Summary: Task Assignment Notification Form - Curry Hammock State Park Beach Restoration

This is a Task Assignment Notification Form (Task Assignment No. 16) issued by the Florida Department of Environmental Protection (FDEP) under Contract CN330 to Cummins Cederberg, Inc., a coastal and marine engineering consulting firm. The task assignment pertains to engineering and environmental consulting services for beach restoration at Curry Hammock State Park in Monroe County, Florida. The contract manager is Ralph M. Perkins (FDEP), the project manager is Rose Frawley (FDEP), and the consultant representative is Jannek Cederberg. The task is authorized upon execution with a completion date of December 31, 2023.

The scope of work encompasses a phased analysis addressing approximately 1,305 linear feet of shoreline, comprising field investigations and data collection (topographic/bathymetric surveying, LiDAR review, aerial drone survey, preliminary benthic resource survey, and beach sand analysis), sea level rise and resilience evaluation, and feasibility assessment (regulatory due diligence and coastal engineering due diligence). The total fixed-price task amount is $66,836.87, with no cost reimbursement authorized. Payment is contingent upon FDEP approval of deliverables for each subtask. Deliverables include signed surveys, maps, orthographic imagery, field observation reports, technical memoranda, and feasibility studies. The project schedule allocates 60-day durations for most subtasks, with dependent tasks beginning 60 days after completion of Subtask 1.

View the file

Other files

File Type Posted
CN-370000-CN330-T10.pdf PDF
CN-370000-CN330-T17.pdf PDF
CN-370000-CN330-T18.pdf PDF
CN-370000-CN330-T20.pdf PDF
CN-370000-CN330-T25.pdf PDF
CN-370000-CN330-T27.pdf PDF
CN-370000-CN330-T35.pdf PDF
CN-370000-CN330-T3CO1.pdf PDF
CN-370000-CN330-T3CO2.pdf PDF
CN-370000-CN330-T5.pdf PDF
CN-370000-CN330-T5CO1.pdf PDF
CN-370000-CN330-T5CO2.pdf PDF
CN-370000-CN330-T6.pdf PDF
CN-370000-CN330-T8CO3.pdf PDF
CN-370000-CN330.pdf PDF
CN-370000-CN330-R1.pdf PDF
CN-370000-CN330-T11.pdf PDF
CN-370000-CN330-T12CO1.pdf PDF
CN-370000-CN330-T14.pdf PDF
CN-370000-CN330-T15.pdf PDF
CN-370000-CN330-T15CO1.pdf PDF
CN-370000-CN330-T19.pdf PDF
CN-370000-CN330-T1CO1.pdf PDF
CN-370000-CN330-T20CO2.pdf PDF
CN-370000-CN330-T21.pdf PDF
CN-370000-CN330-T22CO1.pdf PDF
CN-370000-CN330-T23CO1.pdf PDF
CN-370000-CN330-T28.pdf PDF
CN-370000-CN330-T29.pdf PDF
CN-370000-CN330-T30 CO1.pdf PDF
CN-370000-CN330-T30.pdf PDF
CN-370000-CN330-T31.pdf PDF
CN-370000-CN330-T34.pdf PDF
CN-370000-CN330-T4.pdf PDF
CN-370000-CN330-T7.pdf PDF
CN-370000-CN330-T8CO2.pdf PDF
CN-370000-CN330-T8CO5.pdf PDF
CN-370000-CN330-CMC1.pdf PDF
CN-370000-CN330-CMC2.pdf PDF
CN-370000-CN330-CMC4.pdf PDF
CN-370000-CN330-T1.pdf PDF
CN-370000-CN330-T12.pdf PDF
CN-370000-CN330-T16CO1.pdf PDF
CN-370000-CN330-T19CO1.pdf PDF
CN-370000-CN330-T2.pdf PDF
CN-370000-CN330-T21CO1.pdf PDF
CN-370000-CN330-T23.pdf PDF
CN-370000-CN330-T25CO1.pdf PDF
CN-370000-CN330-T26.pdf PDF
CN-370000-CN330-T8CO4.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: I Task Assignment No.: Owner's Name: I Project No.:CN330 16 FDEP 61407 Project Location: Project Name: Curry Hammock State Park Beach Re-Nourishment Consultant Name: Cummins Cederberg Consultant Representative: Phone: Email: Jannek Cederberg 305-741-6155 j cederberg@cumm i nscederberg.com FDEP Contract Manager: Phone: Email: Ralph M Perkins 850-245-2460 Ralph.Perkins@floridaDEP.gov Description of Task:

Task assignment to provide analysis of current conditions and erosion patterns of the beach at Curry Hammock State Park per attached proposal.

Project Manager: Rose Frawley

Start Date: I Upon ExecutionCompletion Date: I 12/31/23

Diane Langston Budget Representative, FDEP Rose Frawley Project Manager, FDEP Ralph M. Perkins Contract Manager, FDEP Jannek Cederberg Consultant Michael Foster Jr., P.E.

Contract Authority, FDEP

Project# Grant# Or2 Code

61407 37536060000

29 digit FLAIR Code:

Schedule Fixed Price Cost: $66,836.87Cost Reimbursement not to exceed: $ 0.00 Total Task Amount: $66,836.87 Approval Signatures:

Dl'ane Langston Digitally oigned by [l;ane Langston Date. 2022.051914:51:03-04'00'

Signature Rose Frawley Oog�ally signed by Rose Frawley

Dale 2022.06.20 15:06:14 --04W

Signature Ralph M Perkins �.:•��t:

d

2�"i��1��s��9:•

Signature

Date

Date

Date

Date

Cat/Year Fund Module Object Code EO

14126/22 423001 U3200 131500 QL

Total:

Amount

$66,836.87

$66,836.87

Page I of I

Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2022.06.23 11:20:20 -04'00'

ClL\lMINS I Cl:DER.Bf:RG Coastal & \\arine l:ngitH'l-ring

February 11, 2022

Andrew Lippens, Project Manager

Bureau of Design and Construction

Florida Department of Environmental Protection

3900 Commonwealth Boulevard, MS 520

Sent via email: Andrew.Lippens@FloridaDEP.gov

RE: Contract CN330 TA16

Curry Hammock State Park Beach Restoration Project

Dear Mr. Lippens:

89391-R2

Cummins Cederberg respectfully submits the enclosed revised proposal for Coastal Engineering and Environmental Consulting Services in support of beach restoration at Bahia Honda State

Park. The proposal has been revised to delete the Subtask 4 - Grants Opportunities Research.

The scope of services provided for this preliminary phase now includes the following:

Subtask 1 - Field Investigations and Data Collection

Subtask 1A - Topographic/Bathymetric Survey

Subtask 1 B - LiDAR Review and Processing

Subtask 1 C - Aerial Drone Survey

Subtask 1 D - Preliminary Benthic Resource Survey

Subtask 1 E - Beach Sand Analysis Subtask 2 - Sea Level Rise/Resilience Evaluation

Subtask 3 - Feasibility Assessment

Subtask 3A - Regulatory Due Diligence

Subtask 38 - Coastal Engineering Due Diligence

We look forward to continuing to provide Coastal Engineering and Environmental Permitting

Consulting Services to the Florida Department of Environmental Protection in support of Curry

Hammock State Park beach restoration.

Sincerely, CUMMINS CEDERBERG, INC.

Jannek Cederberg

Principal

CUMMINS CEDERBERG, INC. I South Miami I Fort Lauderdale I Jupiter I St Petersburg I Tallahassee

Curry Hammock State Park Beach Restoration

February 11, 2022

89391-R2

Beach Restoration

Curry Hammock State Park

Contract Number: CN330, Task Assignment Number: 16

Cummins Cederberg, Inc. (Cummins Cederberg) is pleased to present this Scope of Work to the

Florida Department of Environmental Protection (FDEP) for engineering and environmental consulting services in support of Curry Hammock State Park Beach Restoration along approximately 1,305 linear ft of shoreline, as depicted in Figure 1 below (Project). The red lines in the Figure represent a total of 755 linear ft of shoreline identified by Park staff as high priority and the blue line represents 550 linear ft of shoreline identified as a secondary priority. This proposal includes work for the entire 1,305 linear ft of shoreline.

CUMMINS CEDERBERG, INC. I South Miami I Fort Lauderdale I Jupiter I St. Petersburg I Tallahassee

File details come from the government source that posted it. Updated .