CN-370000-HW686-DC02ECO2.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW686|26652fe61cf76d14a6798f2369f5dddb
Contract number
HW686
Issued by
Florida

About this file

This document comprises Task Assignment Change Orders (TACOs) issued by the State of Florida Department of Environmental Protection (FDEP) to Professional Service Industries, Inc. (Intertek-PSI) under Contract HW686. The change orders amend the original Task Assignment (DC002E) for equipment storage facility management and equipment disposition services at the Lakeland Storage Facility. The primary parties involved are FDEP, represented by Project Manager Mary Uribe, and Intertek-PSI, represented by Project Manager Joshua Newell. The documents include detailed cost estimates, level of effort worksheets, and supporting correspondence from multiple subcontractors providing transport and disposal services.

The contract encompasses eight subtasks focused on equipment storage management, system evaluation, facility coordination, and equipment transport and disposal. TACO-1 established the original task value at $64,858.25, while TACO-2 increased the total task value to $81,035.25, representing an increase of $16,177.00. The amended work includes quarterly equipment storage status reports (Subtasks 2-5), evaluation of existing SVE systems (Subtask 6), coordination of a new storage facility (Subtask 7), and transport and disposal of 23 systems (Subtask 8). Subcontractor WD Environmental Services was selected as the winning bidder at $13,700.00 for system removal and disposal. The task completion date is June 20, 2025, with final deliverables due April 12, 2025. Costs are allocated across labor (including Project Managers, Engineers, and Scientists at specified hourly rates), vehicle rental, equipment storage rental ($19,260.00 for quarterly storage), and field expenses. All units have been approved for scrapping by Surplus Property and Finance & Administration and will be disposed of in accordance with Policy ADM 320.

View the file

Other files

File Type Posted
CN-370000-HW686-DC003C.pdf PDF
CN-370000-HW686-DC004A.pdf PDF
CN-370000-HW686-DC004B.pdf PDF
CN-370000-HW686-DC006B.pdf PDF
CN-370000-HW686-DC006C.pdf PDF
CN-370000-HW686-DC008A.pdf PDF
CN-370000-HW686-DC008C.pdf PDF
CN-370000-HW686-DC009A.pdf PDF
CN-370000-HW686-DC010E.pdf PDF
CN-370000-HW686-DC011C.pdf PDF
CN-370000-HW686-DC012A.pdf PDF
CN-370000-HW686-DC013B.pdf PDF
CN-370000-HW686-DC013C.pdf PDF
CN-370000-HW686-DC01ACO5.pdf PDF
CN-370000-HW686-DC020A.pdf PDF
CN-370000-HW686-DC027A.pdf PDF
CN-370000-HW686-DC029A.pdf PDF
CN-370000-HW686-DC02ECO1.pdf PDF
CN-370000-HW686-DC030A.pdf PDF
CN-370000-HW686-DC03ACO1.pdf PDF
CN-370000-HW686-DC03DCO1.pdf PDF
CN-370000-HW686-DC04ACO1.pdf PDF
CN-370000-HW686-DC05CCO1.pdf PDF
CN-370000-HW686-DC05CCO2.pdf PDF
CN-370000-HW686-DC07BCO2.pdf PDF
CN-370000-HW686-DC07ECO1.pdf PDF
CN-370000-HW686-DC10ACO1.pdf PDF
CN-370000-HW686-DC11ACO1.pdf PDF
CN-370000-HW686-DC14BCO1.pdf PDF
CN-370000-HW686-DC19BCO1.pdf PDF
CN-370000-HW686-DC21BCO2.pdf PDF
CN-370000-HW686-DC21BCO3.pdf PDF
CN-370000-HW686-DC22ACO1.pdf PDF
CN-370000-HW686-DCO24B.pdf PDF
CN-370000-HW686-FIL11.pdf PDF
CN-370000-HW686-FIL4.pdf PDF
CN-370000-HW686-FIL5.pdf PDF
CN-370000-HW686-FIL7.pdf PDF
CN-370000-HW686-HW006A.pdf PDF
CN-370000-HW686-HW007A.pdf PDF
CN-370000-HW686-HW010A.pdf PDF
CN-370000-HW686-SA253.pdf PDF
CN-370000-HW686-SA253CO1.pdf PDF
CN-370000-HW686-DC001B.pdf PDF
CN-370000-HW686-DC002B.pdf PDF
CN-370000-HW686-DC002D.pdf PDF
CN-370000-HW686-DC003F.pdf PDF
CN-370000-HW686-DC004D.pdf PDF
CN-370000-HW686-DC005B.pdf PDF
CN-370000-HW686-DC006A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC002E 2 HW686

Mary Uribe • Responsibilities o As a Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor

Contractor Joshua Newell Contractor 863-712-4342 Various

Equipment Storage Facility

✔ $ 81,035.25 $ 64,858.25

$ 81,035.25 $ 64,858.25 Completion

Completion 06/20/2025 06/20/2025 0

1 1

Contractor

Digitally signed by Joshua S Newell Date: 2025.03.21 08:40:29-04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.03.20 16:55:17 -04'00'

Authorization for PSI to Scrap 23 units at the Lakeland Storage Yard.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW686 Task Assignment #: DC002E-2

Deliverables:

Deliverable Deliverable Due Date Subtask 2: Equipment Storage Status Report (Quarter 2) 7/20/2024 Subtask 3: Equipment Storage Status Report (Quarter 2) 10/20/2024 Subtask 4: Equipment Storage Status Report (Quarter 2) 1/20/2025 Subtasks 1 & 5: Equipment Storage Status Report (Quarter 1) & PM for Equipment Storage and System Tranfers 4/20/2025

Subtask 6: Report detailing the condition of existing sve systems for preparation of system transfers/ system scrapping 3/14/2025

Subtask 7: Email recommendations for new Storage Yard 3/28/2025 Subtask 8: Report detailing Scrapping of systems with photo documentation 4/12/2025

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced FDEP Approval of Subtask 2: Equipment Storage Status Report (Quarter 2) 10,761.99

FDEP Approval of Subtask 3: Equipment Storage Status Report (Quarter 3) 10,761.99

FDEP Approval of Subtask 4: Equipment Storage Status Report (Quarter 4) 10,761.99

FDEP Approval of Subtasks 1 & 5: Equipment Storage Status Report (Quarter 1) & PM for Equipment Storage and System Tranfers

15,248.64

Subtask 6:SVE System evaluation and report 2,574.02 Subtask 7: Search for new rental facility for storage yard and email recommendations 3,180.93

Subtask 8: Scrap Sve Systems 27,745.69

TOTAL COST $81,035.25

BWC TAFORM 01/18

FFLORIDA DEPARTMENT OF

EEnvironmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert

Secretary

Memorandum

TO: Multiple Sites

Lakeland Storage Facility

FROM: Mary Uribe, Project Manager

SUBJECT: Negotiation Summary

HW686 DC002E-2

DATE: March 20th, 2025

This TACO authorizes PSI to scrap systems at the Lakeland storage yard. All units have been approved for scrapping by Surplus Property and F&A. All units will be disposed of in accordance with “Procedures for Policy ADM 320”.

Total task amount is $81,035.25. PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is April 12, 2025.

Task completion date is June 20, 2025.

F D E P

C O S T

E S T I M A T E

C on tra ct or

Pr of es si on al

S er vi ce

In du st rie s, In c.

(I nt er te k-

PS

I) at e:

3/ 4/

Ta sk

Su bT as k

Pr oj ec t M an ag em en t

Su bT as k

Ev al ua te E xi st in g

Sy st em s

Si te

Eq ui pm en t S to ra ge F ac ili ty as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

C oo rd in at e

N ew

L ay

-d ow n Ya rd

Ac tiv ity /P ha se as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Tr an sp or t O ve rs ig ht a nd

D oc um en ta tio n

Pr oj ec t M an ag er

N an a W es tm ar k as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Su bT as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

To ta ls

La bo r R at e

C at eg or y $5

8.

Pr oj ec t M an ag er

.8 $6

4.

Pr in ci pa l C on su lta nt

$6

0.

Se ni or E ng in ee r, M R

$5 8.

Se ni or

G eo lo gi st , N

W

$6

0.

Se ni or G eo lo gi st

, M R

$0 .0

C er tif ie d

In du st ria l H yg ie nt is t

$0 .0

C er tif ie d

H az ar do us M at er ia ls

M an ag er

$0 .0

Fl or id a Li ce ns ed A sb es to s

C on su lta nt

$5

8.

Pr oj ec t M an ag er

$4

8.

Pr oj ec t E ng in ee r, JN

$6

2.

Pr oj ec t E ng in ee r, G R

$4 2.

Pr oj ec t E ng in ee r, M

K

$3

7.

Pr oj ec t G eo lo gi st

, S

AM

$3 9.

Pr oj ec t S ci en tis t, SL

$3 3.

Pr oj ec t S ci en tis t, SB

$2 9.

Pr oj ec t S ci en tis t, R

F

$0

.0

Q A

O ffi ce r

$0 .0

R em ed ia tio n Sp ec ia lis t, R H

$3 4.

G

IS

C

AD

S pe ci al is t, D G

$2 5.

St af f S ci en tis t, M

$2 5.

St af f S ci en tis t, Q H

$2

4.

St af f S ci en tis t, O

G

$3

0.

En vi ro nm en ta l S pe ci al is t, C C

$2 8.

En vi ro nm en ta l S pe ci al is t, D

K

$2

0.

Ad m in is tra tiv e As si st an t, BM

$0

.0

$0 .0

To ta l H ou rs

D ire ct L ab or

$1

4, 3.

$1 ,6

.8

$1

,6

.4

$1 ,6

.4

$1

,6

.4

$1 ,6

.4

$8

.8

$1

,1

.0

$4 ,0

.4

$0

.0

$0 .0

O ve rh ea d

1.

$2

1, 9.

$2 ,4

.8

$2

,4

.2

$2 ,4

.2

$2

,4

.2

$2 ,4

.2

$1

,2

.6

$1 ,7

.7

$6

,0

.5

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

R E V

C E F

P S I

I n t e r t e k

P a g e

E P

C O S T

E S T I M A T E

C on tra ct or

Pr of es si on al

S er vi ce

In du st rie s, In c.

(I nt er te k-as k

Pr oj ec t M an ag em en t

Su bT as k

Ev al ua te E xi st in g

Sy st em s

Si te

Eq ui pm en t S to ra ge F ac as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

C oo rd in at e

N ew

L ay

-d ow n Ya rd

Ac tiv ity /P ha as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Tr an sp or t O ve rs ig ht a nd

D oc um en ta tio n

Pr oj ec t M an ag er

N an a W es tm as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Su bT as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

To ta ls

Fr in ge

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L

$3 5, 3.

$4

,0

.7

$4 ,0

.7

$4

,0

.7

$4 ,0

.7

$4

,0

.7

$2 ,0

.4

$2

,8

.7

$1 0, 6.

$0

.0

$0 .0

Tr av el Ve hi cl e R en ta l $3

,1

.0

$4

.0

$4

.0

$4

.0

$4

.0

$2

.0

$0 .0

$9

.0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$3 ,1

.0

$4

.0

$4

.0

$4

.0

$4

.0

$2

.0

$0

.0

$9

.0

$0 .0

$0

.0

Su bc on tr ac to r (E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t S to ra ge re nt al $1

9, 0.

$4 ,8

.0

$4

,8

.0

$4 ,8

.0

$4

,8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To w C om pa ny $1

3, 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 3, 0.

$0

.0

$0 .0

D is po sa l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $3

2, 0.

$4 ,8

.0

$4

,8

.0

$4 ,8

.0

$4

,8

.0

$0 .0

$0

.0

$1 3, 0.

$0

.0

$0 .0

H an dl in g

Fe e

$3 ,2

.0

$4

.5

$4

.5

$4

.5

$4

.5

$0

.0

$0 .0

$1

,3

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$3 6, 6.

$5

,2

.5

$5 ,2

.5

$5

,2

.5

$5 ,2

.5

$0

.0

$0 .0

$1

5, 0.

$0 .0

$0

.0

La bo ra to ry

An al yt ic al C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d Ex pe ns es

Pe rs on al

P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$1 ,1

.0

$2

.0

$2

.0

$2

.0

$2

.0

$4

0.

$0 .0

$3

.0

$0

.0

$0 .0

Eq ui pm en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$1 ,5

.0

$3

.0

$3

.0

$3

.0

$3

.0

$0

.0

$0 .0

$3

.0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $2

,6

.0

$5

.0

$5

.0

$5

.0

$5

.0

$4 0.

$0

.0

$6

.0

$0 .0

$0

.0

Su bt ot al

$7 7, 9.

$4

,0

.7

$1 0, 4.

$1

0, 4.

$1 0, 4.

$1

0, 4.

$2 ,3

.4

$2

,8

.7

$2 6, 6.

$0

.0

$0 .0

C om pl et io n Fe e $3

,5

.3

$4

.8

$4

.7

$4

.7

$4

.7

$4

.7

$2

.5

$2

.1

$1 ,0

.7

$0

.0

$0 .0

To ta l E st im at ed C os t

$8 1, 5.

$4

,4

.6

$1 0, 1.

$1

0, 1.

$1 0, 1.

$1

0, 1.

$2 ,5

.0

$3

,1

.9

$2 7, 5.

$0

.0

$0 .0

R E V

C E F

P S I

I n t e r t e k

P a g

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Equipment Storage Facility SubTask 2 Quarter 1 - Equipment Storage Management

DATE: 3/4/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist Compile equipment list, photographs 5 Submit current equipment list to FDEP 1

Total Hours: 6 Staff Scientist Quarterly site visits Total Hours: 50

TOTAL LABOR 56

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Truck, site visit $120.00 day 0 $0.00 $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Equipment Storage rental 3 monthly $1,605.00 $4,815.00 $0.00

TOTAL $4,815.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Construction / O&M Supplies $75.00 day 0 $0.00

$300.00 weekly 1 $300.00 Expendables 0 0 $40.00 day 5 0 $200.00

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $500.00

FINAL --7/24/96

Page 3 TA DC002E TACO-2 PSI Equipment Storage 2024-2025

SubTask 3 Qtr 3 - Equipment Storage Management

DATE: 3/4/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist Compile equipment list, photographs 5 Submit current equipment list to FDEP 1

Total Hours 6 Remediation Specialist Quarterly site visits Total Hours: 50

TOTAL LABOR 56

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Truck, site visit $120.00 day 0 $0.00 $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Equipment Storage rental 3 monthly $1,605.00 $4,815.00 $0.00

TOTAL $4,815.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Construction / O&M Supplies $75.00 day 0 $0.00

$300.00 weekly 1 $300.00 Expendables 0 0 $40.00 day 5 0 $200.00

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $500.00

Page 4 TA DC002E TACO-2 PSI Equipment Storage 2024-2025

SubTask 4 Qtr 4 - Equipment Storage Management

DATE: 3/4/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist Compile equipment list, photographs 5 Submit current equipment list to FDEP 1

Total Hours 6 Remediation Specialist Quarterly site visits Total Hours: 50

TOTAL LABOR 56

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Truck, site visit $120.00 day 0 $0.00 $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Equipment Storage rental 3 monthly $1,605.00 $4,815.00 $0.00

TOTAL $4,815.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Construction / O&M Supplies $75.00 day 0 $0.00

$300.00 week 1 $300.00 Expendables 0 0 $40.00 day 5 0 $200.00

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $500.00

Page 5 TA DC002E TACO-2 PSI Equipment Storage 2024-2025

SubTask 5 Qtr 1 - Equipment Storage Management

DATE: 3/4/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist Compile equipment list, photographs 5 Submit current equipment list to FDEP 1

Total Hours 6 Remediation Specialist Quarterly site visits Total Hours: 50

TOTAL LABOR 56

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Truck, site visit $120.00 day 0 $0.00 $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Equipment Storage rental 3 monthly $1,605.00 $4,815.00 $0.00

TOTAL $4,815.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Construction / O&M Supplies $75.00 day 0 $0.00

$300.00 week 1 $300.00 Expendables 0 0 $40.00 day 5 0 $200.00

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $500.00

Page 6 TA DC002E TACO-2 PSI Equipment Storage 2024-2025

SubTask 6 Evaluate Existing Systems

DATE: 3/3/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Engineer, J Newell Travel to the Lakeland Storage Yard (2 hrs round trip) 2 Evaluate physical system (0.25 hrs/system x 26 systems) 6.5 Print and review existing literature on age/use/notes for each system for consideration in the fiel 1 Provide observations and recommendations in a letter report 2

Total Hours: 11.5

Staff Scientist, M Matar Travel to the Lakeland Storage Yard (3 hrs round trip) 3 Evaluate physical system (0.5 hrs/system x 26 systems) 6.5 Print and review existing literature on age/use/notes for each system for consideration in the field.

Total Hours: 9.5

TOTAL LABOR 21

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Truck, site visit $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Expendables 0 0 $40.00 day 1 0 $40.00

$0.00 $0.00

TOTAL EQUIPMENT $40.00

Page 7 TA DC002E TACO-2 PSI Equipment Storage 2024-2025

SubTask 7 Coordinate New Lay-down Yard

DATE: 3/3/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Engineer, J Newell Review I-4 Corridor for existing rental spaces 2 Coordinate with rental facilities to determine availbale locations 21 Ensure recommendations meet the intent of the lay-down yard 1

Total Hours 24

TOTAL LABOR 24

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Truck, site visit $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Rental Deposits and/or increased rent $0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Construction / O&M Supplies $75.00 day 0 $0.00 Expendables 0 0 $40.00 day 0 0 $0.00

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 8 TA DC002E TACO-2 PSI Equipment Storage 2024-2025

SubTask 8 Transport Oversight and Documentation

DATE: 3/3/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Engineer, J Newell Combine transport documentation into a report deliverable with photo documentation 8 Total Hours 8

Project Scientist, S Luth Travel to Lakeland Storage Yard 3 hrs round trip (assume completion in 4 days) 12 Coordinate and document trailers being picked up and confirm 40 transport documentation to the correct destination (10 hours per day, assumes completion in 4 days) Upload transport documentation and photos, segregate and label photos by ID 4

Total Hours 56

Staff Scientist, M Matar Travel to New Storage Yard 3 hrs round trip (assume completion in 4 days 12 Coordinate trailer delivery and photograph trailer as receipt of accpetance. 40 (10 hours per day, assumes completion in 4 days) Upload transport documentation and photos, segregate and label photos by ID 4

Total Hours 56

TOTAL LABOR 120

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Truck, (2 trucks at 2 different locations 4 days each) $120.00 day 8 $960.00 $480.00 week 0 $0.00

TOTAL VEHICLE $960.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME Rate UNIT $0.00

WD Environmental 13,700.00$ Lump Sum 13,700.00$

TOTAL $13,700.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Construction / O&M Supplies to secure trailer items for transport $75.00 day 4 $300.00

$300.00 week 0 $0.00 Expendables 0 0 $40.00 day 8 0 $320.00

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $620.00

Transport and Dispose of 23 systems

PURPOSE

Page 1 TA DC002E TACO-2 PSI Equipment Storage 2024-2025

E P

C O S T

E S T I M A T E

C on tra ct or

Pr of es si on al

S er vi ce

In du st rie s, In c.

(I nt er te k-as k

Pr oj ec t M an ag em en t

Su bT as k

Ev al ua te E xi st in g

Sy st em s

Si te

Eq ui pm en t S to ra ge F ac as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

C oo rd in at e

N ew

L ay

-d ow n Ya rd

Ac tiv ity /P ha as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Tr an sp or t O ve rs ig ht a nd

D oc um en ta tio n

Pr oj ec t M an ag er

N an a W es tm as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Su bT as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

To ta ls

La bo r R at e

C at eg or y $5

8.

Pr oj ec t M an

0.

$6

4.

Pr in ci pa l C on su lta nt

$6

0.

Se ni or E ng in ee r, M R

$5 8.

Se ni or

G eo lo gi st , N

W

$6

0.

Se ni or G eo lo gi st

, M R

$0 .0

C er tif ie d

In du st ria l H yg ie nt is t

$0 .0

C er tif ie d

H az ar do us M at er ia ls

M an ag er

$0 .0

Fl or id a Li ce ns ed A sb es to s

C on su lta nt

$5

8.

Pr oj ec t M an ag er

$4

8.

Pr oj ec t E ng in ee r, JN

$6

2.

Pr oj ec t E ng in ee r, G R

$4 2.

Pr oj ec t E ng in ee r, M

K

$3

7.

Pr oj ec t G eo lo gi st

, S

AM

$3 9.

Pr oj ec t S ci en tis t, SL

$3 3.

Pr oj ec t S ci en tis t, SB

$2 9.

Pr oj ec t S ci en tis t, R

F

$0

.0

Q A

O ffi ce r

$0 .0

R em ed ia tio n Sp ec ia lis t, R H

$3 4.

G

IS

C

AD

S pe ci al is t, D G

$2 5.

St af f S ci en tis t, $2

5.

St af f S ci en tis t, $2 4.

St af f S ci en tis t, O G

$3 0.

En vi ro nm en ta l S pe ci al is t, C

C

$2

8.

En vi ro nm en ta l S pe ci al is t, D K

$2 0.

Ad m in is tra tiv e

As si st an t, BM

$0 .0

$0

.0

To ta l H ou rs

D ire ct L

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

1.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

R E V

C E F

P S I

I n t e r t e k

P a g

E P

C O S T

E S T I M A T E

C on tra ct or

Pr of es si on al

S er vi ce

In du st rie s, In c.

(I nt er te k-as k

Pr oj ec t M an ag em en t

Su bT as k

Ev al ua te E xi st in g

Sy st em s

Si te

Eq ui pm en t S to ra ge F ac as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

C oo rd in at e

N ew

L ay

-d ow n Ya rd

Ac tiv ity /P ha as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Tr an sp or t O ve rs ig ht a nd

D oc um en ta tio n

Pr oj ec t M an ag er

N an a W es tm as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Su bT as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

To ta ls

Fr in ge

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Tr av el Ve hi cl e R en ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (E qu ip m en t P ro cu re m

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t S to ra ge re nt al $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To w C om pa ny $1

3, 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 3, 0.

$0

.0

$0 .0

D is po sa l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $1

3, 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 3, 0.

$0

.0

$0 .0

H an dl in g

Fe e

$1 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

,3

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$1 5, 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

5, 0.

$0 .0

$0

.0

La bo ra yt ic al C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d Ex pe on al

P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

An al yt ic al re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bt ot al

$1 5, 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 5, 0.

$0

.0

$0 .0

C om pl et io n Fe e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$1 5, 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 5, 0.

$0

.0

$0 .0

R E V

C E F

P S I

I n t e r t e k

P a g

SubTask 8 Transport Oversight and Documentation

DATE: 3/3/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Engineer, J Newell Combine transport documentation into a report deliverable with photo documentation 0 Total Hours 0

Project Scientist, S Luth Travel to Lakeland Storage Yard 3 hrs round trip (assume completion in 4 days) 0 Coordinate and document trailers being picked up and confirm 0 transport documentation to the correct destination (10 hours per day, assumes completion in 4 days) Upload transport documentation and photos, segregate and label photos by ID 0

Total Hours 0

Staff Scientist, M Matar Travel to New Storage Yard 3 hrs round trip (assume completion in 4 days 0 Coordinate trailer delivery and photograph trailer as receipt of accpetance. 0 (10 hours per day, assumes completion in 4 days) Upload transport documentation and photos, segregate and label photos by ID 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Truck, (2 trucks at 2 different locations 4 days each) $120.00 day 0 $0.00 $480.00 week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE UNIT USEAGE

$0.00

WD Environmental 13,700.00$ Lump Sum 13,700.00$

TOTAL $13,700.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Construction / O&M Supplies to secure trailer items for transport $75.00 day 0 $0.00

$300.00 week 0 $0.00 Expendables 0 0 $40.00 day 0 0 $0.00

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Transport and Dispose of 23 systems

Page 3 TA DC002E Delta TACO-2 PSI Equipment Storage 2024-2025

E P

C O S T

E S T I M A T E

C on tra ct or

Pr of es si on al

S er vi ce

In du st rie s, In c.

(I nt er te k-as k

Pr oj ec t M an ag em en t

Su bT as k

Ev al ua te E xi st in g

Sy st em s

Si te

Eq ui pm en t S to ra ge F ac as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

C oo rd in at e

N ew

L ay

-d ow n Ya rd

Ac tiv ity /P ha as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Tr an sp or t O ve rs ig ht a nd

D oc um en ta tio n

Pr oj ec t M an ag er

N an a W es tm as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Su bT as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

To ta ls

La bo r R at e

C at eg or y $5

8.

Pr oj ec t M an

.0 $6

4.

Pr in ci pa l C on su lta nt

$6

0.

Se ni or E ng in ee r, M R

$5 8.

Se ni or

G eo lo gi st , N

W

$6

0.

Se ni or G eo lo gi st

, M R

$0 .0

C er tif ie d

In du st ria l H yg ie nt is t

$0 .0

C er tif ie d

H az ar do us M at er ia ls

M an ag er

$0 .0

Fl or id a Li ce ns ed A sb es to s

C on su lta nt

$5

8.

Pr oj ec t M an ag er

$4

8.

Pr oj ec t E ng in ee r, JN

$6

2.

Pr oj ec t E ng in ee r, G R

$4 2.

Pr oj ec t E ng in ee r, M

K

$3

7.

Pr oj ec t G eo lo gi st

, S

AM

$3 9.

Pr oj ec t S ci en tis t, SL

$3 3.

Pr oj ec t S ci en tis t, SB

$2 9.

Pr oj ec t S ci en tis t, R

F

$0

.0

Q A

O ffi ce r

$0 .0

R em ed ia tio n Sp ec ia lis t, R H

$3 4.

G

IS

C

AD

S pe ci al is t, D G

$2 5.

St af f S ci en tis t, $2 5.

St af f S ci en tis t, $2

4.

St af f S ci en tis t, O

G

$3

0.

En vi ro nm en ta l S pe ci al is t, C C

$2 8.

En vi ro nm en ta l S pe ci al is t, D

K

$2

0.

Ad m in is tra tiv e As si st an t, BM

$0

.0

$0 .0

To ta l H ou rs

D ire ct L

$1

3, 3.

$1 ,5

.7

$1

,6

.4

$1 ,6

.4

$1

,6

.4

$1 ,6

.4

$8

.8

$1

,1

.0

$3 ,6

.6

$0

.0

$0 .0

O ve rh ea d

1.

$2

0, 4.

$2 ,3

.2

$2

,4

.2

$2 ,4

.2

$2

,4

.2

$2 ,4

.2

$1

,2

.6

$1 ,7

.7

$5

,5

.8

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

R E V

C E F

P S I

I n t e r t e k

P a g

E P

C O S T

E S T I M A T E

C on tra ct or

Pr of es si on al

S er vi ce

In du st rie s, In c.

(I nt er te k-as k

Pr oj ec t M an ag em en t

Su bT as k

Ev al ua te E xi st in g

Sy st em s

Si te

Eq ui pm en t S to ra ge F ac as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

C oo rd in at e

N ew

L ay

-d ow n Ya rd

Ac tiv ity /P ha as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Tr an sp or t O ve rs ig ht a nd

D oc um en ta tio n

Pr oj ec t M an ag er

N an a W es tm as k

Q tr

- E qu ip m en t S to ra ge

M an ag em en t

Su bT as k

Su bT as k

Q tr

- E qu ip m en t S to ra ge M an ag em en t Su bT as k

To ta ls

Fr in ge

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L

$3 4, 7.

$3

,9

.9

$4 ,0

.7

$4

,0

.7

$4 ,0

.7

$4

,0

.7

$2 ,0

.4

$2

,8

.7

$9 ,1

.4

$0

.0

$0 .0

Tr av el Ve hi cl e R en ta l $3

,1

.0

$4

.0

$4

.0

$4

.0

$4

.0

$2

.0

$0 .0

$9

.0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$3 ,1

.0

$4

.0

$4

.0

$4

.0

$4

.0

$2

.0

$0

.0

$9

.0

$0 .0

$0

.0

Su bc on tr ac to r (E qu ip m en t P ro cu re m

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t S to ra ge re nt al $1

9, 0.

$4 ,8

.0

$4

,8

.0

$4 ,8

.0

$4

,8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To w C om pa ny $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D is po sa l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $1

9, 0.

$4 ,8

.0

$4

,8

.0

$4 ,8

.0

$4

,8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$1 ,9

.0

$4

.5

$4

.5

$4

.5

$4

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$2 1, 6.

$5

,2

.5

$5 ,2

.5

$5

,2

.5

$5 ,2

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra yt ic al C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d Ex pe on al

P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$1 ,1

.0

$2

.0

$2

.0

$2

.0

$2

.0

$4

0.

$0 .0

$3

.0

$0

.0

$0 .0

Eq ui pm en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$1 ,5

.0

$3

.0

$3

.0

$3

.0

$3

.0

$0

.0

$0 .0

$3

.0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $2

,6

.0

$5

.0

$5

.0

$5

.0

$5

.0

$4 0.

$0

.0

$6

.0

$0 .0

$0

.0

Su bt ot al

$6 1, 3.

$3

,9

.9

$1 0, 4.

$1

0, 4.

$1 0, 4.

$1

0, 4.

$2 ,3

.4

$2

,8

.7

$1 0, 6.

$0

.0

$0 .0

C om pl et io n Fe e $3

,4

.7

$3

.3

$4

.7

$4

.7

$4

.7

$4

.7

$2

.5

$2

.1

$9

.6

$0 .0

$0

.0

To ta l E st im at ed C os t

$6 4, 8.

$4

,3

.2

$1 0, 1.

$1

0, 1.

$1 0, 1.

$1

0, 1.

$2 ,5

.0

$3

,1

.9

$1 1, 6.

$0

.0

$0 .0

R E V

C E F

P S I

I n t e r t e k

P a g

WD ENVIRONMENTAL SERVICES, INC.

1013 BRIARWOOD DRIVE

WAUCHULA, FL 33873

8637816971 wdenviro@gmail.com

Estimate

ADDRESS

INTERTEK

PSI/Intertek 5801 Benjamin Center Drive Suite 112 Tampa FL 33634

ESTIMATE # DATE

1633 03/19/2025

ACTIVITY QTY RATE AMOUNT

Project Name:

FDEP Lakeland Storage Yard Removal and Disposal of Trailers 17 575.00 9,775.00

Removal and Disposal of Containers 3 675.00 2,025.00

Removal and Disposal of 10x10 sheds 2 700.00 1,400.00

Removal and Disposal of Cabines 1 500.00 500.00

TOTAL $13,700.00

Accepted By Accepted Date

WD - Winning Bid - $13,700 o o o

RSI - High Bid - $700/unit x 23 systems = $16,100

Action - Highest Bid - Decline to Bid

File details come from the government source that posted it. Updated .