CN-370000-HW686-DC07BCO3.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|HW686|26652fe61cf76d14a6798f2369f5dddb
Contract number
HW686
Issued by
Florida

About this file

This document is a Task Assignment Change Order (Change Order #3) issued by the State of Florida Department of Environmental Protection (FDEP) to Professional Service Industries, Inc. (Intertek-PSI), a contractor providing environmental consulting services. The change order amends Task Assignment DC007B under Contract Number HW686 for the Fashion Cleaners (Former) site, identified as project ERIC_5245. The Department's Project Manager is Nicole Knutson, and the contractor's project manager is Nana Westmark. The change order was executed in July 2023, with final signatures dated August 1, 2023.

This change order reflects a cost reduction of $2,882.00, decreasing the total task value from the prior amount of $41,483.74 to an amended price of $38,601.74 using a fixed unit rate pricing structure. The reduction accounts for lower drilling costs and Inspection and Disposal of Waste (IDW) costs, specifically reductions in drilling services provided by Groundwater Protection ($1,970.00) and IDW transport and disposal services provided by Petrotech Southeast ($650.00), plus associated handling fees. The task encompasses four subtasks: Project Management, MAGS Well Installation, MAGS Testing, and Supplemental Site Assessment Report preparation. Deliverables are due June 24, 2023, with a task completion date of October 2, 2023. The work involves installation and testing of a Multi-phase Extraction System (MAGS) for groundwater remediation at the former dry cleaning facility site in New Port Richey, Florida, including site assessment reporting and field documentation of installation and testing activities.

View the file

Other files

File Type Posted
CN-370000-HW686-DC003C.pdf PDF
CN-370000-HW686-DC004A.pdf PDF
CN-370000-HW686-DC004B.pdf PDF
CN-370000-HW686-DC006B.pdf PDF
CN-370000-HW686-DC006C.pdf PDF
CN-370000-HW686-DC008A.pdf PDF
CN-370000-HW686-DC008C.pdf PDF
CN-370000-HW686-DC009A.pdf PDF
CN-370000-HW686-DC010E.pdf PDF
CN-370000-HW686-DC011C.pdf PDF
CN-370000-HW686-DC012A.pdf PDF
CN-370000-HW686-DC013B.pdf PDF
CN-370000-HW686-DC013C.pdf PDF
CN-370000-HW686-DC01ACO5.pdf PDF
CN-370000-HW686-DC020A.pdf PDF
CN-370000-HW686-DC027A.pdf PDF
CN-370000-HW686-DC029A.pdf PDF
CN-370000-HW686-DC02ECO1.pdf PDF
CN-370000-HW686-DC02ECO2.pdf PDF
CN-370000-HW686-DC030A.pdf PDF
CN-370000-HW686-DC03ACO1.pdf PDF
CN-370000-HW686-DC03DCO1.pdf PDF
CN-370000-HW686-DC04ACO1.pdf PDF
CN-370000-HW686-DC05CCO1.pdf PDF
CN-370000-HW686-DC05CCO2.pdf PDF
CN-370000-HW686-DC07BCO2.pdf PDF
CN-370000-HW686-DC07ECO1.pdf PDF
CN-370000-HW686-DC10ACO1.pdf PDF
CN-370000-HW686-DC11ACO1.pdf PDF
CN-370000-HW686-DC14BCO1.pdf PDF
CN-370000-HW686-DC19BCO1.pdf PDF
CN-370000-HW686-DC21BCO2.pdf PDF
CN-370000-HW686-DC21BCO3.pdf PDF
CN-370000-HW686-DC22ACO1.pdf PDF
CN-370000-HW686-DCO24B.pdf PDF
CN-370000-HW686-FIL11.pdf PDF
CN-370000-HW686-FIL4.pdf PDF
CN-370000-HW686-FIL5.pdf PDF
CN-370000-HW686-FIL7.pdf PDF
CN-370000-HW686-HW006A.pdf PDF
CN-370000-HW686-HW007A.pdf PDF
CN-370000-HW686-HW010A.pdf PDF
CN-370000-HW686-SA253.pdf PDF
CN-370000-HW686-SA253CO1.pdf PDF
CN-370000-HW686-DC001B.pdf PDF
CN-370000-HW686-DC002B.pdf PDF
CN-370000-HW686-DC002D.pdf PDF
CN-370000-HW686-DC003F.pdf PDF
CN-370000-HW686-DC004D.pdf PDF
CN-370000-HW686-DC005B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC007B 3 HW686

This Change Order accounts for the reduction in drilling costs and IDW costs, as detailed in the July 28, 2023 Change Order request from PSI.

Nicole Knutson 850-245-8763 Contractor Contractor

Contractor Contractor

Contractor

Intertek-PSI (PSI) Nana Westmark 813-886-1075 Ext 219

ERIC_5245

Fashion Cleaners (Former)

✔ $ 38,601.74 $ 41,483.74

$ 38,601.74 $ 41,483.74 ✔ Completion

Completion 0

✔ 1 1 3

Professional Service Industries, Inc. (Intertek-PSI)

Nana Westmark

Senior Geologist / Principal Consultant

Nana G Westmark Digitally signed by Nana G Westmark Date: 2023.08.01 08:03:26 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2023.07.31 15:51:01 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW686

DC007B

$ 38,601.74

Subtasks 2 & 3: IDW Manifests, Subcontractor Receipts, and Field Documentation of MAGS installation and testing.

Subtasks 4 &1: Supplemental Site Assessment Report and Project Management

Subtasks 1-4 submittal and FDEP approval of the Supplemental Site Assessment Report AND IDW Manifests, Subcontractor Receipts, and Field Documentation of MAGS installation and testing AND PM

06/24/2023

06/24/2023

$ 38,601.74

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: ERIC_5245

Fashion Cleaners (Former)

FROM: Nicole Knutson, Project Manager

SUBJECT: Negotiation Summary

HW686 DC007B

Change Order #3

DATE: July 31, 2023

This Change Order accounts for the reduction in drilling costs and IDW costs, as detailed in the July 28, 2023 Change Order request from PSI. Groundwater Protection provided drilling subcontractor services. Petrotech Southeast provided IDW T&D services.

Total task amount has reduced by $2,882.00 for a final cost estimate of $38,601.74.

PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date remains June 24, 2023. Task completion date remains October 2, 2023.

ATTACHMENT A

FINAL COST ESTIMATE FORM/

LEVEL OF EFFORT

FDEP COST ESTIMATEContractor: Professional Service Industries, Inc. (Intertek-PSI)

Date:

Task #: DC007B-CO-3 SubTask 1 Project Management SubTask 6

Site: Fashion ERIC_5245 SubTask 2 MAGS Well Installation SubTask 7

Activity/Phase: MAGS - Deep Zone SubTask 3 MAGS Testing SubTask 8

Project Manager: Nana Westmark SubTask 4 Supplemental Site Assessment Report - 2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.99 Project Manager 12 11.5 $0.00 Principal Consultant 0 0 0 0 0 0 0 0 0 0

$62.64 Senior Engineer, MR 8.5 0 4 4.5 0 0 0 0 0 0 $56.99 Senior Geologist, NW 4 4 0 0 0 0 0 0 0 0

$0.00 Senior Scientist 0 0 0 0 0 0 0 0 0 0 $0.00 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0 $0.00 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0 $0.00 Florida Licensed Asbestos Consultant 0 0 0 0 0 0 0 0 0 0 $0.00 Project Manager 0 0 0 0 0 0 0 0 0 0

$36.06 Project Engineer 0 0 0 0 0 0 0 0 0 0 $38.20 Project Engineer, IK 51 0 29 22 0 0 0 0 0 0 $30.56 Project Engineer, MK 0 0 0 0 0 0 0 0 0 0 $37.02 Project Engineer, SJ 0 0 0 0 0 0 0 0 0 0 $33.74 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0 $29.86 Project Scientist 0 0 0 0 0 0 0 0 0 0 $29.77 Project Scientist, RF 27 27 0 0 0 0 0 0 0 0

$0.00 QA Officer 0 0 0 0 0 0 0 0 0 0 $31.51 Remediation Specialist, RH 27 0 27 0 0 0 0 0 0 0 $24.94 GIS / CAD Specialist, BW 3 0 0 3 0 0 0 0 0 0

$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0

$24.94 Staff Scientist, BW 0 0 0 0 0 0 0 0 0 0 $30.91 Environmental Specialist, CC 0 0 0 0 0 0 0 0 0 0 $22.06 Environmental Specialist, MZ 27 0 27 0 0 0 0 0 0 0 $20.81 Administrative Assistant, BM 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 159.5 12 31 87 29.5 0 0 0 0 0 0

Direct Labor $5,687.97 $654.37 $1,031.75 $2,804.75 $1,197.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $8,589.97 $988.23 $1,558.15 $4,235.73 $1,807.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $14,277.94 $1,642.60 $2,589.90 $7,040.48 $3,004.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7/28/2023

REV: 02/03 CEF Intertek-PSI Page 1

Task #: DC007B-CO-3 SubTask 1 Project Management SubTask 6

Site: Fashion ERIC_5245 SubTask 2 MAGS Well Installation SubTask 7

Activity/Phase: MAGS - Deep Zone SubTask 3 MAGS Testing SubTask 8

Project Manager: Nana Westmark SubTask 4 Supplemental Site Assessment Report - 2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

7/28/2023

Travel Vehicle Rental $1,320.00 $240.00 $1,080.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,320.00 $240.00 $1,080.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $14,270.00 $14,270.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $600.00 $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $14,870.00 $14,870.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $1,487.00 $1,487.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $16,357.00 $16,357.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,864.00 $0.00 $1,864.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $0.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,014.00 $0.00 $2,014.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $200.00 $80.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $3,005.00 $650.00 $2,355.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,205.00 $730.00 $2,475.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $37,173.94 $1,642.60 $19,916.90 $12,609.48 $3,004.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,427.80 $164.26 $258.99 $704.05 $300.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $38,601.74 $1,806.86 $20,175.89 $13,313.53 $3,305.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: $41,483.74

Cost from Delta CEF; ($2,882.00) $0.00 ($2,882.00) $0.00 $0.00 $0.00

Cost (Prior + Delta): $38,601.74 Auto-Calculated

Rounding Error: $0.00 Auto-Calculated

Final Total Cost: $38,601.74 Auto-Calculated

REV: 02/03 CEF Intertek-PSI Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Fashion ERIC_5245 SubTask 2 MAGS Well Installation

DATE: 7/28/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Technical Assistance 3 Notification to tenants 1

Project Scientist, R Fetter Field preparation 1 Travel (4 hr roundtrip) 8 Provide oversight for MAGS well installation 16 Stage IDW 2

TOTAL LABOR 31

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 2 $240.00

$0.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Groundwater Protection Well installation 1 $14,270.00 $14,270.00

Petrotech Southeast 4 $150.00 $600.00

$0.00

TOTAL $14,870.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00 0 $0.00

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Well installtion kit $325.00 day 2 $650.00

$650.00 Expendables $40.00 day 2 $80.00

TOTAL EQUIPMENT $730.00

IDW pickup, transport, disposal, water, per drum

FINAL --7/24/96

Page 3 CO-3 DC007 B Fashion ERIC_5245

ATTACHMENT B

DELTA COST ESTIMATE FORM/

Task #: DC007B-3 SubTask 1 Project Management SubTask 6

Site: Fashion ERIC_5245 SubTask 2 MAGS Well Installation SubTask 7

Activity/Phase: MAGS - Deep Zone SubTask 3 MAGS Testing SubTask 8

Project Manager: Nana Westmark SubTask 4 Supplemental Site Assessment Report - 2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.99 Project Manager 0 0.0 $0.00 Principal Consultant 0 0 0 0 0 0 0 0 0 0

$62.64 Senior Engineer, MR 0.0 0 0 0.0 0 0 0 0 0 0 $56.99 Senior Geologist, NW 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Scientist 0 0 0 0 0 0 0 0 0 0 $0.00 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0 $0.00 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0 $0.00 Florida Licensed Asbestos Consultant 0 0 0 0 0 0 0 0 0 0 $0.00 Project Manager 0 0 0 0 0 0 0 0 0 0

$36.06 Project Engineer 0 0 0 0 0 0 0 0 0 0 $38.20 Project Engineer, IK 0 0 0 0 0 0 0 0 0 0 $30.56 Project Engineer, MK 0 0 0 0 0 0 0 0 0 0 $37.02 Project Engineer, SJ 0 0 0 0 0 0 0 0 0 0 $33.74 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0 $29.86 Project Scientist 0 0 0 0 0 0 0 0 0 0 $29.77 Project Scientist, RF 0 0 0 0 0 0 0 0 0 0

$0.00 QA Officer 0 0 0 0 0 0 0 0 0 0 $31.51 Remediation Specialist, RH 0 0 0 0 0 0 0 0 0 0 $24.94 GIS / CAD Specialist, BW 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0

$24.94 Staff Scientist, BW 0 0 0 0 0 0 0 0 0 0 $30.91 Environmental Specialist, CC 0 0 0 0 0 0 0 0 0 0 $22.06 Environmental Specialist, MZ 0 0 0 0 0 0 0 0 0 0

$20.81 Administrative Assistant, BM 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 0.0 0 0 0 0.0 0 0 0 0 0 0

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7/28/2023

Task #: DC007B-3 SubTask 1 Project Management SubTask 6

Site: Fashion ERIC_5245 SubTask 2 MAGS Well Installation SubTask 7

Activity/Phase: MAGS - Deep Zone SubTask 3 MAGS Testing SubTask 8

Project Manager: Nana Westmark SubTask 4 Supplemental Site Assessment Report - 2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

7/28/2023

Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) ($1,970.00) ($1,970.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW ($650.00) ($650.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($2,620.00) ($2,620.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee ($262.00) ($262.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost ($2,882.00) ($2,882.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($2,882.00) $0.00 ($2,882.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($2,882.00) $0.00 ($2,882.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SubTask 2 MAGS Well Installation

DATE: 7/28/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Technical Assistance 0 Notification to tenants 0

Project Scientist, R Fetter Field preparation 0 Travel (4 hr roundtrip) 0 Provide oversight for MAGS well installation 0 Stage IDW 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 0 $0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Groundwater Protection Well installation -1 $16,240.00 ($16,240.00)

1 $14,270.00 $14,270.00

($1,970.00)

Petrotech Southeast -10 $125.00 ($1,250.00)

4 $150.00 $600.00

($650.00)

TOTAL ($2,620.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00 0 $0.00

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Well installtion kit $325.00 day 0 $0.00

$0.00 Expendables $40.00 day 0 $0.00

TOTAL EQUIPMENT $0.00

IDW pickup, transport, disposal, Page 3 Delta DC007 B Fashion ERIC_5245

ATTACHMENT C

ORIGINAL COST ESTIMATE FORM/

FDEP COST ESTI MATEContractor: Professional Service Industries, Inc. (Intertek-PSI)

Task #: SubTask 1 Project Management SubTask 6

Site: Fashion ERIC_5245 SubTask 2 MAGS Well Installation SubTask 7

Activity/Phase: MAGS - Deep Zone SubTask 3 MAGS Testing SubTask 8

Project Manager: Nana Westmark SubTask 4 Supplemental Site Assessment Report - 2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.99 Project Manager 12 11.5 $0.00 Principal Consultant 0 0 0 0 0 0 0 0 0 0

$62.64 Senior Engineer, MR 8.5 0 4 4.5 0 0 0 0 0 0 $56.99 Senior Geologist, NW 4 4 0 0 0 0 0 0 0 0

$0.00 Senior Scientist 0 0 0 0 0 0 0 0 0 0 $0.00 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0 $0.00 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0 $0.00 Florida Licensed Asbestos Consultant 0 0 0 0 0 0 0 0 0 0 $0.00 Project Manager 0 0 0 0 0 0 0 0 0 0

$36.06 Project Engineer 0 0 0 0 0 0 0 0 0 0 $38.20 Project Engineer, IK 51 0 29 22 0 0 0 0 0 0 $30.56 Project Engineer, MK 0 0 0 0 0 0 0 0 0 0 $37.02 Project Engineer, SJ 0 0 0 0 0 0 0 0 0 0 $33.74 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0 $29.86 Project Scientist 0 0 0 0 0 0 0 0 0 0 $29.77 Project Scientist, RF 27 27 0 0 0 0 0 0 0 0

$0.00 QA Officer 0 0 0 0 0 0 0 0 0 0 $31.51 Remediation Specialist, RH 27 0 27 0 0 0 0 0 0 0 $24.94 GIS / CAD Specialist, BW 3 0 0 3 0 0 0 0 0 0

$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0

$24.94 Staff Scientist, BW 0 0 0 0 0 0 0 0 0 0 $30.91 Environmental Specialist, CC 0 0 0 0 0 0 0 0 0 0 $22.06 Environmental Specialist, MZ 27 0 27 0 0 0 0 0 0 0

$20.81 Administrative Assistant, BM 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 159.5 12 31 87 29.5 0 0 0 0 0 0

Direct Labor $5,687.97 $654.37 $1,031.75 $2,804.75 $1,197.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $8,589.97 $988.23 $1,558.15 $4,235.73 $1,807.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $14,277.94 $1,642.60 $2,589.90 $7,040.48 $3,004.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9/7/2022 revised 9/14/2022, and 9/15/2022

FDEP COST ESTI MATEContractor: Professional Service Industries, Inc. (Intertek-PSI)

Task #: SubTask 1 Project Management SubTask 6

Site: Fashion ERIC_5245 SubTask 2 MAGS Well Installation SubTask 7

Activity/Phase: MAGS - Deep Zone SubTask 3 MAGS Testing SubTask 8

Project Manager: Nana Westmark SubTask 4 Supplemental Site Assessment Report - 2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

9/7/2022 revised 9/14/2022, and 9/15/2022

Travel Vehicle Rental $1,320.00 $240.00 $1,080.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,320.00 $240.00 $1,080.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $16,240.00 $16,240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $1,250.00 $1,250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $17,490.00 $17,490.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $1,749.00 $1,749.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $19,239.00 $19,239.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,864.00 $0.00 $1,864.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $0.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,014.00 $0.00 $2,014.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $200.00 $80.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $3,005.00 $650.00 $2,355.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,205.00 $730.00 $2,475.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $40,055.94 $1,642.60 $22,798.90 $12,609.48 $3,004.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,427.80 $164.26 $258.99 $704.05 $300.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $41,483.74 $1,806.86 $23,057.89 $13,313.53 $3,305.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SubTask 2 MAGS Well Installation DATE: 9/7/2022 revised 9/14/2022, and 9/15/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Technical Assistance 3 Notification to tenants 1

Project Scientist, R Fetter Field preparation 1 Travel (4 hr roundtrip) 8 Provide oversight for MAGS well installation 16 Stage IDW 2

TOTAL LABOR 31

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 2 $240.00

$0.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Groundwater Protection Well installation 1 $16,240.00 $16,240.00

Petrotech Southeast 10 $125.00 $1,250.00

$0.00

TOTAL $17,490.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00 0 $0.00

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Well installtion kit $325.00 day 2 $650.00

$650.00 Expendables $40.00 day 2 $80.00

TOTAL EQUIPMENT $730.00

IDW pickup, transport, disposal, water, per drum

Page 3 DC007 B Fashion ERIC_5245

SubTask 3 MAGS Testing DATE: 9/7/2022 revised 9/14/2022, and 9/15/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Technical Assistance 3 Notification to tenants 1

Environmental Specialist, M Zilske Travel (3 roundtrip) 12 Set up existing system for MAGS 3 Well head assembly set-up 1 Operate MAGS event (1 hrs - 8 points) 8 Collect measurements from other wells 3

Remediation Specialist, R Hanson

Travel (3 roundtrip) 12 Set up existing system for MAGS 3 Well head assembly set-up 1 Operate MAGS event (1 hrs - 8 points) 8 Site Restoration outside building 3

Project Engineer, I King Travel (3 roundtrip) 12 Technical review of data during testing 3 Collect vacuum and flow readings (1 hrs / point - 8 points) 8 Dismantle MAGS equipment 2 Written documentation of data collection 4

TOTAL LABOR 87

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck Environmental Specialist $120.00 day 3 $360.00 Equipment Van / Truck Remediation Specialist $120.00 day 3 $360.00 Equipment Van / Truck Project Engineer $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $1,080.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TO-15 $200.00 8 $1,600.00

Summa Canister $33.00 8 $264.00

$1,864.00 $0.00 Sample Shipping Large, overnight $150.00 1 $150.00

$0.00

TOTAL LAB $2,014.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Construction Pilot Test Kit $360.00 day 3 $1,080.00 Portable Generator $70.00 day 3 $210.00 Regen Blower $180.00 day 3 $540.00 GPS $175.00 day 3 $525.00

$2,355.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $2,475.00

Page 4 DC007 B Fashion ERIC_5245

SubTask 4 Supplemental Site Assessment Report - 2 DATE: 9/7/2022 revised 9/14/2022, and 9/15/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2 Make Recommendations for report 2 Sign and seal document 0.5

4.5

Project Engineer, I King Data reduction/evaluation 8 Preparation of Supplemental Assessment report 8 Report - Prepare final tables and figures 5 Provide ADaPT package 1

GIS/CADD Specialist, B Walker Develop maps 3

TOTAL LABOR 29.5

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 5 DC007 B Fashion ERIC_5245

ATTACHMENT D

SUBCONTRACTOR INVOICES

4030 14,270.00

05523622 Billable

10% Drilling

No PM Approval_____

700859

FDEP ASAP STAMP

700859 FDEP Agreement

700859 New Stamp3

Invoice

Invoice Date 5/2/2023

Invoice # 285439

BILL TO:

Professional Service Industries, Inc.

1748 33RD Street Orlando, FL 32839

Generator/ Job Site:

Fashion Cleaners 6502 Massachutes Avenue

New Port Richey, FL

23800 County Road 561 Astatula, FL 34705

P.O. Number 05520423499

Terms Net 30

Sales Rep JTI

Ship Date 5/2/2023

Manifest/BOL/#

042723-610

TOTAL DUE

Subtotal

Sales Tax (6.5%)

A charge of 1-1/2% per month, 18% per annum will be added monthly to balances unpaid 30 days after date of invoice. Collection Cost and/or reasonable attorneys fees will be due in the event any collection process becomes necessary.

Federal I.D. # 59-3142880

Tel: (407) 656-8114 Fax: (407) 358-5030 1-800-293-1743

DESCRIPTION QUANTITY UNIT TYPE UNIT PRICE AMOUNT

Disposal- Contaminated drill cuttings 4 Drum 150.00 600.00

Please remit payment to: Petrotech Southeast, Inc.

23800 County Road 561, Astatula, FL 34705

$600.00

$0.00

ATTACHMENT E

CHANGE ORDER EXPLANATION

From: Nana Westmark To: Knutson, Nicole; Crain, Kelly Subject: Fashion ERIC_5245 DC007B request for Change Order (deduct price) Date: Friday, July 28, 2023 4:35:12 PM Attachments: image001.png

DC007 B Fashion ERIC_5245.xlsx Delta DC007 B Fashion ERIC_5245.xlsx CO-3 DC007 B Fashion ERIC_5245.xlsx

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good Afternoon – PSI respectfully requests a Change Order (#3) to reflect a deduction in IDW costs and drilling costs.

Original TA DC007B =s $41,483.74 Delta = ($2882.00)

CO-3 = $38,601.74

Please see attached Level of Efforts and Cost Estimate.

Please contact me with any questions.

Kind Regards, Nana Westmark, PG, CHMM Senior Geologist / Principal Consultant Building & Construction Intertek-PSI

Direct 813 – 886 – 1075 Ext 219 Mobile 813 - 267 - 2519 Office 813 – 886 – 1075 Email Nana.Westmark@intertek.com Skype Nana.Westmark.Intertek www.intertek.com/building [gcc02.safelinks.protection.outlook.com] [gcc02.safelinks.protection.outlook.com]

Intertek-PSI 5801 Benjamin Center Drive, Suite 112 Tampa, Florida 33634

You’ll be amazed where you find Intertek.

Total Quality. Assured.

mailto:nana.westmark@intertek.com mailto:Nicole.Knutson@FloridaDEP.gov mailto:Kelly.Crain@dep.state.fl.us mailto:Nana.Westmark@intertek.com https://secure-web.cisco.com/10hkqr12ucaDJp7Aehhs5FoO8hIw86jwi2BAn-3rFuHbD_CV0Tp62XM_nC4kYhcqE2gqK3zj2RqWEXd0eb93-C_mF7dKW-b5OH0kCPgNiYh6zSwxWbr2Re0WEdR5DkDATZyCp_Foh0v6Ezg2S3IVikzgLwg4nY_hQ_yyJgc1FQhh2TdxECfJt6ud8T0yP3-NIT-GnC4tlw3siezGhC5xIyT0yTRAWMY5Uf13O9S5e0VLeOfO360p9igPkcYmWECKoEyVBmxkm8fMpiT8O_RB5Q-8AFEiOjKm_saBPy41Ps7kkgtsW42f6qJOpzEB2LUh9/https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2Fgcc02.safelinks.protection.outlook.com%2F%3Furl%3Dhttps%2A3A%2A2F%2A2Furldefense.com%2A2Fv3%2A2F__https%2A3A%2A2Fgcc02.safelinks.protection.outlook.com%2A2F%2A3Furl%2A3Dhttp%2A3A%2A2F%2A2Fwww.intertek.com%2A2Fbuilding%2A26data%2A3D04%2A7C01%2A7C%2A7Ce6e60d91fd384023f38108d9fc50956c%2A7Cf82250c421b643ada0095dbf5b6ad62d%2A7C0%2A7C0%2A7C637818245314857152%2A7CUnknown%2A7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%2A3D%2A7C3000%2A26sdata%2A3DvRbGaonR2CbnFAS0Dca4ptkjW7icXh66E0j0%2A2Fp%2A2BJ13I%2A3D%2A26reserved%2A3D0__%2A3BJSUlJSUlJSUlJSUlJSUlJSUl%21%21Ie6nUkZk%218l7e3Y_9sJi7T5snTt9AB9T_Ax7YUUjuMGVVA-7CA4KCgIJ_Ne3ClV4iOvUZ8FSSn-xc%2A24%26data%3D04%2A7C01%2A7C%2A7Cc4fcae041bcf49265f2808d9fc6ec1a8%2A7Cf82250c421b643ada0095dbf5b6ad62d%2A7C0%2A7C0%2A7C637818374916215896%2A7CUnknown%2A7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%2A3D%2A7C3000%26sdata%3DdPp%2A2BTVIDjNbYdwX0119sREuLath0qcAcEMHjGoPCymU%2A3D%26reserved%3D0__%3BJSUlJSUlJSUlJSoqKiolJSoqKioqKioqKioqJSUqKiolJSUlJSUlJSUlJSUlJSUlJQ%21%21Ie6nUkZk%2195zq0GPNR51LtfeZmnlqP7itfu4z7831lpWaoMqh49FmYhrXRV39llJQruqRDrG0SAP6%24 https://secure-web.cisco.com/1iOp824Cx5EAu8alii2AC1YoAbTPAipXkeVTAfLVGtvn_IGN56kvDlc2YR2QQ1oW6Lozu3HeGXntr3Gmvho7_-TdD-8qhtKI3p4qvXvvEFxOoGNkHXNIN7K29ip55-os3NxMJkUx0JhrQZN1WCYnLbS9whI7x1uhE81wMENEoI45oTeXBDJbSMB7Sh7VFQuSd8rNZ1t1WhMRxZOtI0QhXUKgr-osy92oIriM9izlTpmuCjJrlzczTiuVEO_COkDrVAxmf4ugPWOfavR5Pbec-zlSc4pU1OPADOlY7Toan1KIdBFl-SDnzEvMTAnbqd6UP/https%3A%2F%2Fwww.intertek.com%2Famazed%3Futm_source%3Dsignature%26utm_medium%3DOutlook%26utm_content%3Dyba%26utm_campaign%3Dyoullbeamazed

Cost Estimate

Contractor: Professional Service Industries, Inc. (Intertek-PSI)

Date: 9/7/2022 revised 9/14/2022, and 9/15/2022

Task #: SubTask 1 Project Management SubTask 6

Site: Fashion ERIC_5245 SubTask 2 MAGS Well Installation SubTask 7

Activity/Phase: MAGS - Deep Zone SubTask 3 MAGS Testing SubTask 8

Project Manager: Nana Westmark SubTask 4 Supplemental Site Assessment Report - 2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$56.99 Project Manager 12 11.5

$0.00 Principal Consultant 0 0 0 0 0 0 0 0 0 0

$62.64 Senior Engineer, MR 8.5 0 4 4.5 0 0 0 0 0 0

$56.99 Senior Geologist, NW 4 4 0 0 0 0 0 0 0 0

$0.00 Senior Scientist 0 0 0 0 0 0 0 0 0 0

$0.00 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0

$0.00 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0

$0.00 Florida Licensed Asbestos Consultant 0 0 0 0 0 0 0 0 0 0

$0.00 Project Manager 0 0 0 0 0 0 0 0 0 0

$36.06 Project Engineer 0 0 0 0 0 0 0 0 0 0

$38.20 Project Engineer, IK 51 0 29 22 0 0 0 0 0 0

$30.56 Project Engineer, MK 0 0 0 0 0 0 0 0 0 0

$37.02 Project Engineer, SJ 0 0 0 0 0 0 0 0 0 0

$33.74 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0

$29.86 Project Scientist 0 0 0 0 0 0 0 0 0 0

$29.77 Project Scientist, RF 27 27 0 0 0 0 0 0 0 0

$0.00 QA Officer 0 0 0 0 0 0 0 0 0 0

$31.51 Remediation Specialist, RH 27 0 27 0 0 0 0 0 0 0

$24.94 GIS / CAD Specialist, BW 3 0 0 3 0 0 0 0 0 0

$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0

$24.94 Staff Scientist, BW 0 0 0 0 0 0 0 0 0 0

$30.91 Environmental Specialist, CC 0 0 0 0 0 0 0 0 0 0

$22.06 Environmental Specialist, MZ 27 0 27 0 0 0 0 0 0 0

$20.81 Administrative Assistant, BM 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 159.5 12 31 87 29.5 0 0 0 0 0 0

Direct Labor $5,687.97 $654.37 $1,031.75 $2,804.75 $1,197.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $8,589.97 $988.23 $1,558.15 $4,235.73 $1,807.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $14,277.94 $1,642.60 $2,589.90 $7,040.48 $3,004.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $1,320.00 $240.00 $1,080.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $1,320.00 $240.00 $1,080.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $16,240.00 $16,240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $1,250.00 $1,250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $17,490.00 $17,490.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $1,749.00 $1,749.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $19,239.00 $19,239.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $1,864.00 $0.00 $1,864.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $150.00 $0.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $2,014.00 $0.00 $2,014.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $200.00 $80.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $3,005.00 $650.00 $2,355.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $3,205.00 $730.00 $2,475.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $40,055.94 $1,642.60 $22,798.90 $12,609.48 $3,004.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $1,427.80 $164.26 $258.99 $704.05 $300.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $41,483.74 $1,806.86 $23,057.89 $13,313.53 $3,305.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF Intertek-PSI &"Courier New,Bold"&10Page &P

Formula Sheet

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Labor Costs $655.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $250.56 $281.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$227.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $1,107.80 $840.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$803.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $850.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $74.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $595.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars $655.39 $1,031.75 $2,804.75 $1,197.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Project Management $5,033.60 = sum of Direct Labor Costs from Subtasks 2 through 10

$654.37 =13% of Direct Labor Costs (Project Management)

11.482 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Service Fee $1,624.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$1,749.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

LOE 2 Well Install

SITE : Fashion ERIC_5245

SubTask 2 MAGS Well Installation

DATE: 9/7/2022 revised 9/14/2022, and 9/15/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Technical Assistance 3

Notification to tenants 1

Project Scientist, R Fetter Field preparation 1

Travel (4 hr roundtrip) 8

Provide oversight for MAGS well installation 16

Stage IDW 2

TOTAL LABOR 31

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 2 $240.00

$0.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Groundwater Protection Well installation 1 $16,240.00 $16,240.00

Petrotech Southeast IDW pickup, transport, disposal, water, per drum 10 $125.00 $1,250.00

$0.00

TOTAL $17,490.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00 0 $0.00

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Well installtion kit $325.00 day 2 $650.00

$650.00

Expendables $40.00 day 2 $80.00

TOTAL EQUIPMENT $730.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

&"Calibri,Regular"&9FINAL --7/24/96&"Courier New,Regular"&12 &"Calibri,Regular"&9Page &P &"Calibri,Regular"&9&F

LOE 3 MAGS Test

SITE : Fashion ERIC_5245

SubTask 3 MAGS Testing

DATE: 9/7/2022 revised 9/14/2022, and 9/15/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Technical Assistance 3

Notification to tenants 1

Environmental Specialist, M Zilske

Travel (3 roundtrip) 12

Set up existing system for MAGS 3

Well head assembly set-up 1

Operate MAGS event (1 hrs - 8 points) 8

Collect measurements from other wells 3

Remediation Specialist, R Hanson

Travel (3 roundtrip) 12

Set up existing system for MAGS 3

Well head assembly set-up 1

Operate MAGS event (1 hrs - 8 points) 8

Site Restoration outside building 3

Project Engineer, I King Travel (3 roundtrip) 12

Technical review of data during testing 3

Collect vacuum and flow readings (1 hrs / point - 8 points) 8

Dismantle MAGS equipment 2

Written documentation of data collection 4

TOTAL LABOR 87

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck Environmental Specialist $120.00 day 3 $360.00

Equipment Van / Truck Remediation Specialist $120.00 day 3 $360.00

Equipment Van / Truck Project Engineer $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $1,080.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TO-15 $200.00 8 $1,600.00

Summa Canister $33.00 8 $264.00

$1,864.00 $0.00

Sample Shipping Large, overnight $150.00 1 $150.00

$0.00

TOTAL LAB $2,014.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Construction Pilot Test Kit $360.00 day 3 $1,080.00

Portable Generator $70.00 day 3 $210.00

Regen Blower $180.00 day 3 $540.00

GPS $175.00 day 3 $525.00

$2,355.00

Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $2,475.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

&"Calibri,Regular"&9Page &P &"Calibri,Regular"&9&F

LOE 4 Report

SITE : Fashion ERIC_5245

SubTask 4 Supplemental Site Assessment Report - 2

DATE: 9/7/2022 revised 9/14/2022, and 9/15/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2

Make Recommendations for report 2

Sign and seal document 0.5

4.5

Project Engineer, I King Data reduction/evaluation 8

Preparation of Supplemental Assessment report 8

Report - Prepare final tables and figures 5

Provide ADaPT package 1

GIS/CADD Specialist, B Walker Develop maps 3

TOTAL LABOR 29.5

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL EQUIPMENT $0.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

&"Calibri Light,Regular"&9Page &P &"Calibri,Regular"&9&F

Schedule

Fashion ERIC_5245

Deliverables

Deliverables Deliverable Due Date

SubTask 1 Project Management Upon completion of Task Assignment

SubTask 2 MAGS Well Installation February 25, 2023

SubTask 3 MAGS Testing February 25, 2023

SubTask 4 Supplemental Site Assessment Report - 2 February 25, 2023

Invoice Schedule

Requirements for Invoice Submittal Amount to be Invoiced

SubTasks 1, 2, 3, & 4- Submittal & approval of SSA-2, & IDW manifest $41,483.74

Contractor: Professional Service Industries, Inc. (Intertek-PSI)

Date: 7/28/23

Task #: DC007B-3 SubTask 1 Project Management SubTask 6

Site: Fashion ERIC_5245 SubTask 2 MAGS Well Installation SubTask 7

Activity/Phase: MAGS - Deep Zone SubTask 3 MAGS Testing SubTask 8

Project Manager: Nana Westmark SubTask 4 Supplemental Site Assessment Report - 2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$56.99 Project Manager 0 0.0

$0.00 Principal Consultant 0 0 0 0 0 0 0 0 0 0

$62.64 Senior Engineer, MR 0.0 0 0 0.0 0 0 0 0 0 0

$56.99 Senior Geologist, NW 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Scientist 0 0 0 0 0 0 0 0 0 0

$0.00 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0

$0.00 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0

$0.00 Florida Licensed Asbestos Consultant 0 0 0 0 0 0 0 0 0 0

$0.00 Project Manager 0 0 0 0 0 0 0 0 0 0

$36.06 Project Engineer 0 0 0 0 0 0 0 0 0 0

$38.20 Project Engineer, IK 0 0 0 0 0 0 0 0 0 0

$30.56 Project Engineer, MK 0 0 0 0 0 0 0 0 0 0

$37.02 Project Engineer, SJ 0 0 0 0 0 0 0 0 0 0

$33.74 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0

$29.86 Project Scientist 0 0 0 0 0 0 0 0 0 0

$29.77 Project Scientist, RF 0 0 0 0 0 0 0 0 0 0

$0.00 QA Officer 0 0 0 0 0 0 0 0 0 0

$31.51 Remediation Specialist, RH 0 0 0 0 0 0 0 0 0 0

$24.94 GIS / CAD Specialist, BW 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0

$24.94 Staff Scientist, BW 0 0 0 0 0 0 0 0 0 0

$30.91 Environmental Specialist, CC 0 0 0 0 0 0 0 0 0 0

$22.06 Environmental Specialist, MZ 0 0 0 0 0 0 0 0 0 0

$20.81 Administrative Assistant, BM 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 0.0 0 0 0 0.0 0 0 0 0 0 0

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) ($1,970.00) ($1,970.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW ($650.00) ($650.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($2,620.00) ($2,620.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee ($262.00) ($262.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost ($2,882.00) ($2,882.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00…