Task Assignment Summary
This Task Assignment (TA) document represents a contract vehicle between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (Intertek-PSI) for environmental services at Priceless Dry Cleaners, located at 220 North Orlando Avenue, Winter Park, Orange County, Florida. The underlying contract number is HW686, with this specific task assignment numbered DC008C. The department project manager is Mary Uribe (850-245-8990), and the contractor's project manager is Joshua Newell (863-712-4342).
The scope of work consists of annual groundwater volatile organic hydrocarbon (VOH) sampling and subsequent reporting at the dry cleaning facility, with a fixed unit rate total contract value of $6,961.13. Services include project management, groundwater monitoring from three intermediate monitoring wells (MW007, MW008, and MW019), sample collection and analysis via EPA Method 8260, development of a groundwater monitoring report with elevation maps and recommendations, and investigative derived waste (IDW) handling. The primary deliverable—submittal and approval of the groundwater monitoring report—is due August 29, 2025, with overall task completion by September 26, 2025. Cost components include direct labor ($2,062.72), overhead ($1,052.40), laboratory analysis ($589.00), field equipment and supplies ($430.00), travel and vehicle rental ($120.00), and subcontractor services for IDW disposal ($126.50). No additional funding sources or option periods are specified.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW686
DC008C Completion September 26, 2025
Annual Groundwater VOH sampling and subsequent reporting.
Mary Uribe 850-245-8990 Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor
Contractor Joshua Newell Contractor 863-712-4342
ERIC_5015
220 North Orlando Avenue Winter Park, Orange County
Priceless Dry Cleaners
Contractor Contractor
✔ $ 6,961.13
$ 6,961.13
Scope of Work
Professional Service Industries, Inc. (Intertek-PSI) Contractor
Digitally signed by Joshua S Newell Date: 2025.04.17 08:19:10-04'00'
John Travis
John Travis Digitally signed by John Travis Date: 2025.04.16 14:34:15 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 1 and 2: Submittal and approval of groundwater monitoring report 08/29/2025
Subtasks 1 and 2: Project management and VOH monitoring and Deliverable $ 6,961.13
$ 6,961.13
HW686
DC008C
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert
Secretary
Memorandum
TO: ERIC_5015
Priceless Dry Cleaners
FROM: Mary Uribe, Project Manager
SUBJECT: Negotiation Summary
HW686 DC008C
DATE: April 16th, 2025
PSI will perform Annual Groundwater Monitoring activities at Priceless Dry Cleaners, as detailed in the March 14th, 2025 proposal. Groundwater monitoring activities consist of VOH monitoring and subsequent reporting.
Total task amount is $6,961.13. PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is August 29th, 2025.
Task completion date is September 26th, 2025.
F D E P
C O S T
E S T I M A T E
C on tr ac to r:
P ro fe ss io na l S er vi ce In du st rie s, In c.
In te rt ek -P
S I) at e:
3/
/2
T as k ub T as k
P ro je ct M an ag em en t S ub T as k
S ite
P ric el es s
C le an er s E
R
IC
_5
T as k
V O
H M on ito rin g an d
D el iv er ab le
S ub
T as k
A ct iv ity
/P ha se
S ub
T as k
S ub
T as k
P ro je ct
M an ag er
Jo sh N ew el l, E
T as k
S ub
T as k
S ub
T as k
S ub
T as k
TT
o ta ls
L ab o r
R at e C at eg o ry
$4 8.
P ro je ct M an ag er
4.
$6
2.
S en io r
E ng in ee r, G
R
$4
8.
P ro je ct
E ng in ee r, J
N 8.
$4 0.
P ro je ct S ci en tis t, JD
.0
$3 9.
P ro je ct S ci en tis t, S L
.0
$3
4.
G
IS
C
A D
S pe ci al is t, D G
2.
$2
0.
A dm in is tr at iv e
A ss is ta nt , B
M 2.
T o ta l H o ur s
.9 4.
.0
D ire ct L ab or
$2
,0
.7
$2
.3
$1 ,8
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
1.
$3
,1
.1
$3
.3
$2 ,7
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
F rin ge
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l L ab o r $5
, 1
.8
$5
.6
$4 ,5
.1
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G W
V O
H
P F
A S
, S ed im en t, S ur fa ce w at er
, W el l I ns t
R E V
C E F
I n t e r t e k P S I
P a g e
F
E P
C O S T
E S T I M A T E
C on tr ac r:
ro fe ss io na l S er vi ce In du st rie s, In c.
In te rt ek -P
I) at e:
3/
/2
T as k
T as k
P ro je ct M an ag em en t S ub T as k
S ite
P ric el es s
C le an er s E
R
IC
_5
T as k
V O
H M on ito rin g an d
D el iv er ab le
S ub
T as k
A ct iv ity
/P ha se
S ub
T as k
S ub
T as k
P ro je ct
M an ag er
Jo sh N ew el l, E
T as k
S ub
T as k
S ub
T as k
S ub
T as k
TT
o ta ls
G W
V O
H
P F
A S
, S ed im en t, S ur fa ce w at er
, W el l I ns t
TT
ra ve l
V eh ic le
R en ta l
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir F ar e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
T ra ve l
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct o r
(E q ui p m en t P ro cu re m en t)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l S ub co nt ra ct o r C o st
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct o r
(S er vi ce s P ro cu re m en t) ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
F ee
$1 1.
$1
1.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l S ub co nt ra ct o r C o st
$1
.5
$1
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
L ab o ra ry
A na ly tic al
C os ts $5
.0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
F as t T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e S hi pp in g
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l L ab o ra to ry $5
.0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
F ie ld
E xp en se s er so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$4 0.
$4
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al r el at ed
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W r el at ed
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$3
.0
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l F ie ld E xp en se s
$4
.0
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub to ta l $6
,4
.3
$5
.6
$5 ,8
.6
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C o m p le t i o n F ee $5
.7
$5
9.
$4
.2
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l E st im at ed
C o st $6
,9
.1
$6
.2
$6 ,3
.8
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
R E V
C E F
I n t e r t e k P S I
P a g
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Priceless Cleaners ERIC_5015 SubTask 2 VOH Monitoring and Deliverable
DATE: 3/14/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, G Robinson Technical Assistance 3 Notification to tenants 1
Total Hours 4 Soil, Sediment, Surfacewater, Groundwater Sampling Project Scientist, S Luth Field event preparation 1
Travel (5 hour roundtrip to site) 5 Collect groundwater elevations (5 wells over several properties) 1 Collect groundwater samples from 3 wells: 4.5 Monitoring wells MW007, MW008, and MW019 Documentation of groundwater sampling & measurements 0.5 Label and Stage IDW Drum 1 Pick-up, drop off samples 2
Total Hours 15
Data Evaluation/ Report Development
Senior Engineer, J Newell Evaluate data 3 Make recommendations for report 4 Sign and seal document 1
Total Hours 8
Project Scientist, J Daugherty Data reduction/evaluation 3 Preparation of groundwater monitoring report 5 Report - Prepare final tables and figure 4
Total Hours 12
GIS/CADD Specialist, D Grove Develop maps, figures 2
Administrative Assistant, B Meynardie Finalize report, process invoice 2
TOTAL LABOR 43.00
VEHICLE TYPE RATE UNIT USEAGE
$0.00 Equipment Van / Truck (mobilize from Tampa) $120.00 day 1 $120.00
$0.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Petrotech Southeast IDW pickup, transport, disposal, water, per drum $115.00 $115.00
$115.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
VOH Sampling $0.00 EPA Method 8260 $73.00 3 $219.00 IDW Sampling Halocarbons by EPA Method 8260 $73.00 1 $73.00 Non-Halocarbons by EPA Method 8260 $70.00 1 $70.00 PAH's by EPA Method 8270 $110.00 1 $110.00 Metals (As, Ba, Cd, Cr, Pb, Sg, Ag) by EPA Method 6010 $91.00 1 $91.00 Mercury by EPA Method 7470/7471 $26.00 1 $26.00
TOTAL LAB $589.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 55 gallon drum $100.00 each 1 $100.00 Expendables $40.00 day 1 $40.00
TOTAL EQUIPMENT $430.00
FINAL --7/24/96
Page 3 Priceless ERIC_5015 GW VOH 0552-446682
FDEP – Hampton Cleaners ERIC_5015 PSI Proposal 0552-446682
March 14, 2025 www.intertek.com/building is required since concentrations dropped to below the PGCTLs in the last monitoring event in an email dated March 14, 2025. Therefore, PSI has not proposed additional PFAS sampling efforts.
PROPOSED SCOPE OF WORK
The proposal contained herein consists of conducting annual groundwater monitoring for VOH compounds. Specifically, the proposed scope of work consists of the following subtasks:
1. Project Management
This scope is provided for in the template worksheets and is detailed in Subtask 1.
