(216) 642-1311
(216) 642-1474
QUOTE #: 0042802
DATE: 04/24/2024 PROJECT PROPOSAL
CLIENT
JOSH NEWELL
INTERTEK/PSI - PLANT CITY
607 SOUTH ALEXANDER ST, SUITE 202, PLANT CITY, FLORIDA,
33563 P: (863) 712-4342
E-MAIL:JOSHUA.NEWELL@INTERTEK.COM
PROJECT DESCRIPTION
FDEP DRY CLEANING DRUMS
FDEP
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANSPORTATION - LTL DRUM (6 - 55 GAL) - 251-400 MILES 1.00 $50.00 DRUM $50.00
LOW STOP FEE (LESS THAN 6 DRUMS) 1.00 $50.00 55 GAL DRUM $50.00
ENERGY SURCHARGE (APPLIES TO TOTAL INVOICE) - $15.00 % -
TRANSPORTATION SUBTOTAL: $100.00
DISPOSAL
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
55 GAL DRUM / SOLID 1.00 $80.00 EACH $80.00
DISPOSAL SUBTOTAL: $80.00
JOB ESTIMATE: $180.00
ENVIRONMENTAL FEE: $9.00
TOTAL JOB ESTIMATE: $189.00
Disposal of (1) Carbon Drum = $189.00 As Shown
High Bid - Contractor not selected
PS
I -
In te rt ek
R eq ue st fo r A nn ua l I nv es tig at iv e D er iv ed W as te
(I D
W ) I
D W
P ic k-up
, t ra ns po rt , D is po sa l a nd T re at m en t
PR
O
JE
C
T B
ID
T
AB
U
LA
TI
O N
S
ID
Fa ci lit y
N am e Va rio us
D ry cl ea ni ng
S ite s un de r F
D
EP
D ry cl ea ni ng
S ol ve nt
C le an up
P ro gr am in F lo rid a Fa ci lit y Lo ca tio n Va rio us
Fa ci lit y
ID
Va rio us
D es cr ip tio n of S er vi ce
Ta m pa A re a
O rla nd o
- C en tr al
Fl id a Ja ck so nv ill e Ar ea
N or th F lo rid a
So ut h Fl or id a (M ia m i, Fo rt
M ye rs , N ap le
s) Fl or id a Pa nh an dl e w at er $1
.0
$1
.0
N
/A N
/A N
/A so il $1
.0
$1
.0
N
/A N
/A N
/A lo w v ol um e fe e N
/A N
/A N
/A Pi ck -u p fe e $0
.0
$0 .0
N
/A N
/A N
/A
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
1.
P le as e in cl ud e al l c os ts fo r p ic k-up , t ra ns po rt
, f ue l c os ts , s to pp ag e fe e, d is po sa l, ba se d on p er d ru m c os t.
2.
PS
I i s ne ith er th e ge ne ra to r n or tr an sp or te r f or h az ar do us o r n on -h az ar do us w as te
5.
W as te is c on si de re d no t h az ar do us
6.
An al yt ic al re su lts o f w as te w ill b e pr ov id ed b y a N
EL
AP
-a pp ro ve d la bo ra to ry
7.
A
PS
I P ur ch as e
O rd er re fe re nc in g Te rm s
C on di tio ns
(a tta ch ed
) w ill b e is su ed a nd m us t b e si gn ed p rio r t o pi ck
-u p.
es cr ip tio n
-G al lo n D ru m
P ic k-up
Tr an sp or t, D is po sa l a t a n ap pr ov ed fa ci lit y.
St at e of
F lo rid a
3.
W as te g en er at ed is fr om a ss es sm en t / re m ed ia tio n of d ry cl ea ne r s ite s un de r t he S ta te o f F lo rid a cl ea ni ng S ol ve nt C le an up P ro gr am w ith fu nd in g pr ov id ed b y th e
FD
EP
Th e
G en er at or is th e
Fl or id a
D ep ar tm en t o f E nv iro nm en ta l P ro te ct io n, B la ir
St on e R oa d, T al la ha ss ee
, F L
M S o r 4
5.
4.
PS
I i s un de r c on tr ac t w ith F
D
EP
fo r t he a ss es sm en t a nd re m ed ia tio n of d ry cl ea ne r p ro je ct s, a nd h en ce s ig ns p ro fil es a nd m an ife st s on b eh al f of
F D
EP
, B ur ea u of
W as te C le an up ,H az ar do us
W as te C le an up S ec tio n.
Pe tro te ch
S ou th ea st Q uo te
D is po sa l o f (
1) C ar bo n D ru m
5.
A s Sh ow n
Lo w
B id
W in ni ng
B id
PS
I -
In te rt ek
R eq ue st fo r A nn ua l I nv es tig at iv e D er iv ed W as te
(I D
W ) I
D W
P ic k-up
, t ra ns po rt , D is po sa l a nd T re at m en t
PR
O
JE
C
T B
ID
T
AB
U
LA
TI
O N
S
ID
Fa ci lit y
N am e Va rio us
D ry cl ea ni ng
S ite s un de r F
D
EP
D ry cl ea ni ng
S ol ve nt
C le an up
P ro gr am in F lo rid a Fa ci lit y Lo ca tio n Va rio us
Fa ci lit y
ID
Va rio us
D es cr ip tio n of S er vi ce
Ta m pa A re a
O rla nd o
- C en tr al
Fl id a Ja ck so nv ill e Ar ea
N or th F lo rid a
So ut h Fl or id a (M ia m i, Fo rt
M ye rs , N ap le
s) Fl or id a Pa nh an dl e w at er $1
.0
$1
.0
$1
.0
$2
.0
$1
.0 so il $1
.0
$1
.0
$1
.0
$2
.0
$1
.0 lo w v ol um e fe e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pi ck
-u p fe e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Pr of ile F ee
.0
0.
T he re is o ne fe e pe r g en er at or th at a llo w s m ul tip le lo ca tio ns c on tig en t o n th e m at er ia l.
Ad m in is tra tio n Fe e:
p er In vo ic e
$2
.0
$0 .0
$2
.0
$4
.0
$2
.0
1.
P le as e in cl ud e al l c os ts fo r p ic k-up , t ra ns po rt
, f ue l c os ts , s to pp ag e fe e, d is po sa l, ba se d on p er d ru m c os t.
2.
PS
I i s ne ith er th e ge ne ra to r n or tr an sp or te r f or h az ar do us o r n on -h az ar do us w as te
5.
W as te is c on si de re d no t h az ar do us
6.
An al yt ic al re su lts o f w as te w ill b e pr ov id ed b y a N
EL
AP
-a pp ro ve d la bo ra to ry
7.
A
PS
I P ur ch as e
O rd er re fe re nc in g Te rm s
C on di tio ns
(a tta ch ed
) w ill b e is su ed a nd m us t b e si gn ed p rio r t o pi ck
-u p.
es cr ip tio n
-G al lo n D ru m
P ic k-up
Tr an sp or t, D is po sa l a t a n ap pr ov ed fa ci lit y.
St at e of
F lo rid a
3.
W as te g en er at ed is fr om a ss es sm en t / re m ed ia tio n of d ry cl ea ne r s ite s un de r t he S ta te o f F lo rid a cl ea ni ng S ol ve nt C le an up P ro gr am w ith fu nd in g pr ov id ed b y th e
FD
EP
Th e
G en er at or is th e
Fl or id a
D ep ar tm en t o f E nv iro nm en ta l P ro te ct io n, B la ir
St on e R oa d, T al la ha ss ee
, F L
M S o r 4
5.
4.
PS
I i s un de r c on tr ac t w ith F
D
EP
fo r t he a ss es sm en t a nd re m ed ia tio n of d ry cl ea ne r p ro je ct s, a nd h en ce s ig ns p ro fil es a nd m an ife st s on b eh al f of
F D
EP
, B ur ea u of
W as te C le an up ,H az ar do us
W as te C le an up S ec tio n.
G C
VT
Q uo te
D is po sa l o f (
1) C ar bo n D ru m
$1
.0
T ra ns po rt an d D is po sa l
$5
Pr of ile fe e $2
Ad m in
F ee
$1
.0
To ta l
M id dl e
Bi d
- C on tra ct or n ot s el ec te d
File details come from the government source that posted it. Updated .