CN-370000-CN212-TA05C01.pdf
PDF 309 KB Posted
- Contract number
- CN212
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for contract CN212, Task Assignment No. 05, Change Order No. 1. The consultant is DodStone Group Architects, Inc., represented by Karin Zawrotny. The project involves Loop 4 Campground Bathhouse Improvements at Big Lagoon State Park, with FDEP Contract Manager Mae Roth overseeing the engagement. The change order was approved on January 30, 2017, and signed by multiple FDEP officials including Budget Representative Diane Langston, Project Manager Mae Roth, Contract Manager Laura S. Ross, and Contract Authority Joel Dodson.
The change order increases the task amount by $5,176.01 to address additional structural design needs identified during initial assessments. The original task amount of $1,471.38 in reimbursable costs and $23,293.13 in fixed fees is expanded to $1,521.38 and $28,419.14 respectively, bringing the total task amount to $29,940.52. The scope includes three subtasks: Subtask 1c (Timber Assessment) at $1,870.49, involving pole inspection and structural analysis; Subtask 3c (Additional Detailing) at $3,305.52, requiring CAD work and detailed drawings; and related oversight activities. The original task execution period extends from September 27, 2016, to August 25, 2017, with the change order adding 47 days, resulting in a new end date of October 11, 2017. Fixed costs are charged on an hourly basis with rates ranging from $50 to $178.77 per hour for various professional positions, and reimbursable costs are capped at $50.00.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .