Task Assignment Change Order Summary
This document is a Task Assignment Change Order (TACO #1) issued by the State of Florida Department of Environmental Protection (FDEP) to Professional Service Industries, Inc. (Intertek-PSI) for environmental remediation and monitoring services at the Custom Commerce site (ERIC_5234) located in Port Richey, Pasco County, Florida. The change order amends the original Task Assignment DC006C under Contract HW686 and was executed on September 25, 2024, with departmental approval from Jennifer Farrell and contractor authorization from Joshua S. Newell.
The change order reduces the total task value by $233.00 through the elimination of one analytical sample from Subtask 3 (2nd Quarter Monthly Operations and Maintenance), resulting in a revised total contract value of $63,009.18, comprised of $54,369.18 in fixed unit rate costs and $8,640.00 in cost reimbursement expenses for utilities. The scope includes twelve months of operations and maintenance activities, two semi-annual Remedial Action System Status (RASS) reports, one groundwater monitoring event, and associated deliverables with a completion date of February 28, 2025. Labor costs, travel, subcontractor services, laboratory analytical testing, field equipment, and utilities are itemized across ten subtasks, with quarterly invoicing requirements tied to FDEP approval of specific deliverables including monthly operations summaries, RASS reports, and analytical results.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
DC006C 1 HW686
Mary Uribe 850-245-8990 Contractor Professional Services Industries, Inc. (Intertek-PSI) Contractor
Contractor Josh Newell Contractor 863-712-4342
ERIC_5234
Custom Commerce Laundry
✔ $ 54,369.18 $ 54,602.18 ✔ $ 8,640.00 $ 8,640.00
$ 63,009.18 $ 63,242.18 ✔ Completion
Completion 02/28/2025 02/28/2025 0
1 1 1
Contractor
Digitally signed by Joshua S Newell Date: 2024.09.25 12:12:47-04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.09.25 11:56:48 -04'00'
Reduction of 1 analytical sample from Subtask 3
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW686
DC006C
$ 63,009.18
Subtask 2 & 3: Email Summary of 1st & 2nd Qtr Monthly O&M (Nov, Dec, Jan & Feb, March, April)
Subtask 4: RASS
Subtask 5 & 6: Email Summary of 3rd & 4th Qtr Monthly O&M (May, June, July & Aug, Sep, Oct)
Subtask 7: RASS
Subtask 1, 9 & 10: Project Management, Field Package & Analytical Results for VOH Groundwater Monitoring & PFAS Groundwater Monitoring, IDW
Subtask 8: Utilities
Subtask 2 & 3: FDEP Approval of Email Summary of 1st & 2nd Qtr Monthly O&M (Nov, Dec, Jan & Feb, March, April)
Subtask 5 & 6: FDEP Approval of Email Summary of 3rd & 4th Qtr Monthly O&M (May, June, July & Aug, Sep, Oct)
Subtask 7: FDEP Approval of RASS
Subtask 8: FDEP Approval of Receipt of Utilities Bill for 12 months (Cost Plus Fixed Fee) Utilities not to exceed $8,640.00, handling fee = $480.00
Subtask 1, 9 & 10: FDEP Approval of Project Management, Field Package & Analytical Results for VOH Groundwater Monitoring & PFAS Groundwater Monitoring, Waste Manifest
Subtask 4: FDEP Approval of RASS
05/20/2024
05/30/2024
11/20/2024
11/30/2024
01/15/2025
05/30/2024
$ 4,793.39
$ 15,608.33
$ 17,581.79
$ 6,332.12
$ 9,573.55
$ 9,120.00
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette NNuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: ERIC_5234
Custom Commerce Laundry
FROM: Mary Uribe, Project Manager
SUBJECT: Negotiation Summary
HW686 DC006C
DATE: September 19th, 2024
PSI will perform 12 months of Operations and Maintenance with two semi-annual Remedial Action System Status reports, and one groundwater monitoring event in accordance with the PSI scope of work, cost estimate, and schedule received on November 13th 2023.
Summary of changes includes subtracting the cost of one analytical sample from Subtask 3.
Total task amount is $63,009.18 with a change in cost of - $233.00. PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is January 15th, 2025. Task completion date is February 28th, 2025.
F D E P
C O S T
E S T I M A T E
R E V
C E F
P S I I n t e r t e k
P a g e
E P
C O S T
E S T I M A T E
R E V
C E F
P S I I n t e r t e k
P a g
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Custom Commerce ERIC_5234 SubTask 2 1st Qtr Monthly O&M
DATE: 11/13/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), 3 Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4
Total hours: 19 Staff Scientist, M Mater Monthly
Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Additional hours to collect vapor analytical samples 2
Total hours: 32
TOTAL LABOR 54
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$200.00 2 $400.00
Summa cannisters $33.00 2 $66.00 $466.00
Shipping, large, overnight $150.00 1 $150.00
TOTAL LAB $616.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00
$1,305.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $1,425.00
EQUIPMENT PROCUREMENT RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
TO-15 (VOCs) (infl and eff)
FINAL --7/24/96
SubTask 3 2nd Qtr Monthly O&M
DATE: 11/13/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3
Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4
Total hours: 19 Staff Scientist, M Mater Monthly
Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Additional hours to collect vapor analytical samples 3
Total hours: 33
TOTAL LABOR 55
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
$0.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TO-15 (VOCs) (4 SVE wells, infl and eff) $200.00 5 $1,000.00
Summa cannisters $33.00 5 $165.00 $1,165.00
Shipping, large, overnight $150.00 1 $150.00
TOTAL LAB $1,315.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00
$1,305.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $1,425.00
SubTask 4 RASS
DATE: 11/13/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS 2
Total hours: 4
Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation report 8 Create figures 4 Report - Prepare final tables and figure 8 Sign and Seal RASS 1
Total hours: 33
CADD / GIS Specialist, D Grove Prepare figures for RASS 2
TOTAL LABOR 39
VEHICLE TYPE RATE UNIT USEAGE
$0.00
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00
TOTAL EQUIPMENT $0.00
SubTask 5 3rd Qtr Monthly O&M
DATE: 11/13/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3
Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4
Total hours: 19
Staff Scientist, M Mater Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Additional hours to collect vapor analytical samples 2
Total hours: 32
TOTAL LABOR 54
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
$0.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$200.00 2 $400.00
Summa cannisters $33.00 2 $66.00 $466.00
Shipping, large, overnight $150.00 1 $150.00
TOTAL LAB $616.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00
$1,305.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $1,425.00
TO-15 (VOCs) (monthly infl and eff, + one event of 4 SVE air samples at beginning of quarter)
SubTask 6 4th Qtr Monthly O&M (& shutdown evaluation)
DATE: 11/13/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3
Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4 Shutdown evaluation 5
Total hours: 24
Staff Scientist, M Mater Month 10 (Shutdown Evaluation) Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly (System re-start) Field preparation 1 Mobilization 3 Conduct O&M, optimize performance, allow one pore volume 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 4 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Additional hours to collect vapor analytical samples 4
Total hours: 36
TOTAL LABOR 63
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
$0.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$200.00 10 $2,000.00
Summa cannisters $33.00 10 $330.00 $2,330.00
Shipping, large , overnight $150.00 1 $150.00
TOTAL LAB $2,480.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00
$1,305.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $1,425.00
TO-15 (VOCs) (infl and eff per Qtr,) + one event to include 4 SVE wells
SubTask 7 RASS
DATE: 11/13/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS/ Groundwater Report 5
Total hours: 7
Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation/ groundwater monitoring report 12 Create Final figures 4 Report - Prepare final tables and figure 8 Sign and Seal RASS 1
Total hours: 37
CADD / GIS Specialist, D Grove Prepare figures for RASS 8
TOTAL LABOR 52
VEHICLE TYPE RATE UNIT USEAGE
$0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SubTask 8 Utilities
DATE: 11/13/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR
VEHICLE TYPE RATE UNIT USEAGE
$0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Duke Energy Electric $600.00 Month 12 $7,200.00
Century Link Phone $120.00 Month 12 $1,440.00 $8,640.00
Handling fee Electric $20.00 Month 12 $240.00 Handling fee phone $20.00 Month 12 $240.00
$480.00
$0.00
TOTAL $9,120.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00
SubTask 9 VOH Groundwater Monitoring
DATE: 11/13/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist, N Westmark event lab kit request, equipment selection, tenant notification 3 Total hours: 3
Environmental Specialist, CC Field preparation 1 Travel (1 roundtrips for gw sampling) 3 Collect groundwater samples 6 shallow wells @ 1 hour each 6 1 intermediate wells @ 1.5 hrs each 1.5 Documentation of groundwater sampling & measurements 2 Stage Drum 1 Pick-up, / Drop off sample kits 1
Total hours: 15.5
TOTAL LABOR 18.5
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 2 $240.00
$0.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
$0.00
Petrotech Southeast, Inc. IDW transport & disposal 1 $100.00 $100.00 $0.00 $0.00
TOTAL $100.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
$0.00
EPA Method 8260 $73.00 7 1 $584.00 PFAS Analyses to be provided by FDEP
$584.00 $0.00 $0.00
$0.00 $0.00
TOTAL LAB $584.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Shallow Groundwater Sampling Kit $290.00 day 2 $580.00
Drum for IDW $100.00 each 1 $580.00 $100.00 $680.00
Expendables $40.00 day 2 $80.00
TOTAL EQUIPMENT $760.00
SubTask 10 PFAS Groundwater Monitoring
DATE: 11/13/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities PFAS Sampling
Environmental Specialist, CC Additional decontamination for PFAS 2 Documentation of PFAS groundwater sampling 1 Inventory cooler, prepare cooler for shipping to FDEP 2.5
Total Hours: 5.5
Project Scientist, S Luth Prepare field deliverable and PFAS analytical results Total Hours: 3
GIS / CAD Specialist, D Grove Create maps, figures Total Hours: 2
Senior Geologist, N Westmark Provide Evaluation and email summary 1 Data review, develop deliverable 2
Total Hours: 3
TOTAL LABOR 13.5
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$834.20 week 0 $0.00 Deep Groundwater Sampling Kit $415.00 day 0 $0.00
$0.00 Expendables $40.00 day 0 $0.00
55--gallon drum $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USEAGE
Equipment Van / Truck (GW Sampling) $120.00 day 0 $0.00
$420.00 week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC #IDW
EPA Method 8260 $73.00 0 0 0 $0.00 PFAS Analyses to be provided by FDEP $104.00 0 $0.00
$0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
Petrotech IDW drum pickup 0 $125.00 $0.00
TOTAL $0.00
CO-1 Custom Commerce ERIC_5234 05523856
E P
C O S T
E S T I M A T E
R E V
C E F
P S I I n t e r t e k
P a g
E P
C O S T
E S T I M A T E
R E V
C E F
P S I I n t e r t e k
P a g
SubTask 3 2nd Qtr Monthly O&M
DATE: 9/9/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 0
Total hours: 0
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 0 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 0 O&M checklists (1 hr/month) 0 Quarterly email summary to FDEP 0
Total hours: 0 Staff Scientist, M Mater Monthly
Field preparation 0 Mobilization 0 Conduct O&M, optimize performance 0 Collect vacuum influence / vacuum flow measurements 0 Collect vapor samples for PID screening 0 Monthly preparation, recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0
Monthly Field preparation 0 Mobilization 0 Conduct O&M, optimize performance 0 Collect vacuum influence / vacuum flow measurements 0 Collect vapor samples for PID screening 0 Monthly preparation, recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0
Monthly Field preparation 0 Mobilization 0 Conduct O&M, optimize performance 0 Collect vacuum influence / vacuum flow measurements 0 Collect vapor samples for PID screening 0 Monthly preparation, recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0
Additional hours to collect vapor analytical samples 0
Total hours: 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 0 $0.00
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TO-15 (VOCs) (4 SVE wells, infl and eff) $200.00 -1 ($200.00)
Summa cannisters $33.00 -1 ($33.00) ($233.00)
Shipping, large, overnight $150.00 0 $0.00
TOTAL LAB ($233.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 0 $0.00 Construction/O&M supplies $75.00 day 0 $0.00
$0.00 Expendables $40.00 day 0 $0.00
E P
C O S T
E S T I M A T E
R E V
C E F
P S I I n t e r t e k
P a g
E P
C O S T
E S T I M A T E
R E V
C E F
P S I I n t e r t e k
P a g
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW686
DC006C February 28, 2025
This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct 12 months of O&M with two semi-annual Remedial Action System Status reports, and a groundwater monitoring event in accordance with the PSI scope of work, cost estimate, and schedule received on November 13, 2023.
Kelly Crain 850-245-8953 Professional Service Industries, Inc. (Intertek-PSI)
Professional Service Industries, Inc. (Intertek-PSI)
Nana G. Westmark
ERIC_5234
6642 Ridge Road Port Richey, Pasco County, Florida
Custom Commerce
$ 54,602.18
$ 8,640.00
$ 63,242.18
Scope of Work
Nana Westmark
Senior Geologist / Principal Consultant
Nana G Westmark Digitally signed by Nana G Westmark Date: 2023.11.30 11:44:56 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2023.11.28 16:15:14 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST