This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Professional Service Industries, Inc. (Intertek-PSI) for environmental remediation services at the Palm Cleaners site located at 14616 Livingston Avenue in Lutz, Hillsborough County, Florida. The task assignment is entered into pursuant to underlying Contract Number HW686 and is identified as TA Number DC013C. The Department Project Manager is Mary Uribe, and the Contractor's Project Manager is Joshua Newell. The project is designated by FDEP project number ERIC_4721.
The scope of work consists of two subtasks: (1) Project Management and (2) preparation of an Interim Source Removal Plan (ISR Plan) utilizing soil vapor extraction technology to address volatile organic hydrocarbon concentrations in the soil. The total task assignment value is $12,974.96 on a fixed unit rate basis. The deliverable is due January 31, 2026, with a task completion date of February 27, 2026. Invoice payment is contingent upon FDEP approval of both the Project Management subtask and the ISR Plan deliverable. The cost estimate includes 94 total labor hours across multiple staff categories (Project Manager, Project Engineer, Senior Engineer, Project Scientist, GIS/CAD Specialist, and Administrative Assistant), vehicle rental costs of $120.00, field equipment expendables of $400.00, and a completion fee. No subcontractor, laboratory, or analytical costs are included in this estimate.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW686
DC013C Completion February 27, 2026
SVE Interim Source Removal Plan
Mary Uribe 850-245-8990 Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor
Contractor Joshua Newell Contractor 863-712-4342
ERIC_4721
14616 Livingston Avenue Lutz, Hillsborough County
Palm Cleaners
Contractor Contractor
✔ $ 12,974.96
$ 12,974.96
Scope of Work
Professional Service Industries, Inc. (Intertek-PSI) Contractor Douglas Coleman PMP, CHMM, REM
Contract Manager
Douglas Coleman Digitally signed by Douglas Coleman Date: 2025.09.19 09:15:43 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.09.11 11:08:58 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 1: Project Management Subtask 2: Interim Source Removal Plan 01/31/2026
Subtask 1: DEP approval of Project Management Subtask 2: DEP approval of Interim Source Removal Plan $ 12,974.96
$ 12,974.96
HW686
DC013C
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins Lt. Governor
Alexis Lambert Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE:
ERIC_
Cleaners
Mary Uribe, Project Manager
Negotiation Summary
HW686 DC0
PSI will
Total task amount is $ . PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is
. Task completion date is .
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
P ro fe ss io na l S er vi ce
In du st rie s, In c.
(I nt er te k-
P S
I)
D at e:
9/ 5/
Ta sk ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
P al m
C le an er s E
R
IC
_4
Ta sk
IS
R P la n
S ub
Ta sk
A ct iv ity
/P ha se
IS
R
P la n
Ta sk
S ub Ta sk
P ro je ct
M an ag er
Jo sh N ew el l
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
La bo r R at e
C at eg or y $4
8.
PP
ro je ct
M an ag er
.8
$4 8.
P ro je ct E ng in ee r, JN
$6
2.
S en io r E ng in ee r, G R
.0
$4
0.
P ro je ct
S ci en tis t, JD
6.
$3
4.
G
IS
C
A D
S pe ci al is t, D G
3.
$2
0.
A dm in is tra tiv e A ss is ta nt
, B M
3.
T ot al
H ou rs
.0
D ire ct L ab or
$4
,5
.6
$5
.9
$3 ,9
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
1.
$6
,8
.0
$7
.6
$6 ,0
.3
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or
$1
1, 2.
$1 ,3
.6
$1
0, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ra ve l RE V:
2/
CE
F In te rt ek -P
SI
Pa ge
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
P ro fe ss io na l S er vi ce
In du st rie s, In c.
(I nt er te k-
P
I) at e:
9/ 5/
Ta sk
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
P al m
C le an er s E
R
IC
_4
Ta sk
IS
R P la n
S ub
Ta sk
A ct iv ity
/P ha se
IS
R
P la n
Ta sk
S ub Ta sk
P ro je ct
M an ag er
Jo sh N ew el l
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
V eh ic le
R en ta l
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$ $1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m en t) ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P er so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $4
0.
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$3
.0
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $4
.0
$4
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $1
1, 2.
$1 ,3
.6
$1
0, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$1 ,1
.2
$1
.2
$1
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al E st im at ed
C os t $1
2, 4.
$1 ,4
.8
$1
1, 2.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F In te rt ek -P
SI
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Palm Cleaners ERIC_4721 SubTask 2 ISR Plan
DATE: 9/5/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities
Senior Engineer, G Robinson Coordinate with tenant, property owner 2 Review bid documents for subcontractors 2 Review calculations 2 Review text 3 Review tables 1 Review figures 1 Sign and seal documents 1
Total Hours 12
Project Engineer, J Newell Travel to Site, roundtrip 3 Meet on-site with tenant/owner to evaluate equipment locations 3 Evaluate electrical requirements with power company 3 Prepare remediation calculations (SV & AI - flow rates and friction loss) 6 Equipment specifications selection - SVE/AI blowers 8 Prepare ISRP text 12 Develop tables 4
Prepare ISR checklist 2 Develop bid documents for subcontractors 6
Total Hours 59
Project Scientist, J Daugherty Obtain subcontractor quotes 6 Total Hours 6
GIS/CADD Specialist, D Grove Create and prepare final figures 3
Administrative Assistant, B Meynardie Compile documents 3
TOTAL LABOR 83.00
VEHICLE TYPE RATE UNIT USEAGE
$0.00 Equipment Van / Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
$0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Expendables $40.00 day 1 $40.00 Construction Test Kit $360.00 day 1 $360.00
#REF!
TOTAL EQUIPMENT $400.00
Develop figures (site plan, treatment system layout, trenching cross sections, well construction details, manifold details, piping and instrumentation diagram (P&ID), fence detail, trailer tie down detail, and equipment layout as needed)
FINAL --7/24/96
Page 4 Palm Cleaners ERIC_4721 ISR Plan SVE 0552-446332r1
FDEP – Palm Dry Cleaners ERIC_4721 PSI Proposal 0552-446332r1
September 5, 2025 www.intertek.com/building
PSI, therefore, has developed this scope of work, cost estimate and level of effort to prepare an ISR Plan consisting of SVE remedial technology with an optional air injection blower if a newly constructed system is recommended.
PROPOSED SCOPE OF WORK
This proposal consists of preparing the Interim Source Removal Plan (Soil Vapor Extraction) at the referenced site.
Specifically, the proposed scope of work consists of the following subtasks:
1. Project Management
This scope is provided for in the template worksheets.
2. Interim Source Removal Plan (ISR Plan)
The design of the ISRP will address VOH concentrations in the soil and will not directly address groundwater quality. The presumptive remedy for remediation of impacted soil at the Palm Dry Cleaners site is soil vapor extraction, based on previous experience, feasibility, implementability, reliability, operations and maintenance (O&M) requirements, and cost. PSI will also coordinate with the building tenant, property management company, and the property owner for suggested locations of piping, lines, and equipment compound.
Calculations will be generated to determine the design, construction details and specifications of the system (number of SVE wells, radius of influence, estimated time to cleanup, etc). Figures will include site plan, treatment system layout, trenching cross sections, well construction details, manifold details, piping and instrumentation diagram (P&ID), fence detail, trailer tie down detail, and equipment layout, as necessary.
The SVE design will include a summary of the MAGS survey. The report will include pertinent information to include a detailed description of the remedial system, operation details, start-up testing, site schedule for O&M, tables summarizing proposed samples and analysis, and itemized cost estimates for project capital, and the implementation schedule. The design will be signed and sealed by a Florida Registered Engineer in accordance with Chapters 471, Florida Statues. The report will incorporate specific recommendations and provide opinions based on professional experience in order to achieve the most efficient endpoints. We understand that the Department’s goal is to achieve aggressive contaminant reduction in an efficient and cost-effective method.
The deliverable and invoice schedule are presented below and are based on receipt of a Task Assignment prior to September 15, 2025.