CN-370000-CN212-T7CO1.pdf
PDF 1 MB Posted
- Contract number
- CN212
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form from the Florida Department of Environmental Protection (FDEP) for an indefinite delivery contract with Dodstone Group Architects. The document pertains to Change Order No. 01 for Project No. 61237C, Day Use Restroom ADA Modifications at Ochlockonee River State Park. The FDEP Contract Manager is Richard Rowe, and the Consultant Representative is Karin Zawrotny. The contract involves additional structural engineering services for the restroom modifications project.
The change order adds two subtasks to the existing contract: Task 4b for Structural Design & Review of two bathroom entry doors, totaling $1,376.57 in fixed costs, and Task 4c for Wind Pressure Drawings & Notes (if required by local governing authority), totaling $1,209.73 in fixed costs. The net increase to the task amount is $0.00, with the total task amount remaining at $800.00 in reimbursement and $42,433.90 in fixed fees, for a combined total of $43,233.90. Task execution dates remain unchanged, with an original start date of March 14, 2019, and an end date of December 31, 2019. Deliverables include structural member sizing details, CAD files, construction documents, and wind pressure drawings to be submitted electronically to the FDEP project manager within specified timeframes (10 working days for Task 4b and 5 working days for Task 4c).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .