CN-370000-CN212-T1CO3.pdf
PDF 142 KB Posted
- Contract number
- CN212
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract CN212 with consultant Dodstone Group, Inc. The change order modifies Task Assignment 01 for the ADA Cabin Replacement project located at T.H. Stone Memorial St. Joe Peninsula State Park. The contract involves FDEP's Bureau of Design and Construction, with primary contacts including Project Manager Richard Rowe and Contract Manager Mae Roth on the agency side, and Consultant Representative Jodie Dodson from Dodstone Group, Inc. on the contractor side.
Change Order 03 authorizes additional construction administration assistance to address contractor-generated complexities in the project's design and structural engineering work, specifically related to connecting the existing septic system to the cabin's drain lines. The change increases the task amount by $3,407.29, bringing the total task value to $33,718.46. Services include structural engineering from Bliss & Nytray Engineering ($1,558.29) and architectural services from DodStone Group Architects ($1,849.00), covering principal engineers, project engineers, registered architects, CAD operators, and senior CAD operators. The change order extends the task end date from July 13, 2016, to July 13, 2017, with all costs identified as non-reimbursable and billed on a not-to-exceed basis upon completion of work. The change was approved and executed on January 17, 2017.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .