This is a proposal/task assignment document for engineering and environmental consulting services submitted by Cummins Cederberg, Inc. to the State of Florida, Department of Environmental Protection (DEP). The project involves Contract CN330, Task Assignment 20, Change Order 2, Project 61472C for fishing pier replacements and bulkhead improvements at Bill Baggs Cape Florida State Park in Key Biscayne, Miami-Dade County, Florida. The proposal is addressed to Mr. Garland Sandel at the Florida DEP office in Tallahassee and includes work coordination with Miami-Dade County regulatory agencies, the South Florida Water Management District (SFWMD), the U.S. Army Corps of Engineers (USACE), and the National Marine Fisheries Service (NMFS).

The scope of services encompasses geotechnical investigations, environmental surveys (asbestos and lead-based paint screening), permitting applications and processing with multiple regulatory agencies (DERM Class I Coastal Construction Permit, SFWMD SWERP Exemption, USACE Section 10/404 authorization), and engineering design at 60% and 100% completion levels. The fixed price contract totals $101,015.63, comprising $100,915.63 in labor and consultant costs distributed across ten subtasks, plus $100.00 in reimbursable permit processing fees. Key deliverables include geotechnical reports, conceptual design drawings with three alternatives and opinion of probable cost analyses, 60% and 100% construction documents with signed and sealed specifications and calculations, and environmental permit applications. Project execution timeline ranges from 30 to 150 calendar days depending on subtask, with the total project schedule extending over approximately one year due to anticipated federal consultation requirements related to endangered species (Orbicella faveolata coral).

View the file

Other files

File Type Posted
CN-370000-CN330-T10.pdf PDF
CN-370000-CN330-T16.pdf PDF
CN-370000-CN330-T17.pdf PDF
CN-370000-CN330-T18.pdf PDF
CN-370000-CN330-T20.pdf PDF
CN-370000-CN330-T25.pdf PDF
CN-370000-CN330-T27.pdf PDF
CN-370000-CN330-T35.pdf PDF
CN-370000-CN330-T3CO1.pdf PDF
CN-370000-CN330-T3CO2.pdf PDF
CN-370000-CN330-T5.pdf PDF
CN-370000-CN330-T5CO1.pdf PDF
CN-370000-CN330-T5CO2.pdf PDF
CN-370000-CN330-T6.pdf PDF
CN-370000-CN330-T8CO3.pdf PDF
CN-370000-CN330.pdf PDF
CN-370000-CN330-R1.pdf PDF
CN-370000-CN330-T11.pdf PDF
CN-370000-CN330-T12CO1.pdf PDF
CN-370000-CN330-T14.pdf PDF
CN-370000-CN330-T15.pdf PDF
CN-370000-CN330-T15CO1.pdf PDF
CN-370000-CN330-T19.pdf PDF
CN-370000-CN330-T1CO1.pdf PDF
CN-370000-CN330-T21.pdf PDF
CN-370000-CN330-T22CO1.pdf PDF
CN-370000-CN330-T23CO1.pdf PDF
CN-370000-CN330-T28.pdf PDF
CN-370000-CN330-T29.pdf PDF
CN-370000-CN330-T30 CO1.pdf PDF
CN-370000-CN330-T30.pdf PDF
CN-370000-CN330-T31.pdf PDF
CN-370000-CN330-T34.pdf PDF
CN-370000-CN330-T4.pdf PDF
CN-370000-CN330-T7.pdf PDF
CN-370000-CN330-T8CO2.pdf PDF
CN-370000-CN330-T8CO5.pdf PDF
CN-370000-CN330-CMC1.pdf PDF
CN-370000-CN330-CMC2.pdf PDF
CN-370000-CN330-CMC4.pdf PDF
CN-370000-CN330-T1.pdf PDF
CN-370000-CN330-T12.pdf PDF
CN-370000-CN330-T16CO1.pdf PDF
CN-370000-CN330-T19CO1.pdf PDF
CN-370000-CN330-T2.pdf PDF
CN-370000-CN330-T21CO1.pdf PDF
CN-370000-CN330-T23.pdf PDF
CN-370000-CN330-T25CO1.pdf PDF
CN-370000-CN330-T26.pdf PDF
CN-370000-CN330-T8CO4.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bryan Bradner D igitally signed by Bryan Bradner ate: 2024.01.05 14:15:35 -05'00'

CC

U

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

D ecem ber 13, 2023 132000-R

Florida D epartm ent of Environm ental Protection

B ureau of D esign and C onstruction

Attn:M r.G arland Sandel 3800 C om m onw ealth Blvd. M

S 520 Tallahassee, Florida 32399

Sent via em ail: G arland.Sandel@ FloridaD

EP.gov

R E:

C ontract C

N 330, Task A ssignm ent 20, C hange O rder 2, P roject 61472C

Fishing Pier Replacem ents and Bulkhead Im provem ents Project at Bill Baggs Cape

Florida State Park, Key Biscayne, Florida

D ear M r.Sandal:

C um m ins C ederberg, Inc. (C um m ins C ederberg) is pleased to present this proposal for our m arine engineering and environm ental consulting services for the proposed fishing pier replacem ents and bulkhead im provem ents at Bill Baggs C ape Florida State Park, located at 1200 C randon Blvd. Key Biscayne, M iam i-D ade C ounty, Florida (Project).The proposed im provem ents include replacem ent of 8 fishing pier structures and portions of the bulkhead along the w est shoreline of the Project site.The new fishing pier structure is proposed to be w ithin the sam e overw ater footprint as the existing fishing piers. O ne of the bulkhead footprints proposed for replacem ent is the concrete pile panel w all construction from Station 11+26 to 12+60, w hich is currently closed from public access in sections, and w as earm arked as a priority replacem ent per our M arine Inspection R eport dated M ay 2023.Additional length of the existing bulkhead along the w estern shoreline can be replaced as construction budget for this phase of w ork allow s.

R eferenced stationing is as established in our M ay 2023 M arine Inspection R eport.

For your review , C um m ins C ederberg, Inc. (C um m ins C ederberg) has provided the attached proposal sum m ary and m an-hour docum entation for the service tasks identified below

Subtask 4

G eotechnical Borings

Subtask 5 – D em olition Level/N

ESH

AP Asbestos Survey and Lim ited Leaded Paint Screening Subtask 6 –

D epartm ent of H istorical R esources Package Subtask 7 –

Engineering – C onceptual D esign o Subtask 7A –

C onceptual D raw ings o Subtask 7B

C onceptual O pinion of Probable C ost o

Subtask 7C

C onceptual Evaluation

FD

EP B

ill B aggs Cape Florida State Park

0-R

D ecem ber 1

, 2

Page 2 2 of 11

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

Subtask 8

Engineering

60% D ocum ents

Subtask 9

Environm ental Perm itting – Applications o Subtask 9A

D

ER

M

C lass IApplication o Subtask 9B

D

ER

M

C lass I Prelim inary Approval o

Subtask 9C

D

ER

M C lass I Perm it o Subtask 9D

SW

ER

P Application o Subtask 9E

SW

ER

P Processing o Subtask 9F

U

SAC

E Application o Subtask 9G

U

SAC

E Processing

Subtask 10

Engineering

100% D ocum ents o Subtask 10A

100%

D esign o Subtask 10B

100%

C onstruction D raw ings

W e appreciate the opportunity to prepare a proposal for engineering and environm ental consulting services and look forw ard to w orking together. Please review the attached Proposal Sum m ary and deliverables; w e w ill com m ence w ork upon receipt of Authorization to Proceed.

Sincerely, C

U M

M

IN

S C

ED

ER

B

ER

G

, IN

C

Anne Shoffner (Laird) Sr. Project M anager/M arine Scientist

0-R

D ecem ber 1

, 2

Page 3 3

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

B ill B aggs C ape Florida B ulkhead and Shoreline Im provem ents 1200 C randon Blvd., Key Biscayne, FL 33419 C ontract: C N

Task: 20 C

O

Subtask 4 – G eotechnical B orings

D escription:

C um m ins C ederberg’s subconsultant w ill conduct ten

(10) Standard

Penetration Tests (SPT) to a depth of approxim ately 40 feet below the ground surface adjacent to and landw ard of the existing 8 fishing piers and for bulkhead replacem ent and im provem ents along the w estern shoreline. Sunshine O ne C all w ill be contacted for advice regarding the location of underground utilities.In addition, any available inform ation regarding the location of underground utilities m ust be provided. C um m ins C ederberg and its subconsultants cannot be held responsible for dam age to below ground structures or utilities w hich are not identified to us. W e specifically request any available inform ation about the location of underground utilities for this Project. Based on the collected field data, an engineering analysis w ill be conducted, and a report prepared w ith evaluations and discussions of the geotechnical aspects of the proposed Project. The report w ill include:D raw ings show ing boring locations, a graphic sum m ary of the generalized subsurface conditions, and boring logs w ith detailed descriptions of the m aterials encountered;

A discussion of generalized subsurface conditions at the site;

Soil param eters such as saturated unit w eights, passive/active coefficients, internal friction angles, w all friction angles; and

D riving criteria for concrete piles, including vertical resistance.

