About this file
This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) for the Indian Key Historic State Park Dock and Pavilion Replacement project in Islamorada, Florida. The contracting parties include FDEP as the owner and Cummins Cederberg, Inc., a coastal and marine engineering firm, as the consultant. The task assignment is identified as CN330 TA 26, with project number 6I506C. Ralph Perkins serves as the FDEP Contract Manager, while Jason Cummins, P.E., represents Cummins Cederberg. The assignment was executed on April 20, 2023, with approval signatures from FDEP budget, project management, contract management, and contract authority representatives.
The scope of work involves modifying the Coral Relocation Plan in coordination with park staff based on a revised piling replacement plan. Specifically, Cummins Cederberg will develop a revised coral relocation and monitoring plan for dock rehabilitation involving the replacement of twenty-two of twenty-nine dock piles. The consultant will utilize existing field survey data from April and September 2021, coordinate with the Florida Keys National Marine Sanctuary, and follow 2022 Resource Assessment Survey Protocols to identify the quantity and surface area of coral colonies impacted by the project. The fixed price cost for this task is $4,047.96 with no cost reimbursement authorized. The work schedule requires completion within 60 calendar days from execution, with deliverables consisting of a revised Coral Relocation and Monitoring Plan in PDF format. Labor costs include 20 hours from a Senior Project Manager at $144.24 per hour, 6 hours from a Project Scientist at $90.00 per hour, and 6 hours from a Senior Designer at $103.86 per hour. Payment is contingent upon FDEP approval of deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN330 TA 26 FDEP 6I506C
Indian Key State Park Dock and Pavilion Replacement
Cummins Cederberg, Inc.
Jason Cummins, P.E. (305) 741-6155 jcumminscederberg.com
Ralph Perkins (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
Modify the Coral Relocation Plan in coordination with Park staff as per the revised piling replacement plan and the attached proposal dated 1-26-2023.
James Post
Upon Execution $ 4,047.96 60 days from execution $ 0.00
$ 4,047.96
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.03.27 10:01:45 -04'00'
James Post James Post Digitally signed by James Post Date: 2023.04.06 13:15:27 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.04.13 10:25:45 -04'00'
Jason Cummins, P.E.
Digitally signed by Jason R Cummins Date: 2023-04-13 16:49:14
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.04.20 16:23:50 -04'00'
6I506C FD073 37505000097 080039/23 423001 U3200 131500 QK $ 4,047.96
$ 4,047.96
CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | St. Petersburg | Tallahassee
89362
January 26, 2023
Attn: Mr. Jim Post Bureau of Design and Construction Florida Department of Environmental Protection 3 LaCroix Court Key Largo, Florida 33037
Via Email: james.post@dep.state.fl.us
RE: Proposal for the Indian Key Dock Rehabilitation Coral Relocation and Monitoring
Plan
Dear Mr. Post:
Cummins Cederberg, Inc (Cummins Cederberg) is pleased to present this proposal for our environmental consulting services for the proposed Indian Key dock rehabilitation project located east and waterward of U.S Highway 1, Islamorada FL. The proposed project will include development of a revised Coral Relocation and Monitoring Plan.
For your review, Cummins Cederberg has provided a proposal summary and man-hour documentation for the services tasks identified below:
Subtask 1 – Coral Relocation and Monitoring Plan
We appreciate the opportunity to prepare a proposal for engineering and environmental consulting services and look forward to working together. Please review the attached Proposal Summary and deliverables; we will commence work upon receipt of Authorization to Proceed.
Sincerely, CUMMINS CEDERBERG, INC.
Anne Shoffner (Laird) Sr. Project Manager/Marine Scientist
Matson_D Text Box
CN330 TA26
Indian Key Coral Relocation and Monitoring Plan 89362
January 26, 2023 Page 2 of 3
CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | St. Petersburg | Tallahassee
Indian Key Historic State Park
Dock Rehabilitation Project
Islamorada
Contract: CN330 TA: 26
SubTask 1 – Coral Relocation and Monitoring Plan Description:
SubTask 1 - Coral Relocation and Monitoring Plan: A Cummins Cederberg marine biologist with experience in developing and implementing coral relocation, mitigation and monitoring plans will develop a new coral relocation and monitoring plan for the Indian Key
Dock rehabilitation program. Based on a November 2022 conditions assessment of the Indian
Key dock piles, in-water work consists of the replacement of twenty-two (22) of the twenty-nine (29) dock piles. The remaining seven (7) piles are in good condition and do not need to be repaired or replaced.
In March 2022, a coral relocation and mitigation plan was developed as part of the process to rehabilitate the docks. However, the plan assumed all the piles would be replaced and all viable corals and octocorals colonizing the piles and hard substrate within an approximate 3
ft. buffer surrounding the piles would need to be relocated. The total surface area of impacted coral colonies was also quantified based on this same assumption.
To estimate the number of coral colonies to be relocated, Cummins Cederberg will use the existing field survey data from April and September 2021, assuming the number and sizes of the hard coral and octocoral colonies has not significantly changed. Cummins Cederberg will coordinate with the Florida Keys National Marine Sanctuary (FKNMS) and follow the new
2022 Resource Assessment Survey Protocols for Nearshore Construction Projects to ensure the revised plan follows the most current guidelines. Recommendations within the plan will similarly follow those specified by the Florida Fish and Wildlife Conservation Commission
(FWC) with regards to the species and size ranges prioritized for relocation within the State of Florida. With the new information from the conditions assessment report, a revised coral relocation and monitoring plan will be developed that will identify the quantity and surface area of coral colonies impacted by the replacement of twenty-two (22) dock piles and the replacement of the over-water decking.
Deliverables:
Task 1: Revised Coral Relocation and Monitoring Plan (pdf, electronic delivery)
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Indian Key Coral Relocation and Monitoring Plan 89362
January 26, 2023 Page 3 of 3
CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | St. Petersburg | Tallahassee
Fixed Price Cost:
Subtask 1A: Coral Relocation and Monitoring Plan
Firm Name Position Classification Hourly
Rate
Hours Total Fixed
Price Cost
Cummins Cederberg Sr. Project Manager $144.24 20 $ 2,884.80
Cummins Cederberg Project Scientist $ 90.00 6 $ 540.00
Cummins Cederberg Sr. Designer $103.86 6 $ 623.16
Sub-Total $ 4,047.96
Reimbursable Cost:
Postage (est.)
Printing
Overnight Travel
(if applicable)
Mileage (@
$0.445 per mile)
Reimbursable
Total Cost
Total for Subtask 1: $4,047.96
Project Schedule
Activity Duration (Calendar Days)
1: Coral Relocation and Monitoring Plan 60 days from authorization
Summary of Fees
SubTask Subtask Fixed Price Cost
1. Coral Relocation and Monitoring Plan $ 4,047.96
Total Fixed Price Cost: $ 4,047.96
Total Reimbursable Cost: $ 0
Overall Total Cost: $ 4,047.96
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
CONDITIONS/ASSUMPTIONS
Client shall notify Cummins Cederberg of any known conditions related to the Project that may affect the above-described scope of services.