This is a Task Assignment Notification Form and detailed proposal for design and construction administration services issued by the Florida Department of Environmental Protection (FDEP) to Dodstone Group Architects, a consulting firm based in Tallahassee, Florida. The contract is identified as FDEP Contract No. CN212, Task Assignment No. 09, for Project No. 6M111C, located at T.H. Stone Memorial St. Joseph Peninsula State Park. The project is managed by FDEP's Bureau of Design & Construction, with Jack Brady serving as the FDEP Contract Manager and Richard Rowe as the FDEP Project Manager. Additional engineering and design support is provided by FSM Engineering and Bliss & Niytray. The contract execution date is December 12, 2019, with a completion deadline of December 31, 2020.

The scope of work encompasses design and construction administration services for ADA alterations to the beach access day use restroom facility, including eleven detailed subtasks: (1) as-built review ($5,428.26), (2) 30% construction documents ($3,487.16), (3) Coastal Construction Control Line impact review ($549.50), (4a) 90% construction documents ($14,110.40), (4b) cost projection ($1,273.62), (4c) 90% review meeting ($399.00), (5) 100% construction documents ($3,191.24), (6a) permitting and bidding assistance ($3,311.68 including $500 reimbursable), (6b) pre-construction meeting ($931.00), and (7a-7h) limited construction administration and site visits ($4,208.70, $931.00, $931.00, $931.00, $1,064.00, $1,294.84, and $1,682.34 respectively). The total fixed price contract amount is $44,155.73 with an additional cost reimbursement allowance not to exceed $500.00, bringing the total task amount to $44,655.73. Payment is contingent upon submission and FDEP approval of each deliverable, with no payment for unsatisfactory work and potential contract termination for failure to perform.

View the file

Other files

File Type Posted
CN-370000-CN212-CMC1.pdf PDF
CN-370000-CN212-CMC2.pdf PDF
CN-370000-CN212-T10.pdf PDF
CN-370000-CN212-T11.pdf PDF
CN-370000-CN212-T15CO3.pdf PDF
CN-370000-CN212-T17.pdf PDF
CN-370000-CN212-T18.pdf PDF
CN-370000-CN212-T18CO1.pdf PDF
CN-370000-CN212-T23CO2.pdf PDF
CN-370000-CN212-T8CO2.pdf PDF
CN-370000-CN212-T9CO1.pdf PDF
CN-370000-CN212-TA05C01.pdf PDF
CN-370000-CN212-TA1.pdf PDF
CN-370000-CN212-TA14.pdf PDF
CN-370000-CN212.pdf PDF
PC-370000-CN212.pdf PDF
CN-370000-CN212-AM1.pdf PDF
CN-370000-CN212-CMC3.pdf PDF
CN-370000-CN212-T11CO1.pdf PDF
CN-370000-CN212-T11CO2.pdf PDF
CN-370000-CN212-T12.pdf PDF
CN-370000-CN212-T13.pdf PDF
CN-370000-CN212-T14CO1.pdf PDF
CN-370000-CN212-T16.pdf PDF
CN-370000-CN212-T18CO2.pdf PDF
CN-370000-CN212-T18CO3.pdf PDF
CN-370000-CN212-T19CO1.pdf PDF
CN-370000-CN212-T21.pdf PDF
CN-370000-CN212-T22.pdf PDF
CN-370000-CN212-T23CO3.pdf PDF
CN-370000-CN212-T5.pdf PDF
CN-370000-CN212-T7.pdf PDF
CN-370000-CN212-T7CO1.pdf PDF
CN-370000-CN212-TA15.pdf PDF
CN-370000-CN212-TA3.pdf PDF
CN-370000-CN212-TA8 CO4.pdf PDF
CN-370000-CN212-T15CO1.pdf PDF
CN-370000-CN212-T15CO2.pdf PDF
CN-370000-CN212-T18CO4.pdf PDF
CN-370000-CN212-T1CO2.pdf PDF
CN-370000-CN212-T22CO1.pdf PDF
CN-370000-CN212-T23CO4.pdf PDF
CN-370000-CN212-T24CO3.pdf PDF
CN-370000-CN212-T25.pdf PDF
CN-370000-CN212-T4.pdf PDF
CN-370000-CN212-T8.pdf PDF
CN-370000-CN212-T8CO3.pdf PDF
CN-370000-CN212-T11CO3.pdf PDF
CN-370000-CN212-T14CO2.pdf PDF
CN-370000-CN212-T14CO3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: I Task Assignment No.: Owner's Name: I Project No.:

CN212 09 FDEP-DRP 6Ml l lC Project Location: Project Name:

T. H. Stone Memorial St. Joseph Peninsula State Park Beach Access Day Use Restroom ADA Modifications Consultant Name:

Dodstone Group Architects Consultant Representative: Phone: Email:

Karin Zawrotny 850-656-7326 kzawrotny@dodstone.com FDEP Contract Manager: Phone: Email:

Jack Brady 850-245-2535 Jack.Brady@FloridaDEP.gov Description of Task:

Design and construction administration services for ADA alterations to the beach access day use restroom. See proposal dated 12/11/2019 attached.

Project Manager: Richard Rowe or Successor

Start Date: I Upon execution Completion Date: I 12/31/20

Greg Turral

Budget Representative, FDEP Richard Rowe

Project Manager, FDEP Jack Brady

Contract Manager, FDEP Jody Dodson

Consultant Michael W. Foster, Jr., P.E.

Contract Authority, FDEP

Project# Grant# Or2 Code 6Mll1C FD079 37501000069

29 di2it FLAIR Code:

Schedule

Fixed Price Cost: $44,155.73 Cost Reimbursement not to exceed: $ 500.00

Total Task Amount: $44,655.73 Approval Signatures:

Gregory Tu rra I Digitally signed by Gregory Turral Date: 2019.12.12 13:24:51-05'00'

Signature R. J R

Digitally signed by Richard J.

1chard . owe Rowe

Date: 2019.12.12 13:33:47 -05'00'

Signature

Jack Brady DigitallysignedbyJackBrady Date: 2019.12.12 13:54:10-05'00'

Signature

Joel L Dodson Digitally signed by Joel L Dodson Date: 2019.12.16 12:52:23 -05'00'

Signature s /4 1gnature

12-12-2019

Date 12-12-2019

Date

Date

Dat�

Cat/Year Fund Module Ob.iect Code EO Amount

088040-19 000286 U3200 131500 AR $ 44,655.73

Total: $44,655.73

Subtask 1 - As-Built review

Description: Using the drawings provided by DEP, CAD files will be generated that can be used as the basis for preparing a set of permit drawings. The architect will visit the site to verify key dimensions critical to ADA compliance in the field. The structural engineer will provide a list of photos to be taken by the architect while they are on site. In a subsequent phase, they will use these photos in conjunction with the existing drawings provided by DEP to gain an understanding of the cause of the cracks observed in the walls. The CAD files will be updated based upon information collected during the site visits. Inaccessible or concealed areas will not be included in this verification and/or documentation.

Deliverables: Deliverables will consist of pdf files of the floor plans, roof plan and exterior elevations sent electronically to DEP's designated project manager. Documentation of plumbing will be limited to what is immediately accessible and what is required to achieve the project goals as previously listed. Specific documentation of ADA infractions would not be indicated as a complete re-model of the interior is anticipated.

Schedule: Within 20 working days from execution

Performance Measures: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 1 As-Built Review

Firm Name Position Classification

Dodstone Architects Principal

Registered Architect

Graduate Architect

CADD Operator

Principal/Senior FSM Engineering Engineer

Proiect Enqineer

Staff Engineer

CADD Tech

Admin

Subtask 1 As-Built Review

Subtask 1 - Reimbursable Costs: $0

No mileage being charged to DEP

All deliveries will be in electronic format

Total Subtask 1 Costs:

$5,428.62

I Hourly Rate I Hours I Total Fixed Price Cost

$168.00 $0.00

$133.00 11 $1,463.00

$88.00 9 $792.00

$60.00 12 $720.00

$2 975.00

$130.64

$1,045.12

$110.15 6 $660.90

$80.38 6 $482.28

$49.23 4 $196.92

$34.02 2 $68.04

$2,453.26

$5;428.26

Dodstone Architects I 3011-1 Powell Road I Tallahassee, FL 32308 I 850.656.7326 I #AA26001632