Document Summary
This Task Assignment (TA) DC003C is executed between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (Intertek-PSI) under the indefinite delivery vehicle Contract HW686. The task assignment authorizes PSI to conduct supplemental soil assessment activities at Pugh's Dry Cleaners, located at 215 South Bay Street, Eustis, Lake County, Florida (ERIC_4814). The work is managed by FDEP Project Manager Kelly Crain and PSI's Senior Geologist/Principal Consultant Nana G. Westmark.
The scope of work consists of three subtasks: project management, soil assessment sampling, and data evaluation/report preparation. Soil samples will be collected from 14 boring locations at depths ranging from 0 to 5 feet below land surface (or to the water table if shallower) and analyzed for volatile organic halocarbons, BTEX, naphthalene, and total recoverable petroleum hydrocarbons using EPA Method 8260 and FL-PRO methods, with synthetic precipitation leaching procedure (SPLP) analysis if concentrations exceed Soil Cleanup Target Levels. The deliverable is a Supplemental Site Assessment Report due February 28, 2024. The total task assignment value is $33,340.13 on a fixed unit rate basis, consisting of 129.7 labor hours across three subtasks: project management ($1,559.10), soil assessment ($27,343.44), and data evaluation/report ($4,437.59). Invoicing occurs upon FDEP approval of the final report. The task assignment completion date is April 1, 2024.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW686
DC003C Completion April 1, 2024
This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct supplemental soil assessment activities in accordance with the PSI scope of work, cost estimate, and schedule received on October 25, 2023.
Kelly Crain 850-245-8953 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Professional Service Industries, Inc. (Inertek-PSI)
Professional Service Industries, Inc. (Inertek-PSI)
Nana G. Westmark 813-886-1075
ERIC_4814
215 South Bay Street, Eustis, LakeCounty, FL
Pugh's Drycleaners
✔ $ 33,340.13
$ 33,340.13
Scope of Work
Nana Westmark
Senior Geologist / Principal Consultant
Nana G Westmark Digitally signed by Nana G Westmark Date: 2023.11.14 12:05:55 -05'00' Kelly Crain Digitally signed by Kelly Crain
Date: 2023.11.14 12:32:11 -05'00'
N/A
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Supplemental Site Assessment Report (Subtask 1, 2 & 3) 02/28/2024
FDEP Approval of Supplemental Site Assessment Report (Subtask 1, 2 & 3) $ 33,340.13
$ 33,340.13
HW686
DC003C
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection Bob Martinez Center
2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton
Secretary
To:
From:
Date:
Subject:
HW686 Contract Negotiation File
Pugh's Drycleaners
Eustis, Lake County ERIC_4814
Kelly Crain, Project Manager November 6, 2023 Negotiation Summary
HW686 DC003C
This Task Assignment authorizes PSI to conduct soil assessment activities in accordance with the October 25, 2023, Scope of Work, and Cost Estimate. PSI will submit a Supplemental Site Assessment Report with appropriate conclusions and recommendations.
PSI will confirm that an Access Agreement with the current real property owner of the Pugh's Drycleaner (ERIC_4814) site has been executed prior to beginning site work.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task
Assignment. The final cost for this Task Assignment is $33,340.13 with 129.7 labor hours.
FDEP COST ESTIMATE
Contractor: Professional Service Industries, Inc. (Intertek-PSI)
Date: 9/29/2023, revised 10/25/2023
Task #: SubTask 1 Project Management SubTask 6
Site: Pugh's Cleaners ERIC_4814 SubTask 2 Soil Assessment SubTask 7
Activity/Phase: Soil Sampling, SSA SubTask 3 Data Evaluation / Report SubTask 8
Project Manager: Nana Westmark SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$58.41 Project Manager 9.7 9.7 $0.00 Principal Consultant 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0
$60.00 Senior Engineer, MR 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $58.41 Senior Geologist, NW 16.0 7.0 9.0 0.0 0.0 0 0 0 0 0 $64.90 Senior Scientist, DC 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0
$0.00 Certified Industrial Hygientist 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Certified Hazardous Materials Manager 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Florida Licensed Asbestos Consultant 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Project Manager 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0
$43.27 Project Engineer, JN 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $43.27 Project Engineer, GR 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $42.09 Project Engineer, MK 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $37.74 Project Geologist, SAM 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $33.74 Project Scientist, SB 62.0 36.0 26.0 0.0 0.0 0 0 0 0 0 $28.51 Project Scientist, AH 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $28.85 Project Scientist, RP 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0
$0.00 QA Officer 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $31.51 Remediation Specialist, RH 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $34.03 GIS / CAD Specialist, DG 6.0 0.0 6.0 0.0 0.0 0 0 0 0 0
$0.00 Staff Engineer 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $25.48 Staff Scientist, MM 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $24.52 Staff Scientist, OG 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $30.91 Environmental Specialist, CC 36.0 36.0 0.0 0.0 0.0 0 0 0 0 0 $28.39 Environmental Specialist, DK 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $20.81 Administrative Assistant, BM 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0
Total Hours 129.7 9.7 79.0 41.0 0.0 0.0 0 0 0 0 0
Direct Labor $4,908.02 $564.64 $2,736.27 $1,607.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 151.02% $7,412.09 $852.72 $4,132.31 $2,427.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $12,320.11 $1,417.36 $6,868.58 $4,034.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF PSI Intertek Page 1
FDEP COST ESTIMATE
Contractor: Professional Service Industries, Inc. (Intertek-PSI)
Date: 9/29/2023, revised 10/25/2023
Task #: SubTask 1 Project Management SubTask 6
Site: Pugh's Cleaners ERIC_4814 SubTask 2 Soil Assessment SubTask 7
Activity/Phase: Soil Sampling, SSA SubTask 3 Data Evaluation / Report SubTask 8
Project Manager: Nana Westmark SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Travel
Vehicle Rental $960.00 $960.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $1,488.00 $1,488.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $2,448.00 $2,448.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $14,420.00 $14,420.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $14,420.00 $14,420.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $2,760.00 $2,760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,920.00 $2,920.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $32,108.11 $1,417.36 $26,656.58 $4,034.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,232.02 $141.74 $686.86 $403.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $33,340.13 $1,559.10 $27,343.44 $4,437.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF PSI Intertek Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Pugh's Cleaners ERIC_4814 SubTask 2 Soil Assessment DATE: 9/29/2023, revised 10/25/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist, N Westmark Technical assistance 3 Site Access negotiation 4
Total Hours: 7 Soil Confirmation Inside Environmental Specialist, C Cummins Field preparation for soil confirmation sampling 2
Travel (roundtrip) 5 Soil Boring Installation 24 Documentation (logs, measurements, notes) 4 Pick up sample kit 1
Total Hours: 36 Project Scientist, S Barnes
Travel (roundtrip) 5 Set-up (core drill, lay visqueen, move inside equipment) 3 Soil Boring Installation 24 Patch concrete 3 Drop off sample kit 1
Total Hours: 36
TOTAL LABOR 79
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Soil Assessment Kit $175.00 day 4 $700.00 Soil Sampling Kit (through concrete) $235.00 day 4 $940.00 Encore soil samplers $16.00 each 70 $1,120.00
$2,760.00 Expendables $40.00 day 4 $160.00
TOTAL EQUIPMENT $2,920.00
VEHICLE TYPE RATE UNIT USEAGE
Equipment Van / Truck (Soil Boring), Environmental Specialis $120.00 day 4 $480.00 Mob from Sarasota
Equipment Van / Truck (Soil Boring), Project Scientist $120.00 day 4 $480.00 Mob from Tampa
TOTAL VEHICLE $960.00
PER DIEM STAFF RATE UNIT USEAGE
Project Scientist, S Barnes Lodging Soil Sampling $150.00 days 4 $600.00 Meals Soil Sampling $36.00 days 4 $144.00
Environmental Specialist, C Cummins Lodging Soil Sampling $150.00 days 4 $600.00 Meals Soil Sampling $36.00 days 4 $144.00
TOTAL PER DIEM $1,488.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
Soil VOC by EPA Method 8260 (5 samples per boring, 15 boring $73.00 70 $5,110.00 includes VOH, BTEX, and Naphthalene) SPLP Extraction, Method 1311, 1312 $45.00 70 $3,150.00 TRPH by FL-PRO $88.00 70 $6,160.00
TOTAL LAB $14,420.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
TOTAL $0.00
Page 3 Copy of Rev 1 Pugh's ERIC_4814 0552-409380
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Pugh's Cleaners ERIC_4814 SubTask 3 Data Evaluation / Report DATE: 9/29/2023, revised 10/25/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Data Evaluation / Develop Report
Senior Geologist, N Westmark Evaluate data, provide recommendations 8 Sign and seal documents 1
Total Hours: 9
Project Scientist, S Barnes Review Data 6 Develop contour maps, figures from data results 6 Develop Soil Sampling Supplemental Site Assessment Report 14
Total Hours: 26 GIS/CADD Specialist, D Grove Develop maps, figures 6
TOTAL LABO 41
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPME $0.00
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICL $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIE $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
TOTAL $0.00
Page 4 Copy of Rev 1 Pugh's ERIC_4814 0552-409380
PSI Proposal: 0552-409380 September 29, 2023, revised October 25, 2023
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916 www.intertek.com/building
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Attention: Ms. Kelly Crain, Environmental Administrator Telephone: (850) 245-8705 main, (850) 245-8953 direct Email: Kelly.Crain@FloridaDEP.gov
Re: Proposal for Supplemental Site Assessment – revision 1 (Soil Assessment)
Pugh’s Dry Cleaners 215 South Bay Street Eustis, Lake County, Florida
ERIC_4814
Dear Ms. Crain:
Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the revised proposal contained herein to provide Supplemental Site Assessment (Soil Assessment Sampling and Analysis) at the Pugh’s Dry Cleaners located at 215 South Bay Street, Eustis, Lake County, Florida. Included with this proposal is a discussion of the project history to date, proposed scope of work, proposed work schedule, and cost estimate. A Site Access Agreement with the new owner was signed in March 2023 and, according to the Lake County Property Appraiser’s website in September 2023, the property owner has not changed.
The scope of work has been revised to reflect recent FDEP comments to include additional analytes, and modification of the depth intervals and lateral placement of the borings.
PROJECT BACKGROUND
Dry cleaning operations at Pugh’s Dry Cleaners began in 1948 and utilized a petroleum-based solvent. In 1965, Pugh’s switched to tetrachloroethene (PCE) as the drycleaning solvent, which was stored in an AST located inside the building. Based on documented impacts from the drycleaner, the facility was accepted into the Florida Drycleaning Solvent Cleanup Program in August 1998, and assessment activities by others commenced in December 2002. The assessment results revealed impact at levels requiring remediation and a soil vapor extraction (SVE) system was implemented. PSI took over running the SVE system in 2011 due to contractor turnover.
mailto:Kelly.Crain@FloridaDEP.gov
FDEP – Pugh’s Dry Cleaners
Additional assessment wells were installed with PSI oversight at the Pugh’s Dry Cleaners in January 2015, which revealed high PCE concentrations (2,630 μg/L) under the drycleaning machine beneath the building at a depth of 37-41 feet below land surface (bls). Subsequent groundwater monitoring results have indicated increasing PCE concentrations in downgradient, intermediate monitoring wells, with a peak PCE concentration of 2,870 μg/L detected in monitoring well MW018 (screened 42-47 feet bls) in March 2017.
The Department then requested that the SVE system be shut down due to the drycleaner’s continued use of PCE.
The property changed ownership in 2016 and switched from PCE to a non-chlorinated solvent. The SVE system was re-started in October 2016 and is currently operating. The groundwater remains impacted with PCE at elevated concentrations.
A groundwater remediation strategy was designed incorporating In Situ Chemical Oxidation to reduce concentrations of COCs in groundwater. PSI prepared this design in a Remedial Action Plan submitted to the Department on April 12, 2019, which was subsequently approved. The remediation activities were implemented with a Regenesis product Persulfox which was applied in 22 injection wells (screened intervals 30 – 40 feet, and 58 – 68 feet). Two separate injection activities were conducted, one in September 2020 and the second injection in December 2020. Post injection monitoring is continuing with some groundwater contaminant rebound occurring.
The drycleaning business has relocated and the building is currently being used as a drop-off only. This was confirmed in September 2023. Based on the tenant space being vacant, we recommend conducting additional soil sampling inside the building to potentially conduct an interim source removal inside. The FDEP Waste Site Cleanup Section has also recommended we proceed with this course of action. The FDEP provided comments and suggestions for adding petroleum compounds to the soil confirmation sampling (BTEX, naphthalene, and TRPH) due to the former use of petroleum as a solvent.
PROPOSED SCOPE OF WORK
The proposal contained herein consists of conducting soil sampling inside the building.
Specifically, the proposed scope of work consists of the following subtasks:
1. Project Management
This scope is provided for in the template worksheets.
2. Soil Sampling
Soil samples will be collected during this event. The samples will be collected near select locations previously documented to have elevated concentrations of the contaminants of concern (COC) as shown on the attached site sketch (14 soil borings). The samples will be collected from the following depth intervals:
• 0 – 1 feet bls
• 1 - 2 feet bls
• 2 - 3 feet bls
• 3 – 4 feet bls
• 4 – 5 feet bls
• And if the water table is greater than 5 feet, we will take samples to just above the water table.
The soil samples will be analyzed for Volatile Organic Halocarbons (VOHs) by EPA Method 8260 (including BTEX and naphthalene), and TRPH by the FL-PRO method and will be subjected to extraction procedures for Synthetic Precipitation Leaching Procedure (SPLP) purposes. If the concentrations are above the Soil Cleanup Target Level (SCTL) leachability criteria in Chapter 62- 777, FAC, the samples will be further analyzed by the SPLP method.
3. Data Evaluation and Report Deliverable
A Supplemental Site Assessment Report – (Soil Assessment) will be prepared which will include updated soil summary tables, revised maps, soil boring logs, and analytical reports. Conclusions and recommendations for a future course of action will be presented.
COST ESTIMATE AND SCHEDULE
The estimated cost to conduct the above-described work is shown on the attached Cost Estimate and Level of Effort sheets. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021.
The soil assessment sampling will start in November / December 2023 and depending on site access, a Supplemental Site Assessment will be developed as the deliverable. A deliverable and invoice schedule is presented below.
Pugh's Cleaners ERIC_4814 Deliverables Deliverable Due Date
SubTask 1 Project Management Upon completion of Task Assignment
SubTask 2 Soil Assessment February 28, 2024
SubTask 3 Data Evaluation / Report February 28, 2024 Requirements for Invoice Submittal Amount to be Invoiced
SubTask 1 Project Management $1,559.10
SubTask 2 Soil Assessment $27,343.44
SubTask 3 Data Evaluation / Report $4,437.59
Total: $33,340.13
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075 or (813) 267-2519.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC., an Intertek company
Michael Rothenburg, PE, CIH Nana Westmark, PG, CHMM Senior Engineer Senior Geologist / Contract Manager
Enclosure: Cost Estimate Level of Effort Site Sketch – proposed soil sample locations
Z:\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552------Pugh's Soil Conf 2023\Proposal\Pugh's ERIC_4814 0552- 409380.docx
FIGURE
0552600
PROJ. NO.
DATE REVISED
SCALE: 1" = 20'
10/16/23
Suite 112 Tampa, Florida 33634
(813) 886-1075
(813) 249-4916 fax
5801 Benjamin Center Drive, SOIL ANALYTICAL RESULTS
PUGH'S DRY CLEANERS
215 SOUTH BAY STREET
EUSTIS, LAKE COUNTY, FLORIDA
FDEP ID No. ERIC_4814
CRH
DRAWN BY
MS001 Conf.
1/30/2020
Depth (ft)
PCE
(mg/kg)
PCE-SPLP
(μg/L)
0-0.5 0.000822 U - 0.5-1 0.0526 0.38 U 1-2 0.158 1.1
MS002 Conf.
1/30/2020
Depth (ft)
PCE
(mg/kg)
PCE-SPLP
(μg/L)
0-0.5 1.90 0.38 U 0.5-1 0.26 0.38 U 1-2 0.118 0.38 U
MS003 Conf.
1/30/2020
Depth (ft)
PCE
(mg/kg)
PCE-SPLP
(μg/L)
0-0.5 0.0475 0.38 U 0.5-1 0.0235 - 1-2 0.0424 1.6
SB018 Conf.
1/30/2020
Depth (ft)
PCE
(mg/kg)
PCE-SPLP
(μg/L)
0-1 0.0102 - 2-3 0.0887 0.38 U 4-5 0.000972 I -
SB026 Conf.
1/30/2020
Depth (ft)
PCE
(mg/kg)
0-1 0.00553 2-3 0.0267 4-5 0.0261
SB004 Conf.
6/18/2021
Depth (ft)
PCE
(mg/kg)
2-3 0.0056 4-5 0.0027 I
SB005 Conf.
6/18/2021
Depth (ft)
PCE
(mg/kg)
0-1 0.023 2-3 0.0038 I 4-5 0.0024 I
SB006 Conf.
6/18/2021
Depth (ft)
PCE
(mg/kg)
0-1 0.0053 2-3 0.0037 I
SB007 Conf.
6/19/2021
Depth (ft)
PCE
(mg/kg)
PCE-SPLP
(μg/L)
TCE
(mg/kg)
TCE-SPLP
(μg/L)
0-1 0.0015 U - 0.0015 U - 2-3 0.0016 I - 0.0014 U - 4-5 2.1 9.5 Q 2.7 96.6 Q
SB008 Conf.
6/19/2021
Depth (ft)
PCE
(mg/kg)
0-1 0.0015 U 2-3 0.0012 U 4-5 0.0012 U
SB009 Conf.
6/18/2021
Depth (ft)
PCE
(mg/kg)
4-5 0.0016 I
SB016 Conf.
6/16/2021
Depth (ft)
PCE
(mg/kg)
PCE-SPLP
(μg/L)
0-1 2480 - 2-3 0.10 3.7 Q
4-5 2.7 9.7 Q
SB017 Conf.
6/18/2021
Depth (ft)
PCE
(mg/kg)
2-3 0.0013 U
SAMPLE ID
SAMPLE DATE
PCE
(mg/kg)
PCE-SPLP
(μg/L)
TCE
(mg/kg)
TCE-SPL
P
(μg/L)
① ② ③ ④ ⑤
Cleanup Target Level PCE TCE SCTL Leach. (mg/kg) 0.03 0.03 SCTL Resid. (mg/kg) 8.8 6.4
SCTL Comm. (mg/kg) 18 9.3 GCTL (μg/L) 3 3
4 5
AutoCAD SHX Text
STATE ROAD # 19
AutoCAD SHX Text
PUGH'S DRY CLEANERS
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
CC
AutoCAD SHX Text
CC
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text # 219
AutoCAD SHX Text
AMOCO
AutoCAD SHX Text
1 STORY BUILDING
AutoCAD SHX Text S
AutoCAD SHX Text
SD
AutoCAD SHX Text
APPROXIMATE PROPERTY LINE
AutoCAD SHX Text
APPROXIMATE PROPERTY LINE
AutoCAD SHX Text
MW004
AutoCAD SHX Text
MW014
AutoCAD SHX Text
MW019
AutoCAD SHX Text
MW020
AutoCAD SHX Text
MW022/SB00D
AutoCAD SHX Text
MW012
AutoCAD SHX Text
MW017
AutoCAD SHX Text
MW015
AutoCAD SHX Text
APPROXIMATE SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C:\Desktop\CADAMS\Projects\2023\23003P-26 - IntertekPSI CAD\Dwg
AutoCAD SHX Text
%%ULEGEND
AutoCAD SHX Text
INTERMEDIATE MONITOR WELL
AutoCAD SHX Text
DEEP MONITOR WELL
AutoCAD SHX Text
SHALLOW MONITOR WELL
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
APPROXIMATE PROPERTY BOUNDARY
AutoCAD SHX Text
SD
AutoCAD SHX Text S
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text
SANITARY SEWER MANHOLE
AutoCAD SHX Text
WATER
AutoCAD SHX Text
GAS
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text G
AutoCAD SHX Text
GAS METER
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GRASS AREA
AutoCAD SHX Text G
AutoCAD SHX Text
CC
AutoCAD SHX Text
CONCRETE CURBING
AutoCAD SHX Text A
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
COVERED AREA
AutoCAD SHX Text
SITE PLAN PROVIDED BY AECOM.
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
1 = SAMPLE DEPTH (FT BLS)
AutoCAD SHX Text
2 = TETRACHLOROETHENE (PCE)
AutoCAD SHX Text
3 = PCE BY SYNTHETIC PRECIPITATION
AutoCAD SHX Text
SB026
AutoCAD SHX Text
MW-13-AMOCO
AutoCAD SHX Text
MW-12-AMOCO
AutoCAD SHX Text
MW-19-AMOCO
AutoCAD SHX Text
MW001/MW-10 AMOCO
AutoCAD SHX Text
MW003
AutoCAD SHX Text
MW-14-AMOCO
AutoCAD SHX Text
MW018
AutoCAD SHX Text
MW013
AutoCAD SHX Text
MW-15-AMOCO
AutoCAD SHX Text
MW016
AutoCAD SHX Text
MW021/SB00C
AutoCAD SHX Text
MW009
AutoCAD SHX Text SB018 Conf.
AutoCAD SHX Text
MS001
AutoCAD SHX Text
CONFIRMATORY SOIL SAMPLE LOCATION
AutoCAD SHX Text
VALUE BETWEEN METHOD DETECTION LIMIT (MDL)
AutoCAD SHX Text
AND PRACTICAL QUANTITATION LIMIT
AutoCAD SHX Text I =
AutoCAD SHX Text
ANALYTE NOT DETECTED ABOVE LABORATORY MDL
AutoCAD SHX Text U =
AutoCAD SHX Text
ANALYTE EXCEEDS LABORATORY MDL
AutoCAD SHX Text
BOLD
AutoCAD SHX Text
ANALYTE EXCEEDS SCTL BASED ON RESIDENTIAL DIRECT
AutoCAD SHX Text
RED BOLD
AutoCAD SHX Text
EXPOSURE CRITERIA AND/OR LEACHABILITY BASED ON
AutoCAD SHX Text
GROUNDWATER CRITERIA, PER CHAPTER 62-777, FAC
AutoCAD SHX Text
ANALYTE EXCEEDS SCTL BASED ON COMMERCIAL/
AutoCAD SHX Text
BLUE BOLD
AutoCAD SHX Text
INDUSTRIAL DIRECT EXPOSURE CRITERIA, PER
AutoCAD SHX Text RESULTS REPORTED IN MILLIGRAMS/KILOGRAM (mg/kg)
AutoCAD SHX Text
LEACHING PROCEDURE (SPLP)
AutoCAD SHX Text
CHAPTER 62-777, FAC
AutoCAD SHX Text Conf.
AutoCAD SHX Text Conf.
AutoCAD SHX Text
MS003
AutoCAD SHX Text Conf.
AutoCAD SHX Text
MS002
AutoCAD SHX Text Conf.
AutoCAD SHX Text AND MICROGRAMS/LITER (µg/L)
AutoCAD SHX Text
SYSTEM TRAILER
AutoCAD SHX Text
MW011
AutoCAD SHX Text
SB004
AutoCAD SHX Text Conf.
AutoCAD SHX Text
SB008
AutoCAD SHX Text Conf.
AutoCAD SHX Text
SB009
AutoCAD SHX Text Conf.
AutoCAD SHX Text
SB007
AutoCAD SHX Text Conf.
AutoCAD SHX Text
SB017
AutoCAD SHX Text Conf.
AutoCAD SHX Text
SB006
AutoCAD SHX Text Conf.
AutoCAD SHX Text
SB016
AutoCAD SHX Text Conf.
AutoCAD SHX Text
SB005
AutoCAD SHX Text Conf.
AutoCAD SHX Text
4 = TRICHLOROETHENE (TCE)
AutoCAD SHX Text
5 = TCE BY SPLP
AutoCAD SHX Text
SAMPLE HELD BEYOND THE ACCEPTED
AutoCAD SHX Text
HOLDING TIME
AutoCAD SHX Text Q =
AutoCAD SHX Text
PROPOSED SOIL SAMPLE LOCATION
| HW686 TA DC010B.pdf |
| HW686 TA DC010B.pdf |
| proposal ERIC_5357 Final.pdf |
| 5. Three Months of O&M (Third Quarter) |
| 7. Annual RASS Report |
| 8. Utilities for remediation system operation |
| COST ESTIMATE AND SCHEDULE |
| Haines City ERIC_5357 0552-374799 Jun 7, 2022 cost.pdf |
| Cost Estimate |
| Formula Sheet |
| LOE 2 Qtr 1 O&M |
| LOE 3 Qtr 2 O&M |
| LOE 4 RASS |
| LOE 5 Qtr 3 O&M |
| LOE 6 Qtr 4 O&M |
| LOE 7 RASS |
| LOE 8 Utilities |
| LOE 9 GW |
O&M NS .pdf