PC-370000-CN212.pdf
PDF 265 KB Posted
- Contract number
- CN212
- Issued by
- Florida
About this file
Document Summary
This is a Task Assignment Change Order Form (Change Order No. 3) issued by the Florida Department of Environmental Protection (FDEP) for a professional services contract with Dodstone Architects, Inc. The contract covers design services for the Wakulla Springs State Park Lodge Elevator Modifications project located in Wakulla County, Florida. The project is managed by FDEP's Bureau of Design & Construction, with Donald Finkbeiner serving as the Project Manager and Ralph Perkins as the Contract Manager.
The change order authorizes an increase of $11,554.46 to the contract, bringing the total contract value to $149,579.98. The scope addition covers Subtask 5b, which involves updating construction drawings and elevator specifications to comply with the 2023 Florida Building Code, 8th Edition, and the A17.1-2019 Safety Code for Existing Elevators and Escalators. The deliverables include revised elevator specifications, updated construction document drawings in PDF format, and three printed sets signed and sealed for permit review. The work is to be completed within 30 calendar days from the agreement execution date, with a revised end date of March 3, 2025. Dodstone Architects' cost includes labor from multiple team members (principals, registered architects, engineers, CAD technicians) and other subconsultants (Facility Solutions & Management, Applied Research & Design, Bliss & Niytray, and VDA), with printing costs not to exceed $500. The change order was executed on September 19, 2024, and is funded through the Florida account code 6A011C.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
( ) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN212 22 3 6A011C
Wakulla Springs State Park Lodge Elevator Modifications
Dodstone Architects
Joel Dodson 850-656-7326 jdodson@dodstone.com
Ralph Perkins 850-245-2460 Ralph.Perkins@FloridaDEP.gov
This is a plan revision to include the current 2023 building code. Please see attached request dated August 20, 2024.
$ 0.00 $ 128,656.02 $ 128,656.02 $ 0.00 $ 138,025.52 $ 138,025.52
$ 500.00 $ 11,054.46 $ 11,554.46 $ 500.00 $ 149,079.98 $ 149,579.98
8/22/22
8/30/24
03/03/25
03/03/25
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2024.09.09 11:08:41 -04'00'
Donald Finkbeiner Donald J. Finkbeiner Digitally signed by Donald J.
Finkbeiner Date: 2024.09.09 16:27:44 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2024.09.10 09:23:25 -04'00'
Joel Dodson Joel L Dodson Digitally signed by Joel L Dodson Date: 2024.09.10 13:29:08 -04'00'
Bryan Bradner Bryan Bradner Digitally signed by Bryan Bradner Date: 2024.09.19 10:49:56 -04'00'
6A011C CSFRF 37501011204 085154/22 000286 U3200 131500 AD $ 0.38
6A011C 37501011204 080039/22 423001 U3200 131500 QK $ 11,554.08
$ 11,554.46
Subtask 5b Firm Name Position Classification Hourly Rate Hours Price Cost Dodstone Architects Principal $168.00 2 $336.00
Registered Architect $133.00 10 $1,330.00 Graduate Architect $88.00 5 $440.00
$2,106.00
Facility Solutions & Management Principle Consultant $130.64 1 $130.64
Project Engineer $110.15 2 $220.30 Staff Engineer $80.38 2 $160.76 CADD Technician $49.23 3 $147.69 Admin $34.02 1 $34.02
$693.41
Applied Research & Design Professional Engineer $134.00
$536.00
CAD/Designer $59.00 2 $118.00 $654.00
Bliss & Niytray Principal $178.77 3 $536.31 Engineer $83.43 13.5 $1,126.31
CADD $93.86 10 $938.60
$2,601.22 VDA Principal/Director $300.00 1 $300.00
PM/Consultant $249.99 17 $4,249.83 Clerical $90.00 5 $450.00
$4,999.83 Subtask 5b $11,054.46
Code update
Code update
Dodstone Architects | 3011-1 Powell Road | Tallahassee, FL 32308 | 850.656.7326 | #AR0015211 agreement execution.
Dodstone Architects | 3011-1 Powell Road | Tallahassee, FL 32308 | 850.656.7326 | #AR0015211
File details come from the government source that posted it. Updated .