This document package consists of a Task Assignment (TA) executed under Contract HW686 between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (Intertek-PSI). The task assignment covers site assessment activities at the Sterling Cleaners facility located at 218 37th Avenue North in St. Petersburg, Pinellas County, Florida. The project is identified by ERIC number 5319 and involves multiple subcontractors including drilling services, surveying firms, utility locating companies, and waste disposal vendors working under the primary FDEP contract for drycleaning solvent cleanup program services.
The scope of work encompasses four primary subtasks: project management, first mobilization geoprobe activities (direct push technology, soil sampling, monitoring well installation, and magnetic acoustic gravity screening testing), groundwater sampling with investigative derived waste disposal, and site assessment reporting. The total task value is $73,008.46 on a fixed unit rate basis, with deliverables scheduled through December 31, 2026, and task completion by February 27, 2027. Cost breakdowns include $54,230.41 for subtask 2 (drilling and assessment), $4,889.48 for subtask 3 (groundwater sampling), and $13,888.57 for subtasks 1 and 4 (project management and reporting). Subcontractors were competitively bid, with drilling services awarded to ATI Companies at $15,830.00, surveying to United Survey and Mapping Inc. at $1,930.00, utility locating to GeoTek Services at $750.00, and waste disposal to Erwin at competitive rates ranging from $110-$125 per drum depending on waste type and location.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW686
DC030A Completion February 27, 2027
Site Assessment
Mary Uribe 850-245-8990 Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor
Contractor Joshua Newell Contractor 863-712-4342
ERIC_5319
Formerly 182 37th Avenue North (Currently 218 37th Avenue North) St. Petersburg, Pinellas County
Sterling Cleaners
Contractor Contractor
✔ $ 73,008.46
$ 73,008.46
Scope of Work
Professional Service Industries, Inc. (Intertek-PSI) Contractor Douglas Coleman PMP, CHMM, REM
Contract Manager
Douglas Coleman Digitally signed by Douglas Coleman Date: 2026.03.31 11:34:41 -04'00'
Jennnifer Farrell
Digitally signed by Jennifer Farrell Date: 2026.03.31 10:02:48 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: GPR, DPT, MAGS Assessment, MW Installation, Survey 07/31/2026
Subtask 3: GW Sampling 09/30/2026
Subtask 1: Project Management Subtask 4: Site Assessment Report 12/31/2026
Subtask 2: DEP approval of GPR, DPT, MAGS Assessment, MW Installation, Survey $ 54,230.41
Subtask 3: DEP approval of GW Sampling $ 4,889.48
Subtask 1: DEP approval of Project Management Subtask 4: DEP approval of Site Assessment Report $ 13,888.57
$ 73,008.46
HW686
DC030A
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins Lt. Governor
Alexis Lambert Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE:
ERIC_
Cleaners
Mary Uribe, Project Manager
Negotiation Summary
HW686 DC0
PSI will perform activities at Cleaners, as detailed in the proposal.
Total task amount is $ . PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is
. Task completion date is .
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
P ro fe ss io na l S er vi ce
In du st rie s, In c.
(I nt er te k-
P S
I)
D at e:
3/
/2
Ta sk ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
S te rli ng C le an er s
E R
IC
_5
Ta sk
G P
R , D
P T, M A
G s
A ss es sm en t, M W
In st al l, S ur ve y
S ub
Ta sk
A ct iv ity
/P ha se
In iti al S ite A ss es sm en t
Ta sk
G ro un dw at er S am pl in g
S ub
Ta sk
P ro je ct
M an ag er
D ou g
C ol em an
Ta sk
S ite
A ss es sm en t R ep or t S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
La bo r R at e
C at eg or y $6
4.
PP
ro je ct
M an ag er
.3
.3 $6
4.
S en io r S ci en tis t, D C
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$6 3.
S en io r E ng in ee r, G
R 1.
0.
0.
1.
0.
0.
0.
0.
0.
0.
$4
8.
P ro je ct
E ng in ee r, JN
.5
.5
6.
.0
0.
0.
0.
0.
0.
0.
$4 1.
P ro je ct S ci en tis t, S L
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 1.
P ro je ct S ci en tis t, JD
5.
.5
9.
.0
0.
0.
0.
0.
0.
0.
$3 4.
G
IS
C A
D S pe ci al is t, D
G 8.
0.
0.
8.
0.
0.
0.
0.
0.
0.
$2
1.
E nv iro nm en ta l S pe ci al is t, LD
.0
.0
.0 0.
0.
0.
0.
0.
0.
0.
$2
8.
E nv iro nm en ta l S pe ci al is t, D K
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 3.
A dm in is tra tiv e
A ss is ta nt , B
M 4.
0.
0.
4.
0.
0.
0.
0.
0.
0.
T ot al
H ou rs
6.
.3
5.
.0
.0 0.
0.
0.
0.
0.
0.
D ire ct L ab or
$1
1, 1.
$1 ,3
.4
$5
,5
.2
$8
.1
$3 ,7
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
1.
$1
7, 3.
$1 ,9
.5
$8
,3
.9
$1 ,3
.5
$5
,6
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab
$2 8, 4.
$3
,3
.9
$1 3, 7.
$2
,1
.7
$9 ,3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
PS
I In te rt ek Pa ge
FD
C O
ST
E
ST
IM
A
TE
C on tra ct or
P ro fe ss io na l S er vi ce
In du st rie s, In c.
(I nt er te k-
P
I) at e:
3/
/2
Ta sk
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
S te rli ng C le an er s
E R
IC
_5
Ta sk
G P
R , D
P T, M A
G s
A ss es sm en t, M W
In st al l, S ur ve y
S ub
Ta sk
A ct iv ity
/P ha se
In iti al S ite A ss es sm t
Ta sk
G ro un dw at er S am pl in g
S ub
Ta sk
P ro je ct
M an ag er
D ou g
C ol em an
Ta sk
S ite
A ss es sm en t R ep or t S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
TT
ra ve l
V eh ic le
R en ta l
$1 ,9
.0
$1
,6
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $ $1
,9
.0
$1 ,6
.0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m t)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(S er vi ce s P ro cu re m t) ril lin g (C on ve nt io na l)
$1 5, 0.
$1
5, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U ni te d
S ur ve y an d
M ap pi ng
, I nc
$1
,9
.0
$1 ,9
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E rw in
$5
.0
$0 .0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G eo
Te k
S er vi ce s, L
LC
$7
.0
$7
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $1
9, 5.
$1 8, 0.
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $1
,9
.5
$1 ,8
.0
$5
9.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$2 1, 5.
$2
0, 1.
$6
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
La bo ra to ry
A na ly tic al
C os ts $1
6, 3.
$1 5, 6.
$1
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fa st T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e S hi pp in g
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or at or y $1
6, 3.
$1 5, 6.
$1
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en se s
P er so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$3
.0
$3
.0
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $4
.0
$4
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$1
,2
.1
$8
.0
$4
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
F ie ld E xp en se s
$2 ,0
.1
$1
,5
.0
$4
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $7
0, 3.
$3 ,3
.9
$5
2, 7.
$4 ,6
.3
$9
,3
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$2 ,8
.4
$3
.6
$1
,3
.7
$2
.1
$9
.9
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al E st im at ed
C os t $7
3, 8.
$3 ,6
.6
$5
4, 0.
$4 ,8
.4
$1
0, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
PS
I In te rt ek Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Sterling Cleaners ERIC_5319 SubTask 2 GPR, DPT, MAGs Assessment, MW Install, Survey
DATE: 3/19/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
6.2 - 6.4 Lithologic Boring, Geoprobe Soil Sampling, Groundwater Screenpoint Sampling
Project Engineer, J Newell Field Work Coordination and Technical oversight 4
Total Hours 4
Project Scientist, J Daugherty Field event preparation 1 Travel (2 hour round trip X 6 days) 12 Soil and groundwater screening activities (6 days) 24 Oversee installation, drilling and screening activities (6 days) 18 sampling & measurements 8
Total Hours 63
Environmental Specialist, L Dame Travel (2 hour round trip X 6 days) 12 Soil and groundwater screening activities (6 days) 24 Oversee installation, drilling and screening activities (6 days) 18 sampling & measurements 8 Pick-up, drop off samples 2
Total Hours 64
6.5 MAGS Well Installation
Project Engineer, J Newell Technical oversight 2 Total Hours 2
Project Scientist, J Daugherty Travel (2 hour roundtrip x 1 day) 2 Well install oversight and documentation 6
Total Hours 8
Environmental Specialist, L Dame Travel (2 hour roundtrip x 1 days) 2 Survey TOC elevations 3
Total Hours 5
FINAL --7/24/96
Page 3 Sterling Cleaners (Publix) - Initial Mobilization LOE - Rev 2
SubTask 2 GPR, DPT, MAGs Assessment, MW Install, Survey
DATE: 3/19/2026
6.6 MAGS Test
Project Scientist, J Daugherty Travel, (2 hr per roundtrip x 1 day) 2 Obtain DTW for MAGS evaluation 1 Set up existing system for MAGS 1 Collect vacuum readings at each well head 4.5 Dismantle MAGS equipment & site restoration 1
Hours: 9.5
Project Engineer, J Newell Travel, (2 hr per roundtrip x 1 day) 2 MAGS form preparation 1 Set up existing system for MAGS 1 Document event activities and provide technical guidance 4.5 Dismantle MAGS equipment & site restoration 1
Hours: 9.5
Total Hours Project Engineer, J Newell Hours: 15.5 Environmental Specialist, L Dame Hours: 69 Project Scientist, J Daugherty Hours: 80.5
TOTAL LABOR 165
Page 4 Sterling Cleaners (Publix) - Initial Mobilization LOE - Rev 2
SubTask 2 GPR, DPT, MAGs Assessment, MW Install, Survey
DATE: 3/19/2026
VEHICLE TYPE RATE UNIT USEAGE
Truck, site visit (Mobilize from Tampa) $480.00 week 1 $480.00 Truck, site visit (Mobilize from Tampa) $120.00 day 3 $360.00 Truck, site visit (Mobilize from Plant City) $480.00 week 1 $480.00 Truck, site visit (Mobilize from Plant City) $120.00 day 3 $360.00
TOTAL VEHICLE $1,680.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNITS COST
$0.00 GeoTek Services, LLC GPR Utilities for Assessment 1 $750.00 $750.00 ATI Drilling Drilling Services 1 $15,830.00 $15,830.00 United Survey and Mapping, Inc. Survey new MW Installed 1 $1,930.00 $1,930.00
TOTAL $18,510.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00
Soil Sampling $0.00 Soil - 8260 full $110.00 35 $3,850.00 Soil SPLP Prep Fee $6.30 35 $220.50 Soil - Contingent SPLP $45.00 35 $1,575.00 (TACO to be submitted to reflect Actual Quanity) Contingent Soil Leachate - 8260 Full $110.00 35 $3,850.00 (TACO to be submitted to reflect Actual Quanity)
Soil Vapor Sampling $0.00 TO-15 (VOCs) $200.00 7 $1,400.00 Summa cannisters $33.00 7 $231.00 Shipping, large, overnight (Summa) $150.00 2 $300.00
Groundwater Sampling Groundwater - 8260 Full $110.00 35 $3,850.00
TOTAL LAB $15,276.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Monitoring Well Installation Kit $325.00 day 1 $325.00 MAGS Investigation Kit $500.00 day 1 $500.00 Expendables $40.00 day 8 $320.00 Soil - SPLP Encore Sampler $16.00 each 28 $448.00
$0.00
TOTAL EQUIPMENT $1,593.00
Page 5 Sterling Cleaners (Publix) - Initial Mobilization LOE - Rev 2
SubTask 3 Groundwater Sampling
DATE: 3/19/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
6.9 Monitoring Well Sampling, Top-of-Casing Survey
Project Engineer, J Newell Technical oversight 2 Profile IDW for transport and disposal (T&D) 2 Execute manifest 1 Notification to tenant/owner 1
Total Hours 6
Project Scientist, J Daugherty Field event preparation 1 Travel (2 hour round trip X 1) 2 Collect 3 existing shallow well GW samples 3 Collect 1 existing deep well GW sample 1 Stage/label IDW 1 Collect IDW samples from Purge/Development IDW and Soil Cuttings 1
Total Hours: 9
Environmental Specialist, L Dame Travel (2 hour round trip X 1) 2 Collect groundwater elevations 1 Collect 4 new shallow well GW samples 4 Collect 1 new deep well GW sample 1 Pick-up, drop off samples 2
Total Hours 10
TOTAL LABOR 25
Page 6 Sterling Cleaners (Publix) - Initial Mobilization LOE - Rev 2
SubTask 3 Groundwater Sampling
DATE: 3/19/2026
VEHICLE TYPE RATE UNIT USEAGE
Truck, site visit (Mobilize from Tampa) $120.00 day 1 $120.00 Truck, site visit (Mobilize from Plant City) $120.00 day 1 $120.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNITS COST
$0.00 Erwin Soil DW T&D, per drum 2 $110.00 $220.00
Water IDW T&D, per drum 3 $125.00 $375.00 $0.00
TOTAL $595.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Groundwater Sampling Groundwater - 8260 VOH's $73.00 9 $657.00
IDW Sampling TCLP Bottle Extraction Soil/cuttings - TCLP 8260 VOH $210.00 1 $210.00 Soil/cuttings - TCLP RCRA 4 Metals $135.00 1 $135.00 Water - 8260 VOH's $73.00 1 $73.00 Water - RCRA 4 Metals $52.00 1 $52.00
TOTAL LAB $1,127.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Shallow Groundwater Sampling Kit $208.55 day 2 $417.10 Expendables $40.00 day 1 $40.00
$0.00
TOTAL EQUIPMENT $457.10
Page 7 Sterling Cleaners (Publix) - Initial Mobilization LOE - Rev 2
SubTask 4 Site Assessment Report
DATE: 3/19/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, G Robinson Evaluate data in report text, raw data, tables, figures, recommendations 1 Total Hours: 1
Project Engineer, J Newell Evaluate data and draft figure edits 8 Draft MAGS tables (field and soil vapor) 8 Draft MAGS charts 3 Generate MAGS conclusions 3 Generate GW conclusions 2 Prepare recommendations 4 Cross-check data in report text against raw data, tables & figures 4 Update report following evaluation 4
Sign and seal documents 1 Total Hours 37
Project Scientist, J Daugherty Draft report text 16 Create soil tables (analytical) 8 Create well tables (construction and elevations) 6 Create groundwater tables (parameters and analytical) 6
Total Hours: 36
GIS/CAD Specialist, D Grove Create maps, develop figures 8
Administrative Assistant, B Meynardie Finalize report 4
TOTAL 86
VEHICLE TYPE RATE UNIT USEAGE
$420.00 week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNITS COST
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Groundwater Sampling $0.00
IDW Sampling $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00
TOTAL EQUIPMENT $0.00
Page 8 Sterling Cleaners (Publix) - Initial Mobilization LOE - Rev 2
PSI Proposal: 0552-442355R2 Revised March 19, 2026 www.intertek.com/building
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Attention: Ms. Mary Uribe, Environmental Consultant Telephone: (850) 245-8990 Email: Mary.Uribe@FloridaDEP.gov
Re: Proposal for Initial Site Assessment Activities Revision 2 Sterling Cleaners Formerly 182 37th Avenue North (Currently 218 37th Avenue North) St. Petersburg, Pinellas County, Florida
ERIC_5319
Dear Ms. Uribe:
Professional Service Industries, Inc. (PSI), an Intertek Company, is pleased to provide this proposal for conducting initial site assessment activities at the former “Sterling Cleaners” located at 218 37th Ave. N in St. Petersburg, Pinellas County, Florida. Included with this proposal is a brief summary of the project background to date, proposed scope of work, cost estimate and a proposed schedule for completion. A Site Access form was signed by the property owner “Publix Supermarkets, Inc.” in 2023.
PROJECT BACKGROUND
The Northeast shopping Center was constructed in 1958 and drycleaning operations for Sterling Cleaners became active around 1970. A preliminary Contamination Assessment Plan for Sterling Cleaners was proposed in August 1992 after it was revealed that groundwater samples at a nearby site were found to contain elevated levels of drycleaning related compounds. In April 1996, an initial site screening was conducted which included soil sampling. The most contaminated soil sample, located near the former drycleaning machine, was found to contain 258.6 mg/kg tetrachloroethene. The site was determined to be eligible for state-funded clean up in May 1996 and was issued an Eligibility Letter with a site score of
65. In 1997, the drycleaning facility was permanently closed and a renovation that removed the southeast wing of the shopping center (including the site of the former drycleaner) began. During this renovation, limited remediation efforts (soil excavation) were made to remove soils with concentrations of tetrachloroethene (PCE) exceeding residential soil cleanup target levels from the former drycleaning location. An FDEP Rapid Risk Assessment was conducted in 2011 which confirmed the current site status.
FDEP – Sterling Cleaners
Revised March 19, 2026 www.intertek.com/building
FDEP approved funding to begin active site remediation in 2024 and Intertek-PSI submitted an initial Site Assessment Work Plan to begin active remediation in 2024.
PROPOSED SCOPE OF WORK
The proposal contained herein consists of conducting initial site assessment related work including drilling, sampling and well installation activities, along with generating a report deliverable. The results will be used to determine current soil, soil vapor and groundwater impacts related to the former drycleaning operations on this site. The assessment and sampling procedures will be conducted according to the FDEP Standard Operating Procedures and Drycleaning Solvent Cleanup Program protocols.
Specifically, the proposed scope of work consists of the following subtasks:
1. Project Management
This scope is provided for in the template worksheets.
2. First Mobilization Geoprobe (Direct Push): GPR utility location; Lithologic Boring, Soil Sampling, DPT Screen point Sampling; Monitoring Well Installation; Hand Auger MAGS Well Installation and MAGS Test; Survey Top of Casing elevation and locations.
a. Obtain groundwater well installation permits for the groundwater wells proposed in Figure 1.
b. Obtain a standard utility locate via Sunshine 811 for all locations; verify all soil locations using a GPR subcontractor.
c. Coordinate with the tenant/owner to provide site access.
d. PSI will subcontract drilling services in order to accomplish all drilling related activities.
e. Perform one (1) continuous lithologic profile boring up to 50 feet below land surface (ft-bls) or refusal depth with a DPT drill rig. Assess and classify soils and complete the boring with grout to the surface.
f. Advance seven (7) exterior soil borings to the water table (after hand auger clearance) with a DPT drill rig. Classify soils and collect discrete analytical samples at standard depth intervals (0-0.5 ft-bls, 0.5-2 ft bls, 2-4 ft-bls, 4-6 ft-bls, and 6-8 ft bls). Analytical soil samples will be collected to approximately ~1 ft above the water table. Soil analytical will include the full list of volatile organic compounds (VOCs) via EPA Method 8260 Full, and contingent leachable VOC’s via SPLP analysis. This proposal assumes 100% of the soil samples collected will need SPLP analysis provided. In reality, no more than 10% are expected and a Task Assignment Change Order will be submitted to reduce the quantity of SPLP analysis quantity to reflect the actual number of samples analyzed.
g. Submit soil samples to a NELAP certified laboratory.
h. Complete seven (7) exterior soil borings as MAGS wells.
i. The MAGS™ wells will be installed approximately 1-foot above the groundwater table and are anticipated to be screened from 1 foot bls to 3 feet bls. They will be constructed with a 2-inch diameter 2-foot lengths of 0.01-inch slot size screen with 1 foot of solid riser. The well will be packed with 20/30 silica sand followed
Revised March 19, 2026 www.intertek.com/building by a 30/65 silica sand seal and grouted to surface where it will be completed with a 2 foot by 2 foot concrete pad and an 8-inch manway cover.
i. Conduct groundwater screenpoint sampling using a DPT drill rig equipped with a screenpoint groundwater sampler at seven (7) locations. Collect groundwater samples from each screen interval (3-7 feet bls, 13-17 feet bls, 23-27 feet bls, 33-37 feet bls, and 43-47 feet bls) and submit to a NELAP certified lab for analysis of VOC’s via EPA Method 8260 Full.
j. Use a DPT drill rig (once utilities are cleared with a hand auger) to install up to four (4) shallow monitoring wells and 1 deep monitoring well.
i. Each shallow monitoring well will be installed with a DPT drilling rig and will be constructed with 1-inch diameter 10-foot lengths of pre-packed screen (0.01-inch slot size) from 3-13 ft bls and packed with 20/30 silica sand followed by a 30/65 silica sand seal and grouted to surface.
ii. One deep well will be constructed with 1-inch diameter 5-foot length of pre-packed screen (0.01-inch slot size) from 25-30 ft bls and packed with 20/30 silica sand followed by a 30/65 sand seal and grouted to surface.
k. Develop all wells until discharge water is visually clear of sediment.
l. Containerize investigative derived waste (IDW) in 55-gallon drum, label appropriately and stage on-site, pending waste characterization results.
m. PSI will subcontract a Surveyor to collect GPS coordinates and Top of Casing elevations.
n. Collect groundwater samples and elevation measurements from all four (4) monitoring wells.
o. Containerize investigative derived waste (IDW) in 55-gallon drums, label appropriately and stage on-site, pending waste characterization results.
p. Conduct a MAGS test and collect air samples at each MAGS well head for analysis by EPA
Method TO-15.
3. Second Mobilization: Monitoring Well Sampling / IDW Disposal /Update SAWP Figures
a. Coordinate with the tenant/owner to provide site access.
b. Mobilization to the site during each day of sampling activities.
c. Collect groundwater samples from up to 7 monitoring wells for Full List VOC’s via EPA
Method 8260.
d. Submit groundwater samples to a National Environmental Laboratory Accreditation
Conference (NELAC) approved laboratory for analysis of VOCs via EPA Method 8260. No blanks or duplicates will be included per the Waste Site Cleanup Section.
e. See Subtask 5 for PFAS analysis of groundwater samples collected in this Subtask.
f. Containerize investigative derived waste (IDW) in 55-gallon drum, label appropriately and stage on-site, pending waste characterization results.
g. A subcontractor will transport and dispose of IDW at an approved facility. A signed manifest will be provided by the waste management company prior to pick-up and disposal.
h. Update SAWP maps with all monitoring well and MAGs locations.
Revised March 19, 2026 www.intertek.com/building
4. Reporting: Site Assessment Report
a. A Site Assessment Report will be developed which will include figures, tables, and charts developed to document and summarize soil, soil vapor, and groundwater field parameters and analytical data for analyzed Constituents of Concern. The report will document all assessment activities and results as approved and performed in accordance with the Task Assignment. Included with the report will be conclusions and recommendations as provided by a Professional Engineer licensed in the State of Florida.
The deliverable and invoice schedule are presented below and are based on receival of a Task Assignment prior to May 1, 2026.
COST ESTIMATE AND SCHEDULE
Sterling Cleaners ERIC_5319 Deliverables
Deliverables Deliverable Due Date
Subtask 1 Project Management Upon completion of Task Assignment
Subtask 2 GPR, DPT, MAGS Assessment, MW Installation, Survey July 31, 2026
Subtask 3 GW Sampling September 30, 2026 Subtask 4 Site Assessment Report December 31, 2026
Invoice Schedule Requirements for Invoice Submittal Amount to be
Invoiced
Subtask 2 DPT Field Notes and DPT Analytical Data $54,230.41
Subtask 3 Field Logs, GW Well Permits and Completion Logs, and Lab Results $4,889.48
Subtasks 4 & 1 Site Assessment Report, IDW manifests $13,888.57
Total: $73,008.46
The estimated cost to perform this proposed Site Assessment is shown on the attached Cost Estimate and Level of Effort (LOE) sheets. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021.
Should any of the required subcontracted services or laboratory costs referenced within the LOE need to be increased or decreased based on changed field conditions, FDEP representatives will be contacted immediately to request a change order to the existing Task Assignment (i.e. TACO).
Revised March 19, 2026 www.intertek.com/building
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.
Douglas Coleman, PMP, CHMM, REM Joshua S. Newell, PE Environmental Department Manager/Contract Manager Senior Engineer/Principal Consultant
Enclosures: Figure 1 Cost Estimate Level of Effort Subcontractor Bids
\\Tampa-fs\projects\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552-442355 Sterling Cleaners, SA, Tampa\Proposal\Revision 2\Sterling Cleaners (Publix) - Site Assessment Proposal 2026.docx
Contractor: Intertek Proposal No.: 22603023rev1 Contact Name: Joshua Newell
Contact Phone: 863 712-4342 Date: 3/13/2026 Contact Email: joshua.newell@intertek.com Site Address: FDEP ID#: ERIC5319
PROPOSED SCOPE OF WORK: Estimator: MR
Rig Daily Rate - (maximum 10 hours) day $1,800.00 5 $9,000.00
PVC MAG Installation (includes all materials) ID __2"____ each $175.00 7 $1,225.00
PVC Well Installation (includes all materials) ID __1"____ each $365.00 5 $1,825.00 per well $125.00 12 $1,500.00
Open, Plug/resurface borehole each $65.00 8 $520.00
Borehole clearance - Utility locating using geophysics (GPR and Electronics) day $1,500.00 $0.00
Mobilization (one rig) Miles round trip: round trip $750.00 1 $750.00
Daily travel- Automatic when travel distances are 100 to 150 miles round trip (longer than a day) day $65.00 5 $325.00
Per Diem - Automatic when field work is longer than 9hr/day or round trip over 150 miles per crew/night $480.00 $0.00 DOT Approved 55-gal Drum each $70.00 3 $210.00 Special Order Closed Top Drums each $95.00 5 $475.00
Permits 2 (Drilling and abandonment only; cost according to WMD & Local Municipalities) SWFWMD waive permit/fee on FDEP sites Predrilling on site meeting LS $0.00 Predrilling conf. call meeting LS included
Extra hour rate 5 hour $275.00 $0.00
Use of a concrete saw or concrete core bit -To open asphalt or concrete for SB/MW day $250.00 $0.00
TOTAL QUOTE PRICE $15,830.00
NOTES: This proposal is only valid for this specific scope of work. Any changes, prices shall be revised. Actual field days, materials and hours will be invoiced
Days to Complete Scope of Work: approx. up to 5 day(s) (depends on access, client sampling time or other restrictions) " Subcontractor Company Name: ATI Companies, LLC Subcontractor Mailing Address: 5709 First Ave S. St. Petersburg FL 33711
Signature:___________________________ Reviewer:____________________________ Date: 3/13/2026
NOTE: to schedule work, contact 727-328-0268 Bid Valid for 90 Days
Payment terms: Net 60 days
This proposal acceptance includes ATI's standard Terms and Conditions
Name of Firm:__________________________________________________ Date: ______________
Signature of Representative: _________________________________________
Print name of signing Representative:________________________________
• Geoprobe- DPT advance one (1) SB to 50ft. Hand clear to 5ft and macrocore to TD. Plug and patch once completed.
• Geoprobe- DPT advance seven (7) SBs up to 10ft. Hand clear to 5ft and macrocore to TD (if need). (These locations will become the MAG wells).
• Geoprobe- DPT advance seven (7) SB/GW to 47ft. Collect 5 GW samples at every 10ft interval. Plug and patch once completed.
• Geoprobe- DPT install four (4) MWs to 13ft. Wells are 1" with 10ft of prepack screen. Hand clear to 5ft.
• Geoprobe- DPT install one (1) MW to 30ft. Well is1" with 5ft of prepack screen. Hand clear to 5ft.
• Install seven (7) MAG wells to 3ft. Wells are 2" with 2ft of PVC 0.010 slotted screen.
• Complete all MW and MAG wells with 2x2 pad with 8" bolt down cover.
SAFETY
DRILLING DOUBLE CASED WELL
ABANDONMENT
DRILLING ACTIVITIES
NOTE: This proposal needs to be signed once job is awarded to ATI Companies, LLC
182 37th Ave N St Pete FL
If pea gravel is encountered, drilling must stop. No drilling on pea gravel is permitted.
Client is responsible for any ROW or access permits and MOT for the work to be performed, if needed.
Is also client responsibility to have all utilities located when on Private Property. If not, any damages on utilities and other structures related to drilling activities will be client responsibility.
6. A perdiem will automatically be charged when field work is longer than 9hr/day or round trip over 150 miles
1. Includes expendables, tubing, points, liners, caps, plugs, sawcuts, steam cleaning decon, well development, and grouting.
MISCELLANEOUS
2. Well Permits -Requires 5 days Notice to Water Management District - Actual cost only.
3. Utility Clearance - Requires 72 Hour Notice Prior to Drilling. ATI will complete notification to Sunshine State One Call (Sunshine) prior to initiating drilling.
Sunshine will not perform locates on private property (only right of ways and easements). It is the client and/or owners responsibility to provide information from private property. Damage repairs (time and materials) caused to any underground utilities on private property is client responsibility. ATI will review information provided regarding underground utilities to confirm clearance at boring locations. As another safety precaution, ATI will perform hand clear to approximately 5 feet below ground surface to check for utilities prior to drilling. If the client anticipates the potential for multiple utilities underground but has no information on location, we can provide private utility locating services at an additional cost. Please advise us of your needs prior to date of drilling.
4. Price assumes no rock will be encountered in the depth of penetration.
5. DPT Daily and Half-Day Rate: Hours over Half-day and Full Day Rate - $275 / hour
HORIZONTAL WELLS
Monitoring Well Completion (sand pack, seal, pad/MHC, 30min development, locking cap) 8"
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 3/17/26 FAC ID#:
Unit Unit Rate Number of Units Extended Price whole day $2,275.00 5 11,375.00$ half day $1,475.00 -$ per foot $25.00 -$ each $110.00 9 990.00$ each $135.00 -$ each $50.00 7 350.00$ each $35.00 16 560.00$ per well $125.00 12 1,500.00$ roundtrip $750.00 1 750.00$ per crew / per night $575.00 -$ each $60.00 10 600.00$ per day $125.00 3 375.00$ each $100.00 2 200.00$ lump sum $350.00 -$ per day $50.00 -$
TOTAL QUOTE PRICE $16,700.00
Notes: 1. Includes saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: RRose Hood , Rose Hood Estimating & Scheduling Manager Date: 3/17/26
Days to Complete Scope of Work: 5
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, 3230DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Other (specify)
Steam Cleaner
Decon Pad
GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)
DOT Approved 55-gal Drum
Per Diem Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Permits
Site Name and Location: Sterling Cleaners
Consultant Name: Intertek-PSI
PROPOSED SCOPE OF WORK:
(1) DPT boring to 50', continuous soil sampling, backfill with grout, restore grade
(7) DPT borings to approx 10', soil sampling, convert into MAG wells
(7) DPT borings to 47', grab (5) groundwater samples per boring, backfill with grout, restore grade
218 37th Ave N, St Petersburg, Pinellas County, FL
Well Completion (includes 8" MH w/ cover, concrete pad, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
Auger Attachment, 2" Well Install
Direct Push Half-Day Rate 1 - on-site half day
(4) 1" x 13' MWs with 10' prepack screen, no soil sampling, drum cuttings, pads and 8" manholes
(7) 2" x 4' MAG wells with 2' .010 screen, drum cuttings, pads and 8" manholes
(1) 1" x 30' MW with 5' prepack screen, no soil sampling, drum cuttings, pad and 8" manhole
Pre-Packed Well Screen (includes all materials) ID 2" 5' Length Pack OD 3.5"
GeoTek Services, LLC
11 March 2026
To: Josh Newell Intertek-PSI 607 South Alexander Street, Ste. 205 Plant City, Florida 33563
From: GeoTek Services, LLC 4060 Sparrow Hawk Road
Melbourne, Florida 32934
RE: Utility Locating Services – 218 37th Ave N, in St. Petersburg, Florida
Mr. Newell, GeoTek Services is pleased to respond to your request for Utility Locating services at 218 37th Ave N located in St. Petersburg, Florida. We will scan a (10’ x 10’) area around the nineteen proposed bore locations with the goal of locating underground utilities. We can only scan the easily accessible open areas for utilities. Note that we cannot scan beneath fixed objects such as landscaping, fencing, or vehicles. We will scan as close as reasonably possible to fixed objects such as curbs, vehicles, fences, etc. Our deliverable will be marking paint and/or flags indicating the location of potential underground utilities. It is the client’s responsibility to protect and preserve all marks.
We will use both Electromagnetic Induction instruments as well as Ground Penetrating Radar (GPR) to detect objects below the surface. Due to the nature of sub-surface detection and the physical laws governing radio wave propagation, some buried objects may not be detectable due to depth, obscuration, or a weak radar signature. GeoTek Services will use industry standard best practices to locate sub-surface objects, however some objects may not be detectable. Geotek Services does not guarantee that all underground objects can be found. GeoTek Services assumes no liability for any damages.
We request access to any as-built site plans of the scan areas prior to rendering services. Our utility locating quote for this project is $750.00. No out-of-pocket expenses are expected for this project. This quote is valid for ninety days.
Best Regards, Martin (Bud) Connor GeoTek Services, LLC
4060 Sparrow Hawk Road Melbourne, FL 32934-8525 info@GeoTekServices.com 321.473.7498
A Geophysical Services Company
5709 First Avenue South Tel.: (727) 209-2334 St. Petersburg, FL 33707 Fax: (727) 328-2477
March 12, 2026
Mr. Josh Newell, P.E.
Intertek-PSI Intertek-PSI, 607 South Alexander Street, Ste. 205, Plant City, FL 33563 Plant City, FL 33563
Subject: Proposal to Perform a Utility Designation Study 218 37th Avenue North St. Petersburg, Florida GeoView Proposal Number: 12170p
Mr. Newell, The purpose of this letter is to transmit a proposal to complete a geophysical designation study at the subject site. This proposal is in response to your request for a proposal made during your recent conversations with our office. GeoView Associates, Inc. (GeoView) appreciates the opportunity to provide our services on this project. We look forward to hearing from you soon.
Sincerely, GEOVIEW ASSOCIATES, INC.
Christopher Taylor, P.G.
Vice President Florida Professional Geologist Number 2256 Enclosure
Proposal This document shall serve as a proposal for work to be performed by
GeoView Associates, Inc. (GeoView) for Intertek-PSI.
Scope of Work
The project site is located at 218 37th Avenue North in St. Petersburg, Florida. The purpose of the geophysical survey will be to determine the location of underground utilities within a 10 feet radius of 19 proposed borings The location of the study area is provided on Figure 1.
The geophysical survey will be conducted using ground penetrating radar (GPR) and conventional electromagnetic (EM) pipe and cable locators. The GPR survey will be conducted using a GSSI GPR system. The appropriate GPR antenna configuration and time range and processing parameters will be determined in the field by the project manager.
The EM survey will be conducted using a Subsite 95R and/or a Radiodetection RD (8000, 8100 or 8200) system. As appropriate, the EM survey will be conducted using both passive and active modes. The passive mode is used to find cables and conduits carrying live power (50-60 Hz) and communication (29-33Hz) signals. For the active mode survey, a current is transmitted directly or broadcast into using electromagnetic induction a metal pipe or conduit and the path of the pipe/conduit is identified by following the signal with a portable receiver.
The active mode is used to trace out cast iron pipes, metal water and sewer lines, utilities that have trace wires, and inactive power and communication lines.
Based on information provided by Intertek-PSI, it does not appear that the work at any of the sites will require MOT (traffic calming efforts). This proposal does not include the costs for the design or implementation of an MOT program.
Presentation of Results The location and estimated depths of underground utilities or any other identified structures shall be indicated on the ground surface using spray paint or other methods as specified by Intertek-PSI. No report shall be prepared.
Compensation Cost to complete the survey will be as follows:
Mobilization: $0 Field Investigation: $1500 Data Analysis and Report Production: Note Required
Total: $1,500
If a scaled AutoCAD site map is required to document the study results, an additional fee of $200 will be added. This price is inclusive of all charges associated with the project. Unless otherwise agreed upon, GeoView shall be compensated for all services within 30 days of the invoice date. GeoView shall be paid in full regardless of whether the results of the geophysical survey are what Intertek-PSI anticipated. If it is determined during the survey that the geophysical survey will not achieve the objectives of the project, Intertek-PSI will immediately be notified. If a decision is made to discontinue the survey, only charges for time and materials costs to that point will be submitted.
These prices are based upon GeoView being able to access the site during normal business hours, Monday through Friday. It is also based upon the assumption that no site-specific training or drug testing will be required. If there are any such requirements, additional costs will be incurred.
Requirements of Client Intertek-PSI will provide a scaled map and digital file, if available, of the project site showing the boundaries of the project site, areas of specific concern and pertinent landmarks. Intertek-PSI will also supply all available information regarding the presence and history of underground utilities at the project site (see limitations for further discussion). Unless otherwise requested, Intertek-PSI will be responsible for the coordination of site access, traffic control, clearing of onsite obstructions or any other logistical consideration necessary to conduct the survey.
If any test drilling, monitor well installation or other excavation activities are planned it will be the responsibility of Intertek-PSI to submit a notification (dig ticket) to the appropriate 811 One-Call agency. It is recommended that such notification be filed sufficiently in advance so that GeoView will have the opportunity to incorporate the 811 findings into their results.
Limitations The objective of the geophysical survey is to determine the presence and configuration of underground utilities. However, the geophysical response of these features may be highly complex depending upon on the physical characteristics of the underground utilities, the electrical properties of the surrounding soils, the depth of burial of the utilities, and the proximity of the utilities to each other.
GeoView shall conduct the geophysical survey using the most “up-to-date” geophysical equipment in a manner consistent with the level of care and skill ordinarily exercised by members of the geophysical profession practicing in the same locality under similar conditions. GeoView’s utility locating personnel are all certified GPR and conventional pipe and cable locator operators with extensive in-house training.
It is acknowledged that GeoView is not an 811 Sunshine One-Call or equivalent utility mark-out service. GeoView does not have access to any utility-related records for either public or private properties. It is the responsibility of Intertek-PSI to obtain such records and provide to GeoView prior to the site investigation. GeoView will use these records during the site investigation and report to Intertek-PSI any utilities that are shown on the site records but cannot be confirmed by GeoView. GeoView will not mark on the ground surface any utilities which it cannot confirm.
GeoView shall only be liable for the successful locating of underground utilities or any other underground structures whose presence is both known and indicated on site maps to be provided prior to the performance of the geophysical survey. Every attempt will be made to locate both known and unknown utilities within the survey area. However, GeoView will only be liable for utilities whose presence is known prior to the survey. Intertek-PSI accepts that due to the inherent limitations of non-intrusive geophysical technologies GeoView cannot be held liable for damages to utilities that cannot identified using non-intrusive technologies.
Intertek-PSI accepts that a non-intrusive utility designation study does not replace the need to employ widely accepted industry safety standards for subsurface work. Concerning the installation of well or test borings this standard of care includes post-holing or hand auguring at the planned test locations to the minimum depth at which underground utilities are anticipated at the project site. If absolute confirmation is needed to a specified depth that underground utilities are not present at a planned work location GeoView can provide vacuum excavation services. Pricing for such services is available upon request.
When Intertek-PSI is working around indicated utilities, a minimum of 2 ft clearance from either side of the marked utility will be maintained. Unless otherwise indicated, a minimum vertical clearance of +/- 20 percent of the indicated depth shall also be maintained. Intertek-PSI maintains the responsibility for manually exposing any indicated underground utility for absolute confirmation.
Authorization and scheduling of the project is considered acceptance of these terms and conditions.
Other Terms and Conditions Per Master Services Agreement with Intertek-PSI.
Figure 1 – Project Site Location
GEOVIEW ASSOCIATES, INC.
PROPOSAL ACCEPTANCE SHEET
Project Name: 218 37th Avenue North Project Location St. Petersburg, Florida GeoView Proposal #: 12170p Proposal Date: March 12, 2026 Description of Services Provide Utility Designating Services Project Cost: $1,500 – see compensation page 3 Payment Terms: Per MSA
CHARGE INVOICE TO THE ACCOUNT OF:
Client: Intertek-PSI Address: Intertek-PSI, 607 South Alexander Street, Ste. 205, Plant City, FL
33563 Plant City, FL 33563
Attention: Josh Newell, P.E.
Phone (Office): (863) 712-4342 Phone (Cell):
Email: joshua.newell@intertek.com
FOR APPROVAL OF CHARGES:
Firm:
Address:
Phone No.: Fax No:
Attention:
Special Instructions and/or Mutually Agreed Upon Changes to the Proposal:
In witness thereof, the parties hereto have made and executed this Agreement Client: GeoView Associates, Inc.
Signature
By: By: Chris Taylor, P.G.
Title: Title: Vice President
Date Signed: Date Signed: March 12, 2026
General Description and Limitations of Geophysical Methods Ground Penetrating Radar (GPR)
The GPR survey will be conducted using GSSI GPR systems. The survey will be conducted with either a 900, 400 or 350 mega-Hertz antenna. The appropriate antenna will be determined in the field by the project manager. GPR will be able to provide both the position and estimated depth of both metallic and non-metallic underground utilities.
The GPR method uses electromagnetic signals to detect subsurface utilities.
The depth of GPR penetration is primarily limited by the attenuation of the signal within subsurface soils. Attenuation occurs when the electromagnetic signal is absorbed by soil materials, preventing the GPR from detecting deeper features.
Factors such as soil composition, moisture content, and conductivity significantly affect signal attenuation. For example, clay-rich soils or soils with high moisture content can dramatically reduce the effective depth range of GPR. Once the signal is fully attenuated, no further data can be collected from deeper layers, which may result in undetected utilities at greater depths.
The ability of GPR to accurately detect a utility depends on the contrast in dielectric constants (conductivity) between the utility and the surrounding soils.
Higher dielectric contrasts produce stronger signal reflections, enhancing the detectability of underground utilities. Metal pipes, such as steel, typically provide a strong contrast against sandy soils, making them easier to identify. In contrast, non-metallic pipes, such as PVC, ceramic, or concrete, present a lower dielectric contrast, which may result in weak or indistinguishable reflections. Consequently, utilities made from non-metallic materials may be difficult or even impossible to detect using GPR.
The size and depth of a utility also influence GPR's effectiveness. GPR resolution decreases by approximately 0.5 to 1 inch per foot of burial depth. For example, a small 2-inch diameter pipe may not be detectable at depths greater than 2 to 4 feet. Additionally, surface conditions, such as reinforced concrete, asphalt, or metal debris, may scatter or block GPR signals, further complicating utility detection. Adverse site conditions, including the presence of saltwater, highly conductive soils, or large subsurface obstructions, can also interfere with the accuracy of GPR data.
Conventional Electromagnetic Pipe and Cable Locators (EUL)
A Radiodetection System is used to locate underground utilities using conventional means. The system consists of a dual-function receiver and transmitter. The receiver can be operated in two modes: active and passive. In the passive mode the receiver detects the presence of underground utilities that are energized by a 60-Hertz or other known frequency. These utilities can either be those actually carrying electrical power or those utilities that are both metallic and sufficiently close to the electrical lines to have an electrical field induced within them.
In active mode, the EUL directly connects to a utility and induces a current to create a detectable electromagnetic field. The frequency of this field can be varied from 512 Hertz to 200 kilohertz. This method is highly effective for locating metallic utilities, such as steel pipes, metallic conduits, and cables. However, it cannot detect non-metallic utilities, such as PVC, concrete, clay, or HDPE pipes, unless a metallic tracer wire is present. When a utility transitions from a metallic to a non-metallic material, the EUL will only detect the utility up to the transition point. Furthermore, non-metallic pipelines equipped with metallic tracer wires, like some gas lines, may become undetectable if the tracer wire is broken, corroded, or discontinuous.
The EUL method also faces challenges in complex utility networks. In densely populated utility corridors, overlapping electromagnetic signals can cause interference, resulting in inaccurate or ambiguous utility locations. Multiple metallic utilities in close proximity may create false or ghost signals, complicating the interpretation of subsurface conditions and increasing the risk of misidentification. Depths of underground utilities can be determined when the EM equipment is being used in the active mode. Depths are typically accurate to within 10-15 percent of the total utility depth.
GPRSINC.COM
PROPOSAL
IN PURSUIT OF 1OO% SUBSURFACE DAMAGE PREVENTION
UTILITY LOCATING
VIDEO PIPE INSPECTION LEAK DETECTION
3D LASER SCANNING
MAPPING MODELING
CONCRETE IMAGING
GPRS Intelligently Visualizes The Built World® above and below ground for customers who need accurate, efficient damage prevention, existing condition as-built documentation, or project & facility management tools. Our elite nationwide team of Project Managers are experts in locating buried infrastructure, reality capture, and mapping – delivered via SiteMap®, our digital visualization software platform, with a 99.8% accuracy rate in utility locating and concrete imaging – thanks to our industry-leading Subsurface Investigation Methodology (SIM).
INTERTEK
PROFESSIONAL SERVICES
INC - ARLINGTON
H…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .