CN-370000-CN330-T8CO3.pdf
PDF 419 KB Posted
- Contract number
- CN330
- Issued by
- Florida
About this file
Summary
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a contract with Cummins Cederberg, Inc., a coastal and marine engineering firm. The change order pertains to Task Assignment No. TAOS 03 under FDEP Contract No. CN330 for the Quayside Shoreline Dock Stabilization project located at Quayside Island in Biscayne Bay, Miami. The contract manager is Ralph M. Perkins, and the consultant representative is Penny Cutt. The change order was approved on November 17, 2023, by authorized FDEP representatives including Budget Representative Lisa Yarborough, Project Manager Jim McGuire, Contract Manager Ralph M. Perkins, and Contract Authority Michael W. Foster Jr., P.E.
The change order is a no-cost time extension only, providing additional time and administration needed to complete drawings and permits. The original task execution date was April 13, 2022, with an original end date of December 30, 2022. The present task end date was extended to December 30, 2023, and this change order extends it further to December 30, 2024, representing a net increase of 366 days. The total task amount remains unchanged at $96,528.18, consisting of $14,766.00 in reimbursement and $81,762.18 in fixed fees. No financial adjustment accompanies this extension.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
Required Signatures: Adobe Signature
FDEP Contract No.: I Task Assignment No.: Change Order No.: I Project No.:CN330 TAOS 03 RM2204 i Project Location: Project Name: Quayside Island, Biscayne Bay ,Miami I Quayside Shoreline Dock Stabilization Consultant Name: Cummins Cederberg, Inc.
Consultant Representative: Phone: Email:
�_Cutt 954-401-2578 pcutt(a1cumminscederberg.com FDEP Contract Manager: Phone: Email: Ralph M. Perkins 850-245-2460 ralph. perkins�floridadep.gov l - -------------- ---- ------ ----- - --Description and Justification of Change:
This change oder will provide more time and administration needed to complete drawings and permits. See back up dated 11/9/2023 no cost time extension only.
Chan,:e in Task Amount:
Item Reimbursement fix«! Fee Total
Original Task Amount: $ 3.604.56 $ 3.604.56 Task amount including all previous Change Orders: $14.766.00 $81.762.18 $ 96.528.18 Net increase/decrease in task amount for this Change Order: $0. $0 $0 Total Amounts with all Change Orders: $ 14.766.00 $ 81.762.18 $ 96.528.18 Change in Task Time:
Original Task Execution Date: 4/13/2022
Original Task End Date: 12/30/2022
Present Task End Date: 12/30/2023 �- --- -· Net Chan�e in Days: 366
New Task End Date: 12/30/2024
Approval Signatures:
Lisa Yarborough Budget Representative, FDEP
11/17/2023
Jim McGuire Project Manager, FDEP Ralph M Perkins
--- ., •• ··---··----Contract Manager, FDEP J annek Cederberg Consultant Michael W. Foster Jr. P. E ... Contract Authority, FDEP l Proiect # Grant# Org Code i
Signature J ·,m M cG u ·,re
Digitally signed by Jim McGuire Date: 2023.11.1714:36:38-05'00'
Signature Ralph M Perkins g!�·�o;1�� d
2� y 1�����5�-�:'.�6�
Signature *--=-ture"'--=----'l-c=-~·---··· ------···- ··-··--··-·
Signature
Date
Date ----··---···· ········-· Date \ 1(2.1/105 Date
Date Cat/Year Fund Module Object Code f EO Amount t I I 29 Digit FLAIR Code: Total: I $ 0.00 t
(Revised 9-26-2018) Page 1 of I i
Michael W.
Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.11.30 15:57:31 -05'00'
McGuire, Jim
From:
Sent:
Natalie Bryce < nbryce@cumminscederberg.com > Thursday, November 9, 2023 12:04 PM
To: McGuire, Jim Cc: Penny Cutt Subject: RE: RCP CN330 TA 08 - 89370
EXTERNAL MESSAGE
This email originated outside ofDEP. Please use caution when opening attachments, clicking links, or responding to this email. Hi Jim, We are kindly requesting a no cost, time only extension request for TA 08 (FDEP Contract No. CN330), changing the task end date from 12/30/2023 to 12/30/2024.
Change in Task Time:
Original Task Execution Date: 4113/2022
Original Task End Date: l2i30t2022
Present Task End Date: t2/30/2023
Ne1. Change in Days: ra 3i6
New Task End Date: )2/30i202t"
On some our previous jobs with FDEP, an email request has been sufficient; however, if you need a request on formal letterhead or any additional documentation, let us know and we can provide.
Thank you, Natalie Bryce, MPS, WEDG, Project Scientist
CUMMINS I CEDERBERG
Coastal & Marine Engineering
Miami I Fort Lauderdale I Jupiter I Sarasota I St. Petersburg I Tallahassee 888 S. Andrews Ave., Suite 206, Fort Lauderdale, FL 33316 T: + I 9 54-510-3732 F: + 1 9 54-880-1646 nbryce@CumminsCederberq.com
From: McGuire, Jim <Jim.McGuire@FloridaDEP.gov>
Sent: Tuesday, November 7, 2023 3:08 PM To: Penny Cutt <pcutt@cumminscederberg.com>
Subject: RCP CN330 TA 08
| CN330 TA8 CO3 Quayside Island- Quayside Shoreline Dock Stabilization (002).pdf |