2. Annual VOH Groundwater Monitoring and Report
a. Mobilization to the site.
b. Collect DTW from up to five (5) available and accessible wells (MW007, MW008, MW009, MW012, and MW019).
c. Collect groundwater samples for VOHs analysis from the following monitoring wells:
i. Three (3) intermediate monitoring wells MW007, MW008, and MW019
d. Submit groundwater samples to a NELAC-approved laboratory for analysis of VOHs via EPA Method 8260.
e. Development of a Groundwater Monitoring Report showing current groundwater elevation maps, current groundwater data, and recommendations, as necessary.
f. The investigative derived waste (IDW) that will be generated during the annual groundwater monitoring is limited to purge water from the monitoring wells which will be containerized in a 55-gallon drum, pending waste characterization, and transported off-site for disposal at an FDEP approved facility.
The deliverable and invoice schedule are presented below and are based on receival of a Task Assignment prior to April 15, 2025. The last groundwater sampling event occurred in April 2023.
PS
I -
In te rt ek
R eq ue st fo r A nn ua l I nv es tig at iv e D er iv ed W as te
(I D
W ) I
D W
P ic k-up
, t ra ns po rt , D is po sa l a nd T re at m en t
PR
O
JE
C
T B
ID
T
AB
U
LA
TI
O N
S
ID
W
Fa ci lit y
N am e Va rio us
D ry cl ea ni ng
S ite s un de r F
D
EP
D ry cl ea ni ng
S ol ve nt
C le an up
P ro gr am in F lo rid a Fa ci lit y Lo ca tio n Va rio us
Fa ci lit y
ID
Va rio us
D es cr ip tio n of S er vi ce
Ta m pa A re a
O rla nd o
- C en tr al
Fl id a Ja ck so nv ill e Ar ea
N or th F lo rid a
So ut h Fl or id a (M ia m i, Fo rt
M ye rs , N ap le
s) Fl or id a Pa nh an dl e w at er $1
.0
$1
.0
N
/A N
/A N
/A so il $1
.0
$1
.0
N
/A N
/A N
/A lo w v ol um e fe e N
/A N
/A N
/A Pi ck -u p fe e $0
.0
$0 .0
N
/A N
/A N
/A
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
1.
P le as e in cl ud e al l c os ts fo r p ic k-up , t ra ns po rt
, f ue l c os ts , s to pp ag e fe e, d is po sa l, ba se d on p er d ru m c os t.
2.
PS
I i s ne ith er th e ge ne ra to r n or tr an sp or te r f or h az ar do us o r n on -h az ar do us w as te
5.
W as te is c on si de re d no t h az ar do us
6.
An al yt ic al re su lts o f w as te w ill b e pr ov id ed b y a N
EL
AP
-a pp ro ve d la bo ra to ry
7.
A
PS
I P ur ch as e
O rd er re fe re nc in g Te rm s
C on di tio ns
(a tta ch ed
) w ill b e is su ed a nd m us t b e si gn ed p rio r t o pi ck
-u p.
es cr ip tio n
-G al lo n D ru m
P ic k-up
Tr an sp or t, D is po sa l a t a n ap pr ov ed fa ci lit y.
St at e of
F lo rid a
3.
W as te g en er at ed is fr om a ss es sm en t / re m ed ia tio n of d ry cl ea ne r s ite s un de r t he S ta te o f F lo rid a cl ea ni ng S ol ve nt C le an up P ro gr am w ith fu nd in g pr ov id ed b y th e
FD
EP
Th
G en er at or is th e
Fl or id a
D ep ar tm en t o f E nv iro nm en ta l P ro te ct io n, B la ir
St on e R oa d, T al la ha ss ee
, F L
M S o r 4
5.
4.
PS
I i s un de r c on tr ac t w ith F
D
EP
fo r t he a ss es sm en t a nd re m ed ia tio n of d ry cl ea ne r p ro je ct s, a nd h en ce s ig ns p ro fil es a nd m an ife st s on b eh al f of
F D
EP
, B ur ea u of
W as te C le an up ,H az ar do us
W as te C le an up S ec tio n.
Pe tro te ch
S ou th ea st Q uo te $1
/w at er d ru m
Lo w
B id
W
IN
N
IN
G
B
PS
I -
In te rt ek
R eq ue st fo r A nn ua l I nv es tig at iv e D er iv ed W as te
(I D
W ) I
D W
P ic k-up
, t ra ns po rt , D is po sa l a nd T re at m en t
PR
O
JE
C
T B
ID
T
AB
U
LA
TI
O N
S
W
Fa ci lit y
N am e Va rio us
D ry cl ea ni ng
S ite s un de r F
D
EP
D ry cl ea ni ng
S ol ve nt
C le an up
P ro gr am in F lo rid a Fa ci lit y Lo ca tio n Va rio us
Fa ci lit y
ID
Va rio us
D es cr ip tio n of S er vi ce
Ta m pa A re a
O rla nd o
- C en tr al
Fl id a Ja ck so nv ill e Ar ea
N or th F lo rid a
So ut h Fl or id a (M ia m i, Fo rt
M ye rs , N ap le
s) Fl or id a Pa nh an dl e w at er $1
.0
$1
.0
$1
.0
$2
.0
$1
.0 so il $1
.0
$1
.0
$1
.0
$2
.0
$1
.0 lo w v ol um e fe e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pi ck
-u p fe e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Pr of ile F ee
.0
0.
T he re is o ne fe e pe r g en er at or th at a llo w s m ul tip le lo ca tio ns c on tig en t o n th e m at er ia l.
Ad m in is tra tio n Fe e:
p er In vo ic e
$2
.0
$0 .0
$2
.0
$4
.0
$2
.0
1.
P le as e in cl ud e al l c os ts fo r p ic k-up , t ra ns po rt
, f ue l c os ts , s to pp ag e fe e, d is po sa l, ba se d on p er d ru m c os t.
2.
PS
I i s ne ith er th e ge ne ra to r n or tr an sp or te r f or h az ar do us o r n on -h az ar do us w as te
5.
W as te is c on si de re d no t h az ar do us
6.
An al yt ic al re su lts o f w as te w ill b e pr ov id ed b y a N
EL
AP
-a pp ro ve d la bo ra to ry
7.
A
PS
I P ur ch as e
O rd er re fe re nc in g Te rm s
C on di tio ns
(a tta ch ed
) w ill b e is su ed a nd m us t b e si gn ed p rio r t o pi ck
-u p.
es cr ip tio n
-G al lo n D ru m
P ic k-up
Tr an sp or t, D is po sa l a t a n ap pr ov ed fa ci lit y.
St at e of
F lo rid a
3.
W as te g en er at ed is fr om a ss es sm en t / re m ed ia tio n of d ry cl ea ne r s ite s un de r t he S ta te o f F lo rid a cl ea ni ng S ol ve nt C le an up P ro gr am w ith fu nd in g pr ov id ed b y th e
FD
EP
Th
G en er at or is th e
Fl or id a
D ep ar tm en t o f E nv iro nm en ta l P ro te ct io n, B la ir
St on e R oa d, T al la ha ss ee
, F L
M S o r 4
5.
4.
PS
I i s un de r c on tr ac t w ith F
D
EP
fo r t he a ss es sm en t a nd re m ed ia tio n of d ry cl ea ne r p ro je ct s, a nd h en ce s ig ns p ro fil es a nd m an ife st s on b eh al f of
F D
EP
, B ur ea u of
W as te C le an up ,H az ar do us
W as te C le an up S ec tio n.
G C
VT
Q uo te
$1
/d ru m
H ig h Bi d
04/24/2024 01:44 PM PAGE 1 OF 7
Scope of Work pricing is based on an approved non hazardous facility in to Enviroserve Mulberry
4600 BROOKPARK ROAD, CLEVELAND,
OHIO, 44134
(216) 642-1311
(216) 642-1474
QUOTE #: 0042802
DATE: 04/24/2024 PROJECT PROPOSAL
CLIENT
JOSH NEWELL
INTERTEK/PSI - PLANT CITY
607 SOUTH ALEXANDER ST, SUITE 202, PLANT CITY, FLORIDA,
33563 P: (863) 712-4342
E-MAIL:JOSHUA.NEWELL@INTERTEK.COM
PROJECT DESCRIPTION
FDEP DRY CLEANING DRUMS
FDEP
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANSPORTATION - LTL DRUM (6 - 55 GAL) - 251-400 MILES 1.00 $50.00 DRUM $50.00
LOW STOP FEE (LESS THAN 6 DRUMS) 1.00 $50.00 55 GAL DRUM $50.00
ENERGY SURCHARGE (APPLIES TO TOTAL INVOICE) - $15.00 % -
TRANSPORTATION SUBTOTAL: $100.00
DISPOSAL
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
55 GAL DRUM / SOLID 1.00 $80.00 EACH $80.00
DISPOSAL SUBTOTAL: $80.00
JOB ESTIMATE: $180.00
ENVIRONMENTAL FEE: $9.00
TOTAL JOB ESTIMATE: $189.00
$189/drum - High Bid