D eliverable:

G eotechnical

Investigations R eport, Signed/Sealed by a

Florida R egistered Professional Engineer (PD

F form at).

Perform ance M easure:

D eliverable w ill be review ed by the D epartm ent to confirm they are com plete, accurate, and tim ely.

Fixed Price C ost:

Subtask 4

G eotechnical Borings

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Senior Project M anager

$ 144.24

1,153.92

C um m ins C ederberg Senior Engineer

$ 135.00

1,080.00

C um m ins C ederberg Associate Engineer II

$ 98.07

$ 294.21 C um m ins C ederberg

Secretary $ 60.00

$ 240.00

N V5, Inc.

D riller

100.45

8,036.00 N

V5, Inc.

C lerical/Adm inistrative

Assistant

80.23

80.23

0-R

D ecem ber 1

, 2

Page 4 4

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

N V5, Inc.

Staff Engineer

128.94

5,157.60

N V5, Inc.

Professional Engineer

200.57

4,813.68

Sub-Total $20,855.64

R eim bursable C ost:

Postage Printing O vernight Travel (if applicable)

M ileage

$0.445 per m ile)

R eim bursable Total C ost

Total for Subtask 4:$20,855.64

Subtask 5

D em olition Level/N

ESH

A P A sbestos Survey and Lim ited Leaded Paint

Screening D escription:

C um m ins C ederberg’s subconsultant w ill perform a dem olition level asbestos survey at the project site.All w ork w ill be perform ed by AH

ER

A Accredited Asbestos Building

Inspectors, w orking under the direction of a Florida Licensed

Asbestos C onsultant.

Suspect m aterials w ill be sam pled in accordance w ith applicable regulations, tw o to three sam ples of each identified non-friable suspect m aterial and three sam ples of each friable suspect m aterial w ill be collected.Surfacing m aterials and/or therm al system s insulation, if present, w ill be sam pled in generalaccordance w ith the AH

ER

A protocol.C ollected sam ples w ill be forw arded to a N

VLAP

accredited laboratory for analysis by Polarized LightM icroscopy (PLM

), coupled w ith dispersion staining.

C um m ins C ederberg’s subconsultantw ill perform a lim ited screening of painted surfaces for lead-based paint, on the designated fishing piers and bulkhead along the w estern shoreline of the project site. An EPA certified Lead-Paint Inspector perform a survey of painted surfaces throughout the surveyed areas, using an X-R ay Fluorescence (XR

F) hand-held lead paint analyzer.At least one m easurem ent of each suspected hom ogeneous surface w ill be sam pled.

D eliverable:

A report outlining findings of the Asbestos Survey and Lim ited Leaded Paint Screening and appropriate recom m endations

(PD

F form at).

Perform ance M easure:

D eliverable w ill be review ed by the D epartm ent to confirm they are com plete, accurate, and tim ely.

Fixed Price C ost:

Subtask 5

D em olition Level/N

ESH

AP Asbestos Survey and Lim ited Leaded Paint Screening

0-R

D ecem ber 1

, 2

Page 5 5

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Senior Project M anager

$ 144.24

432.72

C um m ins C ederberg Secretary

$ 60.00

60.00

N V5, Inc.

Staff Engineer $ 128.94

8.75

1,128.23 N

V5, Inc.

Senior Project M anager/Q A M anager $ 229.22

1.5 $ 343.83

N V5, Inc.

Secretary/C lerical

80.23

3.5

280.81

N V5, Inc.

Florida Licensed Asbestos C onsultant

229.22

229.22

N V5, Inc.

C ertified Industrial

H ygienist

$ 243.55 1.5

$ 365.33

N V5, Inc.

Asbestos Testing via PLM

(65 sam ples @

$15/sam ple)

$ 15.00

$ 975.00

Sub-Total $3,815.14

R eim bursable C ost:

Postage Printing O vernight Travel (if applicable)

M m ile)

R eim bursable Total C ost

Total for Subtask 5:$3,815.14

Subtask 6

D epartm ent of H istorical R esources Package D escription:C um m ins C ederberg w ill prepare a package as requested by the client for subm ittal to the D epartm ent of H istorical R esources.It is our understanding thatthe package w illinclude a letter describing the proposed scope of w ork as a replacem ent in-kind forthe existing fishing piers as w ell as bulkhead im provem ents along the shoreline. If sketches are required, it is assum ed the draw ings developed in Subtask 8 w ill be sufficient. The client w ill provide any of the necessary form s to be filled out and included w ithin the subm ittal package.

D eliverable:

D epartm ent of H istorical R esources Package w ill be inclusive of necessary form s

(provided by the client),a letter describing the scope of w ork, and if required the draw ings developed in Subtask 8 (PD

F form at).

Perform ance M easure:

D eliverable w ill be review ed by the D epartm ent to confirm they are com plete, accurate, and tim ely.

0-R

D ecem ber 1

, 2

Page 6 6

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

Fixed Price C ost:

Subtask 6

D epartm ent of H istorical R esources Package

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Senior Project M anager

$ 144.24

288.48

C um m ins C ederberg Senior Engineer

$ 135.00

135.00

C um m ins C ederberg Associate Engineer II

$ 98.07

392.28

C um m ins C ederberg Senior D esigner

103.86

415.44

C um m ins C ederberg Secretary

$ 60.00

$ 60.00 Sub-Total

1,291.20

R eim bursable C ost:

Postage Printing O vernight Travel (if applicable)

M m ile)

R eim bursable Total C ost

Total for Subtask 6: $1,291.20

Subtask 7

Engineering – C onceptual D esign

D escription:

Subtask 7A C onceptual D raw ings: C um m ins C ederberg w ill prepare conceptual draw ings in C

AD

-form at.

The draw ings are expected to include a m inim um of 3 different design concepts generally described as: a bulkhead section for replacem entw ithin 18” of the existing bulkhead; a riprap shoreline section for locations w ith overturned gravity concrete w alls; and a section show ing a hybrid option of possible additional riprap or dem olished concrete w all acting as riprap for shoreline erosion protection and an upland w all for flood w ater protection. The concepts w ill also include suggested top of cap or top of riprap elevations w ith consideration to current and future projected w ater levels.The follow ing draw ing sheets are anticipated:

C over Sheet –

Location m ap, title

Site Plan – Existing conditions, survey

C oncept D esign – C ross sections for each concept

Subtask 7B C onceptual O pinion of Probable C ost: C um m ins C ederberg w ill prepare an

O pinion of Probable C ost(O

PC

)for each of the conceptual designs developed in Subtask 7A at an order-of-m agnitude level. The costs w ill be presented as a probable range to account for conceptual level of detail.The O

PC

w ill be based on C um m ins C ederberg’s best judgm ent as an experienced and qualified professional fam iliar w ith the industry.

The O

PC

w ill provide an opportunity for cost com parison betw een the available shoreline protection and flood protection options for the w estern shoreline of the Park.

0-R

D ecem ber 1

, 2

Page 7 7

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

Subtask 7C C onceptualEvaluation:C um m ins C ederberg w ill prepare a list of pros and cons for the conceptual designs developed in Subtask 7A. Each concept w ill have at m inim um 3 pros and 3 cons provided.

The list is expected to cover item s relating to constructability, design m aterials, environm ental obstacles, perm itting feasibility, upfront cost and associated m aintenance costs,service life, sea level rise resilience, and additional item s as applicable.

D eliverable:

Subtask 7A C onceptualdraw ings in C

AD

form at for m inim um of three (3) different design sections (C oncept D raw ings in PD

F form at).

Subtask 7B O pinion of Probable C ost foreach concept developed in Subtask 7A

(O

PC

Tables in PD

F form at).

Subtask 7C Pros and C ons list for each concept developed in Subtask 7A. A m inim um of

3 pros and 3 cons w ill be provided for each concept (Brief m em o in PD

F Form at).

Perform ance M easure:

D eliverable w ill be review ed by the D epartm ent to confirm they are com plete, accurate, and tim ely.

Fixed Price C ost:

Subtask 7A

C onceptual D raw ings

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Senior Project M anager

$ 144.24

288.48

C um m ins C ederberg Senior Scientist

$ 135.00

$ 270.00 C um m ins C ederberg

Project Scientist $ 90.00

$ 360.00

C um m ins C ederberg Senior Engineer

$ 135.00

540.00

C um m ins C ederberg Associate Engineer II

$ 98.07

2,353.68

C um m ins C ederberg Senior D esigner

103.86

2,492.64

C um m ins C ederberg Secretary

$ 60.00

$ 60.00 Sub-Total

6,364.80

Subtask 7B

C onceptual O pinion of Probable C ost

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Senior Project M anager

$ 144.24

288.48

C um m ins C ederberg Senior Engineer

$ 135.00

540.00

C um m ins C ederberg Associate Engineer II

$ 98.07

1,176.84

C um m ins C ederberg Secretary

$ 60.00

$ 60.00 Sub-Total

2,065.32

Subtask 7C onceptualEvaluation

0-R

D ecem ber 1

, 2

Page 8 8

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Senior Project M anager

$ 144.24

288.48

C um m ins C ederberg Senior Scientist

$ 135.00

$ 270.00 C um m ins C ederberg

Senior Engineer $ 135.00

270.00 C

um m ins C ederberg

Associate Engineer II $ 98.07

784.56 C

um m ins C ederberg

Secretary $ 60.00

60.00 Sub-Total

1,673.04

R eim bursable C ost:

Postage Printing O vernight Travel (if applicable)

M m ile)

R eim bursable Total C ost

Total for Subtask 7: $10,103.16

Subtask 8

Engineering – 60%

D ocum ents D escription:

C um m ins C ederberg w ill prepare prelim inary plans, at approxim ately

60% com pletion-level, inclusive of specifications, in sufficient detail for subm ittal to the state and federal regulatory agencies for the follow ing w ork.

R eplacem ent of 8 fishing piers along the w est shoreline R eplacem ent of bulkhead sections along the w estern shoreline. Proposed to include bulkhead replacem ent from

Station 11+26 to 12+60 as established in our M arine Inspection R eport dated M ay 2023 and can include additional length of w all along the w estern shoreline as the construction budget allow s.

The lim ited boundary, topographic, and hydrographic survey data from Subtask 1 w ill be used to prepare the plans in C

AD

form at using industry standards for this type of construction. Typical sections w ill be developed for the structural com ponents, illustrating the design layout and m aterials. The geotechnical data from

Subtask 4 w ill be included in the plan set. Specifications and details for m aterials w ill be developed for various com ponents, as part of the design process.

D eliverable:

60% construction docum ents (11”x17”) and 60% construction cost estim ate (PD

F form at).

Perform ance M easure:

D eliverable w ill be review ed by the D epartm ent to confirm they are com plete, accurate, and tim ely.

Fixed Price C ost:

0-R

D ecem ber 1

, 2

Page 9 9

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

Subtask 8

Engineering – 60%

D ocum ents

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Senior Project M anager

$ 144.24

2,884.80

C um m ins C ederberg Senior Scientist

$ 135.00

$ 1,080.00 C um m ins C ederberg

Senior Engineer $ 135.00

7,425.00 C um m ins C ederberg

Associate Engineer II $ 98.07

8,237.88 C um m ins C ederberg

Senior D esigner

103.86

$ 8,828.10

C um m ins C ederberg Secretary

$ 60.00

$ 240.00 Sub-Total

$28,695.78

R eim bursable C ost:

Postage Printing O vernight Travel (if applicable)

M m ile)

R eim bursable Total C ost

Total for Subtask 8:$28,695.78

Subtask 9

Environm ental Perm itting – A pplications

Perm it Processing

D escription:

Subtask 9A D

ER

M

C lass IPerm itA pplication:C um m ins C ederberg w ill prepare a M iam i-D ade

C ounty D ivision of Environm ental R esource M anagem ent (D

ER

M ) Short Form

C lass I C oastal C onstruction Perm it Application, requesting authorization of the proposed in-kind replacem ent of the fishing piers and proposed replacem ent of bulkhead sections w ithin 18” w aterw ard of its current footprint, pursuant to C hapter 24 of the M iam i-D ade C ounty C ode.The C lient w ill provide C um m ins C ederberg w ith an application form signed by the property ow nerand subm erged lands ow ner (as applicable), contractor inform ation, m itigation contributions (if required), and application fees.

Subtask 9B D

ER

M Class I Prelim inary A pproval:

The M iam i-D ade C ounty D ivision of

Environm ental R esource M anagem ent (D

ER

M ) Short Form

C lass I C oastal C onstruction Perm it Application w ill be processed tow ards securing prelim inary approval for Project construction.

C um m ins C ederberg w ill m aintain contact w ith D

ER

M and provide additional Project details as needed to aid theirreview of the perm it application.

D uring the m arine resources survey conducted June 2023, several corals w ere docum ented on the pier pilings, including ESA listed O rbicella faveolata, and on the riprap fronting the existing bulkhead. D

ER

M m ay require coral relocation. A coral relocation and m onitoring plan can be

0-R

D ecem ber 1

, 2

Page 1 1

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee provided under a separate scope of services if required once the scope is confirm ed w ith D

ER

M during prelim inary approval process.

Subtask 9C D

ER

M

Class I Perm it:C um m ins C ederberg w illsubm it 100% construction draw ings, once com pleted under Subtask 7, to D

ER

M after prelim inary approval is granted in efforts tow ards securing the C lass I

C oastal

C onstruction

Perm it authorization of the proposed in-kind replacem ent of the 8 fishing piers and proposed replacem ent of bulkhead sections w ithin 18” w aterw ard of its current footprint.C um m ins C ederberg w ill m aintain contact w ith D

ER

M to review plans and provide additional inform ation. The C lient w ill provide C um m ins C ederberg w ith perm it fees (to be determ ined based on estim ated construction cost).

If required by D

ER

M , any required coral relocation and m onitoring plans can be provided under a separate scope of services.

Subtask 9D

SW

ER

P Exem ption A pplication:

C um m ins C ederberg w ill prepare a Statew ide Environm ental R esource Perm it (SW

ER

P) Exem ption Application w ith the South Florida W ater

M anagem ent D istrict (SFW

M D

), requesting an Exem ption Verification for the proposed in-kind replacem ent of the 8 fishing piers and proposed replacem ent of bulkhead sections w ithin 18” w aterw ard of its current footprint, pursuant to C hapter 62-330.051(5)(d) and (12)(b), F.A.C

Subtask 9E SW

ER

P Exem ption Processing:

C um m ins C ederberg w ill process the SW

ER

P

Perm it Exem ption Application w ith SFW

M D

. C um m ins C ederberg w ill m aintain contact w ith the

SFW

M

D to review plans and provide additional inform ation. C um m ins C ederberg w ill confer w ith regulatory agency staff to advise them of the details of the Project and to address staff com m ents.

The C lient w ill provide the perm it application processing fee (estim ated at $100.00).

Subtask 9F U

SA

C

E A pplication:C um m ins C ederberg w ill prepare a D epartm ent of the Arm y

Application through the U .S. Arm y C orps of Engineers

(U

SAC

E) requesting authorization for the proposed in-kind replacem ent of the 8 fishing piers and proposed replacem ent of bulkhead sections w ithin 18” w aterw ard of its current footprint, pursuant to Section 10 of the R ivers and

H arbors Act and Section 404 of the C lean W ater Act. The C lient w ill provide

C um m ins

C ederberg w ith a signed application form

Subtask 9G U

SA

C

E Processing: The U

SAC

E perm it application w ill be processed tow ards securing the required authorizations for Project construction.C um m ins C ederberg w ill m aintain contact w ith the U

SAC

E to review plans and provide additional inform ation (e.g., JaxBO or

Section 7 C hecklists).

Because the proposed Project proposes a “take” of ESA listed O . faveolate, the Project w ill require form al consultation w ith the N ational M arine Fisheries Service (N

M FS) w hich typically takes 1 year or m ore to com plete in addition to the U

SAC

E review period. U

SAC

E m ay require coral relocation. A coral relocation and m onitoring plan can be provided under a separate scope of services if required once com m ents are provided by the U

SAC

E and N M

FS.

0-R

D ecem ber 1

, 2

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

D eliverables:

Subtask 9A D

ER

M

C lass IApplication in PD

F Subtask 9B

D

ER

M C lass I Prelim inary Approval in PD

F Subtask 9C

D

ER

M C lass I Perm it in PD

F Subtask 9D

SW

ER

P Exem ption Application in PD

F Subtask 9E

SFW

M

D Exem ption Letter in PD F

Subtask 9F U

SAC

E

Application in PD

F Subtask 9G

U

SAC

E Authorization in PD

F

Perform ance M easure: D eliverables w ill be review ed by the D epartm ent to confirm they are com plete, accurate, and tim ely.

Fixed Price C ost:

Subtask 9A

D

ER

M C lass I Perm it Application

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Project D irector

$ 187.50

$ 187.50 C um m ins C ederberg

Senior Project M anager

$ 144.24

$ 432.72 C um m ins C ederberg

Project Scientist

90.00

900.00

C um m ins C ederberg Secretary

60.00

60.00 Sub-Total

1,580.22

Subtask 9B

D

ER

M C lass I Prelim inary Approval

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Project D irector

$ 187.50

$ 187.50 C um m ins C ederberg

Senior Project M anager

$ 144.24

721.20

C um m ins C ederberg Project Scientist

$ 90.00

$ 1,620.00 C um m ins C ederberg

Secretary

60.00

$ 120.00 Sub-Total

2,648.70

Subtask 9C

D

ER

M C lass I Perm it

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Project D irector

$ 187.50

187.50

C um m ins C ederberg Senior Project M anager $ 144.24

432.72 C

um m ins C ederberg

Project Scientist $ 90.00

900.00 C

um m ins C ederberg

Secretary

60.00

60.00

Sub-Total

1,580.22

Subtask 9D

SW

ER

P Exem ption Application

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost

0-R

D ecem ber 1

, 2

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

C um m ins C ederberg Project D irector $ 187.50

$ 187.50

C um m ins C ederberg Senior Project M anager $ 144.24

$ 576.96

C um m ins C ederberg Project Scientist

$ 90.00

$ 1,260.00 C um m ins C ederberg

Secretary

60.00

$ 60.00 Sub-Total

$ 2,084.46

Subtask 9E

SW

ER

P Exem ption Processing

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Project D irector

$ 187.50

$ 187.50 C um m ins C ederberg

Senior Project M anager

$ 144.24

$ 576.96 C um m ins C ederberg

Project Scientist $ 90.00

$ 1,260.00

C um m ins C ederberg Secretary

60.00

$ 60.00

Sub-Total $ 2,084.46

Subtask 9F

U

SAC

E Application

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Project D irector

$ 187.50

$ 562.50 C um m ins C ederberg

Senior Project M anager

$ 144.24

$ 865.44 C um m ins C ederberg

Project Scientist $ 90.00

$ 1,980.00

C um m ins C ederberg Secretary

60.00

$ 60.00

Sub-Total

3,467.94

Subtask 9G

U

SAC

E Processing

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Project D irector

$ 187.50

$ 562.50 C um m ins C ederberg

Senior Project M anager

$ 144.24

$ 865.44 C um m ins C ederberg

Project Scientist $ 90.00

$ 1,980.00

C um m ins C ederberg Secretary

60.00

$ 60.00

Sub-Total $ 3,467.94

R eim bursable C ost:

Postage Printing O vernight Travel (if applicable)

M ileage (@

$0.445 per m ile)

R eim bursable Total C ost

$100.00

SW

ER

P Perm it Exem ption Application Processing

Fee

0-R

D ecem ber 1

, 2

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

Total for Subtask 9:$16,913.94

Subtask 10

Engineering – 100%

D ocum ents D escription:

Subtask 10A

100% D esign:C um m ins C ederberg w ill finalize the design of the Project, including any revisions resulting from the environm ental perm itting process under Subtask 6. Typical sections w ill be developed illustrating the design layout, elevations and proposed structural connections. Specifications and details for m aterial characteristics w ill be developed for various com ponents as part of the design process, as applicable. Structural calculations w ill be prepared, w hich w ill be signed and sealed by a Professional Engineer.

Subtask 10B

100%

Draw ings:

C um m ins

C ederberg w ill finalize draw ings, inclusive of specifications, in sufficient detail for construction.

Any revisions stem m ing from the environm ental perm itting process under Subtask 6 w ill be included. The draw ings w ill be signed and sealed by a Florida registered Professional

Engineer.

An updated C onstruction C ost Estim ate w ill be provided based on the 100% draw ings. The follow ing draw ing sheets are anticipated:

C over Sheet – Location m aps, titles G eneral N otes –

Specifications, m aterials, list of abbreviations

Site Plan – Existing conditions, survey

Proposed Plan – Fishing piers and partial bulkhead Structural Sections –

C ross sections of fishing piers and bulkhead, structural details

D eliverables:

Subtask 10A : Four (4) sets of signed/sealed structural calculations, as applicable (PD

F form at).

Subtask 10B

: Four (4) sets of signed/sealed 100% construction plans (11”x17”) (PD

F and D

W G form

at) and updated construction cost estim ate (PD F form at).

Perform ance M easure: D eliverables w ill be review ed by the D epartm ent to confirm they are com plete, accurate, and tim ely.

Fixed Price C ost:

Subtask 10A

Engineering – 100%

D esign

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Senior Project M anager

$ 144.24

1,442.40

C um m ins C ederberg SeniorEngineer

$ 135.00

2,700.00

C um m ins C ederberg Associate Engineer II

98.07

4,020.87 C um m ins C ederberg

Secretary $ 60.00

$ 120.00

Sub-Total $8,283.27

Subtask 10B

Engineering – 100%

D raw ings

0-R

D ecem ber 1

, 2

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

Firm N am e

Position C lassification

H ourly R ate H ours Total Fixed Price C ost C um m ins C ederberg

Senior Project M anager

$ 144.24

1,442.40

C um m ins C ederberg Senior Scientist

$ 135.00

$ 540.00 C um m ins C ederberg

Senior Engineer $ 135.00

$ 2,160.00

C um m ins C ederberg Associate Engineer II

$ 98.07

$ 1,961.40 C um m ins C ederberg

Senior D esigner

$ 103.86

$ 4,673.70 C um m ins C ederberg

Secretary $ 60.00

$ 180.00

Sub-Total $10,957.50

R eim bursable C ost:

Postage Printing O vernight Travel (if applicable) M ileage (@ $0.445 per m ile)

R eim bursable Total C ost

Total for Subtask 10: $19,240.77

Project Schedule Activity

D uration (C alendar D ays)

Subtask 4

G eotechnical Borings days from contract execution Subtask 5 –

D em olition Level/N

ESH

AP

Asbestos Survey and Lim ited Leaded Paint Screening

60 days from contract execution

Subtask 6 – D epartm ent of H istorical R esources Package 30 days from contract execution,if no sketches are required. If sketches are required, then 30 days from com pletion of Subtask 7.

Subtask 7A

C onceptual D raw ings 45 days from contract execution Subtask 7B –

C onceptual O pinion of Probable C ost 45 days from contract execution

Subtask 7C

C onceptual Evaluation

45 days from contract execution

Subtask 8

Engineering

60% D ocum ents

60 days from com pletion of Subtask 4 and Subtask

Subtask 9A

D

ER

M

C lass I Application days from the com pletion of Subtask 8

Subtask 9B

D

ER

M C lass I Prelim inary

Perm it

120 days from the com pletion of Subtask 8

Subtask 9C

D

ER

M C lass I Perm it

150 days from the com pletion of Subtask 8 Subtask 9D

FD

EP SW

ER

P Application days from the com pletion of Subtask 8

Subtask 9E

FD

EP SW

ER

P

Processing 120 days from the com pletion of Subtask 8

0-R

D ecem ber 1

, 2

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

Subtask 9F

U

SAC

E Application days from the com pletion of Subtask 8 Subtask 9G

U

SAC

E Processing

180 days from the com pletion of Subtask 8 Subtask 10A

100%

D esign

60 days from the com pletion of Subtask 9 Subtask 10B

100%

D raw ings 60 days from the com pletion of Subtask 9

Sum m ary of FeesSubtask Subtask Fixed Price C ost Subtask

R eim bursable Subtask 4

G eotechnical Borings $20,855.64

Subtask 5 – D em olition Level/N

ESH

AP

Asbestos Survey and Lim ited Leaded

Paint Screening $3,815.14

Subtask 6 – D epartm ent of H istorical R esources Package $1,291.20

Subtask 7A – C onceptualD raw ings

$10,103.16 Subtask 7B –

C onceptual O pinion of Probable C ost Subtask 7C

C onceptual Evaluation Subtask 8

Engineering –

60% ocum ents $28,695.78

Subtask 9A

D

ER

M C lass I Application

$16,913.94

Subtask 9B

D

ER

M C lass I Prelim inary

Perm it

Subtask 9C

D

ER

M C lass I Perm it

Subtask 9D

FD

EP SW

ER

P Application

Subtask 9E

FD

EP SW

ER

P Processing

$100.00 Subtask 9F

U

SAC

E Application

Subtask 9G

U

SAC

E Processing Subtask 10A

100%

D esign

$19,240.77 Subtask 10B

100%

D raw ings Total Fixed Price C ost:

100,915.63 Total R eim bursable C ost:

$ 100.00

O verall Total C ost:

101,015.63

C onditions/A ssum ptions

C lient shall notify C um m ins C ederberg of any know n conditions related to the Project that m ay affect the above-described scope of services.

C lient shall provide safe access to the Project site as needed by C um m ins C ederberg to com plete the above-described scope of services.

C lient or contractor to secure M iam i-D ade C ounty Building D epartm ent Perm

it. C um m ins ederberg can provide under a separate scope of services.

0-R

D ecem ber 1

, 2

M M

IN

S CED

ER

B

ER

G

, IN

C. | M iam i | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Tallahassee

C um m ins

C ederberg shall not be held responsible, if applicable, for contractor perform ance issues, construction installation tolerances, and/or construction m aterial m anagem ent.

C um m ins C ederberg does not guarantee, w arranty, ensure or otherw ise assert that the project w ill receive the necessary regulatory authorizations.

C lient w ill provide any available background inform ation, such as as-built draw ings, historical photographs, or other available docum entation.

There w ill be no legal encum brance issues, substantial objections from neighbors, no subm erged land lease issues, and no historic or archaeological resource issues.

The project schedule m ay be revised as additional project-specific inform ation becom es available during the environm ental perm itting process.

C oral relocation plan and m onitoring are not included herein. C um m ins C ederberg can be provided under separate scope of services.

Anticipated perm it application fees noted above are treated as reim bursable expense.

Legal not included.

C onstruction draw ings to be inclusive of specifications. If a separate specification package is required, C um m ins C ederberg can provide under an addendum scope of services.

C onstruction support services are not included. C um m ins C ederberg can provide under a separate scope of services.