CN-370000-CN330-T33.pdf
PDF 402 KB Posted
- Contract number
- CN330
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form and associated proposal documentation for the Florida Department of Environmental Protection (FDEP), issued under Contract CN330 for Project 61388C. The contract involves the FDEP's Bureau of Design and Construction, the consulting firm Cummins Cederberg, Inc. (a coastal and marine engineering firm), and John Pennekamp Coral Reef State Park located in Key Largo, Monroe County, Florida. The task assignment was executed on March 27, 2025, with project management oversight provided by James Post or successor and FDEP contract management by Ralph Perkins or successor.
The scope of work encompasses construction phase support services for the West Bulkhead - South Boat Ramp Replacement Project, consisting of three subtasks: Subtask 1A (Submittals Review), Subtask 1B (RFI Responses), and Subtask 1C (Site Visits). Services include shop drawing reviews, four submittal reviews, four RFI responses, two construction site visits with final inspection, and materials testing as required. The fixed price contract totals $11,678.64, with breakdown as follows: Subtask 1A at $2,990.76, Subtask 1B at $1,505.76, and Subtask 1C at $7,182.12. The project completion date is October 31, 2025, and payment will be made upon approval of deliverables. All deliverables are to be provided in PDF format, and the contract includes provisions for project coordination with the South Florida Water Management District (SFWMD) and United States Army Corps of Engineers (USACE) project completion certifications.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN330 33 FDEP 61388C
West Bulkhead - South Boat Ramp Replacement
Cummins Cederberg
Jason Cummins, P.E. (786) 863-1109 jcumminscedeberg.com
Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
Construction phase services including Shop Drawings reviews, once a month on-site inspections with reports, Substantial Completion inspection with punch list report, and SFWMD and/or USACE project completion Certification (s)
James Post or successor
Upon Execution $ 11,678.64 10/31/25
$ 11,678.64
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2025.03.26 09:47:21 -04'00'
James Post James Post Digitally signed by James Post Date: 2025.03.26 15:14:45 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2025.03.27 08:59:21 -04'00'
Jason Cummins, P.E.
Digitally signed by Jason R Cummins Date: 2025-03-27 11:23:08
Michael Foster, P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2025.03.28 13:11:36 -04'00'
61388C 37505018015 080039/23 423001 U3200 131500 QK $ 11,678.64
$ 11,678.64
John Pennekamp Coral Reef State Park
61388C