CN-370000-HW686-DC025A.pdf

PDF 603 KB Posted

Attached to
Master Agreement FL|HW686|26652fe61cf76d14a6798f2369f5dddb
Contract number
HW686
Issued by
Florida

About this file

This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection under Contract Number HW686. The task assignment is between the State of Florida Department of Environmental Protection (Department) and Professional Service Industries, Inc. (PSI), with Ben Grubbs serving as the Department Project Manager and Josh Newell as the Contractor's Project Manager. The task assignment is identified as DC025A and carries a completion date of November 15, 2024.

The task assignment authorizes PSI to generate five Site Assessment Work Plans (SAWPs) for drycleaning facilities at multiple locations. The compensation structure is based on a fixed unit rate totaling $25,000.00, which represents the total task assignment value. The deliverables are divided into two subtasks: Subtask 1 requires SAWPs for McNatts Cleaners, Vick's Cleaners Inc., and Sterling Cleaners with a due date of August 30, 2024, and an invoiced amount of $15,000.00; Subtask 2 requires SAWPs for Americlean Dry Cleaners and Craft Master Cleaners Inc. with a due date of September 30, 2024, and an invoiced amount of $10,000.00. The scope of work includes site reviews utilizing information from the Information Portal/ERIC/OCULUS system, site visits with completion of drycleaning site visit checklists, and comprehensive work plans that incorporate site narratives, figures, sampling plans, proposed schedules, and cost estimate worksheets with specific attention to PFAS screening.

View the file

Other files

File Type Posted
CN-370000-HW686-DC003C.pdf PDF
CN-370000-HW686-DC004A.pdf PDF
CN-370000-HW686-DC004B.pdf PDF
CN-370000-HW686-DC006B.pdf PDF
CN-370000-HW686-DC006C.pdf PDF
CN-370000-HW686-DC008A.pdf PDF
CN-370000-HW686-DC008C.pdf PDF
CN-370000-HW686-DC009A.pdf PDF
CN-370000-HW686-DC010E.pdf PDF
CN-370000-HW686-DC011C.pdf PDF
CN-370000-HW686-DC012A.pdf PDF
CN-370000-HW686-DC013B.pdf PDF
CN-370000-HW686-DC013C.pdf PDF
CN-370000-HW686-DC01ACO5.pdf PDF
CN-370000-HW686-DC020A.pdf PDF
CN-370000-HW686-DC027A.pdf PDF
CN-370000-HW686-DC029A.pdf PDF
CN-370000-HW686-DC02ECO1.pdf PDF
CN-370000-HW686-DC02ECO2.pdf PDF
CN-370000-HW686-DC030A.pdf PDF
CN-370000-HW686-DC03ACO1.pdf PDF
CN-370000-HW686-DC03DCO1.pdf PDF
CN-370000-HW686-DC04ACO1.pdf PDF
CN-370000-HW686-DC05CCO1.pdf PDF
CN-370000-HW686-DC05CCO2.pdf PDF
CN-370000-HW686-DC07BCO2.pdf PDF
CN-370000-HW686-DC07ECO1.pdf PDF
CN-370000-HW686-DC10ACO1.pdf PDF
CN-370000-HW686-DC11ACO1.pdf PDF
CN-370000-HW686-DC14BCO1.pdf PDF
CN-370000-HW686-DC19BCO1.pdf PDF
CN-370000-HW686-DC21BCO2.pdf PDF
CN-370000-HW686-DC21BCO3.pdf PDF
CN-370000-HW686-DC22ACO1.pdf PDF
CN-370000-HW686-DCO24B.pdf PDF
CN-370000-HW686-FIL11.pdf PDF
CN-370000-HW686-FIL4.pdf PDF
CN-370000-HW686-FIL5.pdf PDF
CN-370000-HW686-FIL7.pdf PDF
CN-370000-HW686-HW006A.pdf PDF
CN-370000-HW686-HW007A.pdf PDF
CN-370000-HW686-HW010A.pdf PDF
CN-370000-HW686-SA253.pdf PDF
CN-370000-HW686-SA253CO1.pdf PDF
CN-370000-HW686-DC001B.pdf PDF
CN-370000-HW686-DC002B.pdf PDF
CN-370000-HW686-DC002D.pdf PDF
CN-370000-HW686-DC003F.pdf PDF
CN-370000-HW686-DC004D.pdf PDF
CN-370000-HW686-DC005B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW686

DC025A November 15, 2024

This Task Assignment authorizes PSI to generate five Site Assessment Work Plans.

Ben Grubbs 850-245-8992 Professional Service Industries, Inc. (PSI)

Josh Newell 863-712-4342

Multiple

Multiple

Multiple

$ 25,000.00

$ 25,000.00

Scope of Work

Professional Service Industries, Inc. (PSI)

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.04.04 15:25:13 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Site Assessment Work Plan (SAWP) Task List

Site Review:

1. Information Portal/ERIC/OCULUS Review

a. Review applicable documents

b. Application

c. Site Screening Report

d. Other assessment data

e. Permitting/Compliance/Enforcement history

2. Additional information as available and as needed

a. Google maps, aerial photographs, topographical maps, building/planning department records, land use maps, insurance maps

b. Other regulatory agency records

c. Contact DC operator for operations history. May be able to find operator even if DC is no longer operating

Site Visit:

1. Complete Drycleaning Site Visit Checklist

2. Verify Site Screening Report information, especially sample location(s)

3. Identify likely source/release areas (machine location, service door, floor drains, lint trap, sewer line, septic tank, dumpster, ASTs/USTs). Look for evidence on floors/walls for former machine location.

4. Identify above/below ground utilities and potential impediments to assessment activities

5. Verify accuracy of site map, revise as necessary

6. Interview operator/owner for site history

7. Discuss work plan elements with property owner and get direction regarding approach to tenants, and schedule.

SAWP:

1. Completed Drycleaning Site Visit Checklist

2. Site summary/narrative – Initial conceptual site model (brief text)

- Current status and history of DC operations

- Primary solvents used both prior to and after eligibility determination

- Owner/operator/tenant information

- Status of site structures (original, renovated, razed/redeveloped, vacant)

- Historical site assessment/remediation information

- Anticipated lithology, depth to water, and groundwater flow direction

- Known or anticipated source areas -Site Assessment Approach

3. Figures

- Topo

- Site features, aerial view, facility layout, waste storage areas, utilities, etc.

- Proposed sampling locations (soil, MAGS, DPT profiling, MWs, sediment, surface water, sewer/septic/lint trap)

4. Sampling Plan/Checklist (templated, see Word SAWP Summary Checklist) - Including proposed number of samples for soil, MAGs, groundwater, etc.

5. Proposed schedule from approval of SAWP to submittal of SAR

6. Cost Estimate (CE)/Level of Effort (LOE) Worksheets, including subcontractor quotes, as appropriate. The CE/LOE should be submitted upon approval of the SAWP and under separate cover.

Notes: 1) No documents that are available in ERIC or HASPs should be included with the SAWP, 2) No EDR or other ESA-like reports are required, 3) No offsite property owner/use or well survey information is required, 4) No potable well survey, 5) SOW should include PFAS screening (see guidance)

File details come from the government source that posted it. Updated .