This document is a Task Assignment Notification Form for a project under FDEP Contract No. CN212 involving the Florida Department of Environmental Protection (FDEP), Dodstone Group Architects as the primary consultant, and multiple subconsultants including Facility Solutions & Management, Applied Research & Design, Bliss & Niytray, and VDA (Vertical Design Associates). The project concerns design and permitting services for elevator repairs and modifications at Edward Ball Wakulla Springs State Park Lodge in Wakulla County, Florida. The contract execution date is August 5, 2022, with a completion date of August 30, 2024.
The total task amount is $128,656.02 as a fixed price contract. Services include schematic design development, preliminary and final structural evaluations, hazardous materials testing, construction document preparation at 60%, 90%, and 100% completion levels, elevator specifications, permitting services including submissions to the State Fire Marshal and Florida Division of Historical Resources, bidding support, pre-construction and construction administration services with multiple site visits by architects and engineers. The contract specifies hourly rates for various professional positions ranging from $34.02 to $300.00 per hour, with deliverables consisting primarily of PDF files of drawings, specifications, meeting minutes, and reports. Work is funded through FDEP using CSFRF grant funding. Optional services related to materials testing and VDA attendance total an additional $1,531.96 if requested. The funding code indicates allocation through Project 6A011C with specific FLAIR coding for state accounting purposes.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN212 22 FDEP 6A011C
Edward Ball Wakulla Springs State Park Lodge Elevator Modifications
Dodstone Group Architects
Joel Dodstone 850-656-7326 jdodson@dodstone.com
Ralph Perkins 850-245-2460 ralph.perkins@floridadep.gov
Design and permitting services for the repairs and modifications of an elevator at the above location. Please note the attached Revised Proposal dated 8/4/2022.
Edward Straight
Upon Execution $ 128,656.02 08/30/2024
$ 128,656.02
Diane Langston Diane Langston Digitally signed by Diane Langston Date: 2022.08.05 14:41:30 -04'00'
Edward Straight Edward Straight Digitally signed by Edward Straight Date: 2022.08.05 13:33:19 -04'00' 05 August 2022
Ralph M Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2022.08.08 11:19:30 -04'00'
Joel Dodson Jodie Dodson Digitally signed by Jodie Dodson Date: 2022.08.09 15:41:20 -04'00'
Bryan J Bradner Bryan Bradner Digitally signed by Bryan Bradner Date: 2022.08.22 16:28:51 -04'00'
6A011C CSFRF 37501011204 085154/22 000286 U3200 131500 AD $ 128,656.02
$ 128,656.02
Dodstone Architects | 3011-1 Powell Road | Tallahassee, FL 32308 | 850.656.7326 | #AR0015211
Subtask 1a Schematic Design
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 18 $2,394.00 Graduate Architect $88.00 24 $2,112.00 CADD Operator $60.00 12 $720.00
$5,310.00
Facility Solutions & Management Principle Consultant $130.64 1 $130.64
Project Engineer $110.15 5 $550.75 Admin $34.02 1 $34.02
$715.41
CN212 TA22
Applied Research & Design Professional Engineer $134.00
$268.00 $268.00
Bliss & Niytray Principal $178.77 1 $178.77 Project Engineer $119.18 3 $357.54
$536.31
VDA Principal/Director $300.00 2 $600.00
VP $275.01 10 $2,750.10
$3,350.10 Subtask 1a Schematic Design $10,179.82
Subtask 1b
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 3 $399.00
$483.00 Subtask 1b $483.00
Schematic Design Review Meeting
Schematic Design Review Meeting
Subtask 1c
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 10 $1,330.00 Graduate Architect $88.00 4 $352.00 CADD Operator $60.00 3 $180.00
$1,946.00
Facility Solutions & Management Principle Consultant $130.64 3 $391.92
Admin $34.02 1 $34.02 $425.94
VDA Principal/Director $300.00 0.5 $150.00
VP $275.01 2 $550.02
$700.02 Subtask 1c $3,071.96
Prelim. Meetings w/ Permitting Departs.
Prelim. Meetings w/ Permitting Departs.
Subtask 2a
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 2 $266.00
$350.00
Materials Testing
Subtask 2a Optional
Price Cost
Dodstone Architects Principal $168.00 0 $0.00 Registered Architect $133.00 4 $532.00
$532.00
VDA Principal/Director $300.00 0 $0.00 PM/Consultant $249.99 4 $999.96
$999.96 Subtask 2a Optional $1,531.96
Materials Testing - VDA and DS attendance
Materials Testing - VDA and DS attendance
Nova Staff Engineer $78.03 26 $2,028.78 Principal Engineer $274.55 6 $1,647.30 Secretary/Clerical/CADD $58.00 6 $348.00
Mobilization Fee $500.00 1 $500.00 Brick extraction tools $300.00 1 $300.00 Brick & asbestos testing $4,400.00 1 $4,400.00 ACM Sample Analysis $12.00 30 $360.00 XRF Equipment Charge $200.00 1 $200.00 ACM Tools and Supplies $55.00 1 $55.00
$9,839.08 Subtask 2a $10,189.08Materials Testing
Subtask 2b
Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 4 $532.00
$616.00
Bliss & Niytray Principal $178.77 16 $2,860.32 Engineer $83.43 16 $1,334.88
$4,195.20
Subtask 2b Pre-Design Structural Site Visit $4,811.20
Pre-Design Structural Site Visit
Subtask 2c
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 4 $532.00
$616.00
VDA Principal/Director $300.00 0.5 $150.00
VP $275.01 2 $550.02
$700.02 Subtask 2c $1,316.02Preliminary Meeting w/ FDHR
Preliminary Meeting w/ FDHR
Subtask 3a
Price Cost
Dodstone Architects Principal $168.00 2 $336.00 Registered Architect $133.00 50 $6,650.00 Graduate Architect $88.00 30 $2,640.00 CADD Operator $60.00 35 $2,100.00
$11,726.00
Facility Solutions & Management Principle Consultant $130.64 3.25 $424.58
Project Engineer $110.15 9.5 $1,046.43 Staff Engineer $80.38 5 $401.90 CADD Technician $49.23 16 $787.68 Admin $34.02 0.5 $17.01
$2,677.60
Applied Research & Design Professional Engineer $134.00
13.5 $1,809.00
CAD/Designer $59.00 15 $885.00 $2,694.00
Bliss & Niytray Principal $178.77 8 $1,430.16 Engineer $83.43 40 $3,337.20
$4,767.36
Subtask 3a $21,864.96Preparation of 60% Const. Documents
Preparation of 60% Const. Documents
Subtask 3b
Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 5 $665.00
$749.00
VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 8 $1,999.92 Clerical $90.00 3 $270.00
$2,569.92 Subtask 3b $3,318.92
First Draft of Elevator Specifications
First Draft of Elevator Specifications
Subtask 3c
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 4 $532.00
$616.00 Subtask 3c $616.00
60% CDs Review Meeting
60% CDs Review Meeting
Subtask 3d
Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 6 $798.00 Graduate Architect $88.00 3 $264.00
$1,146.00 Subtask 3d $1,146.00Preliminary Submission to FDHR
Preliminary Submission to FDHR
Subtask 4a
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 2 $336.00 Registered Architect $133.00 35 $4,655.00 Graduate Architect $88.00 25 $2,200.00 CADD Operator $60.00 30 $1,800.00
$8,991.00
Facility Solutions & Management Principle Consultant $130.64 2.5 $326.60
Project Engineer $110.15 7.5 $826.13 Staff Engineer $80.38 5 $401.90 CADD Technician $49.23 16 $787.68 Admin $34.02 0.5 $17.01
$2,359.32
Applied Research & Design Professional Engineer $134.00
$1,340.00
CAD/Designer $59.00 16 $944.00 $2,284.00
Bliss & Niytray Principal $178.77 7 $1,251.39 Engineer $83.43 37 $3,086.91
$4,338.30 Subtask 4a $17,972.62Preparation of 90% Construction Documents
Preparation of 90% Construction Documents
Subtask 4b
Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 2.5 $332.50
$416.50
VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 4 $999.96 Clerical $90.00 2 $180.00
$1,479.96 Subtask 4b $1,896.46
Final Elevator Specifications
Final Elevator Specifications
Subtask 4c
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 4 $532.00
$616.00 Subtask 4c $616.00
90% CDs Review Meeting
90% CDs Review Meeting
Subtask 5a
Price Cost
Dodstone Architects Principal $168.00 2 $336.00 Registered Architect $133.00 10 $1,330.00 Graduate Architect $88.00 3 $264.00 CADD Operator $60.00 5 $300.00
$2,230.00
Facility Solutions & Management Principle Consultant $130.64 3 $391.92
Project Engineer $110.15 4.5 $495.68 Staff Engineer $80.38 2 $160.76 CADD Technician $49.23 4 $196.92 Admin $34.02 0.5 $17.01
$1,262.29
Applied Research & Design Professional Engineer $134.00
$134.00
CAD/Designer $59.00 2 $118.00 $252.00
Bliss & Niytray Principal $178.77 1 $178.77 Engineer $83.43 3 $250.29
$429.06 Subtask 5a $4,173.35Preparation of 100% Construction Documents
Preparation of 100% Construction Documents
Subtask 6a Permitting Services
Price Cost
Dodstone Architects Principal $168.00 1 $168.00 Registered Architect $133.00 6 $798.00 Graduate Architect $88.00 3 $264.00 CADD Operator $60.00 2 $120.00
$1,350.00
Facility Solutions & Management Principle Consultant $130.64 1.25 $163.30
Project Engineer $110.15 3.5 $385.53 CADD Technician $49.23 1 $49.23 Admin $34.02 0.5 $17.01
$615.07
Applied Research & Design Professional Engineer $134.00
$134.00
CAD/Designer $59.00 0 $0.00 $134.00
Bliss & Niytray Principal $178.77 2 $357.54 $357.54
Subtask 6a Permitting Services $2,456.61
Subtask 6b Submission to State Fire Marshall
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 3 $399.00 Graduate Architect $88.00 1 $88.00 CADD Operator $60.00 2 $120.00
$691.00
Subtask 6b Submission to State Fire Marshall $691.00
Subtask 6c
Price Cost
Dodstone Architects Principal $168.00 1 $168.00 Registered Architect $133.00 6 $798.00 Graduate Architect $88.00 2 $176.00
$1,142.00 Subtask 6c $1,142.00
Final Submission to FDHR
Final Submission to FDHR
Subtask 6d Bidding Services
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 6 $798.00 Graduate Architect $88.00 5 $440.00 CADD Operator $60.00 2 $120.00
$1,442.00
Facility Solutions & Management Principle Consultant $130.64 1.25 $163.30
Admin $34.02 0.5 $17.01 $180.31
Applied Research & Design Professional Engineer $134.00
$134.00
CAD/Designer $59.00 0 $0.00 $134.00
Bliss & Niytray Principal $178.77 4 $715.08 $715.08
Subtask 6d Bidding Services $2,471.39
Subtask 6e
Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 5.5 $731.50
$815.50
VDA Principal/Director $300.00 0.5 $150.00 PM/Consultant $249.99 4 $999.96
$1,149.96 Subtask 6e $1,965.46
Attend Pre-Bid meeting on site
Attend Pre-Bid meeting on site
Subtask 6f
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 2 $266.00
$350.00
VDA Principal/Director $300.00 0.5 $150.00 PM/Consultant $249.99 4 $999.96 Clerical $90.00 2 $180.00
$1,329.96 Subtask 6f $1,679.96Assist Contractor in Evaluation of Bids from
Assist Contractor in Evaluation of Bids from Elevator Subs
Subtask 6g
Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 5.5 $731.50
$815.50
VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 4 $999.96 Clerical $90.00 1 $90.00
$1,389.96 Subtask 6g $2,205.46
Attend Pre-Const. meeting on site
Attend Pre-Const. meeting on site
Subtask 7a
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 8 $1,064.00
$1,148.00
VDA Principal/Director $300.00 0.5 $150.00 PM/Consultant $249.99 8 $1,999.92 Clerical $90.00 1 $90.00
$2,239.92 Subtask 7a $3,387.92
Review of Elevator Shop Drawings
Review of Elevator Shop Drawings
Subtask 7b
Price Cost
Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 12 $1,596.00 Graduate Architect $88.00 5 $440.00 CADD Operator $60.00 6 $360.00
$2,480.00
Facility Solutions & Management Principle Consultant $130.64 0.25 $32.66
Project Engineer $110.15 2 $220.30
Staff Engineer $80.38
$723.42 Admin $34.02 0.5 $17.01
$993.39
Applied Research & Design Professional Engineer $134.00
4.5 $603.00
CAD/Designer $59.00 0 $0.00 $603.00
Bliss & Niytray Principal $178.77 2 $357.54 Engineer $83.43 8 $667.44
$1,024.98
VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 9 $2,249.91 Clerical $90.00 3 $270.00
$2,819.91
Subtask 7b Limited Construction Admin. Services $7,921.28
Limited Construction Admin. Services
Subtask 8a
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Registered Architect $133.00 6 $798.00 Subtask 8a $798.00
Architectural Interim Site Visit 1
Architectural Interim Site Visit 1
Subtask 8b
Price Cost
Dodstone Architects Registered Architect $133.00 6 $798.00 Subtask 8b $798.00Architectural Interim Site Visit 2
Architectural Interim Site Visit 2
Subtask 8c
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Registered Architect $133.00 6 $798.00 Subtask 8c $798.00
Architectural Interim Site Visit 3
Architectural Interim Site Visit 3
Subtask 8d
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Registered Architect $133.00 7 $931.00 Subtask 8d $931.00Architectural Substantial Site Visit
Architectural Substantial Site Visit
Subtask 8e
Price Cost
Dodstone Architects Registered Architect $133.00 6 $798.00 Subtask 8e $798.00Architectural Final Completion Site Visit
Architectural Final Completion Site Visit
Subtask 8f
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
Applied Research & Design Professional Engineer $134.00
$402.00 $402.00
Subtask 8f $601.50
Electrical Interim Site Visit 1
Electrical Interim Site Visit 1
Subtask 8g
Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
Applied Research & Design Professional Engineer $134.00
$402.00 $402.00
Subtask 8g $601.50
Electrical Interim Site Visit 2
Electrical Interim Site Visit 2
Subtask 8h
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
Facility Solutions & Management Principle Consultant $130.64 0.25 $32.66
Staff Engineer $80.38
$241.14 Admin $34.02 0.5 $17.01
$290.81
Subtask 8h $490.31
Mechanical/Plumbing Interim Site Visit 1
Mechanical/Plumbing Interim Site Visit 1
Subtask 8i
Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
Facility Solutions & Management Principle Consultant $130.64 0.25 $32.66
Staff Engineer $80.38
$241.14 Admin $34.02 0.5 $17.01
$290.81
Subtask 8i $490.31
Mechanical/Plumbing Interim Site Visit 2
Mechanical/Plumbing Interim Site Visit 2
Subtask 8j
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
Applied Research & Design Professional Engineer $134.00
3.5 $469.00 $469.00
Subtask 8j $668.50Electrical Substantial Site Visit
Electrical Substantial Site Visit
Subtask 8k
Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
Facility Solutions & Management Principle Consultant $130.64 0.25 $32.66
Staff Engineer $80.38
$241.14 Admin $34.02 0.5 $17.01
$290.81
Subtask 8k $490.31
Mechanical/Plumbing Substantial Site Visit
Mechanical/Plumbing Substantial Site Visit
Subtask 8l
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
Bliss & Niytray Principal $178.77 0.5 $89.39 Engineer $83.43 4 $333.72 Clerical $59.59 1 $59.59
$482.70
Subtask 8l $682.20
Structural Engineer Interim Site Visit 1
Structural Engineer Interim Site Visit 1
Subtask 8m
Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
Bliss & Niytray Principal $178.77 0.5 $89.39 Engineer $83.43 4 $333.72 Clerical $59.59 1 $59.59
$482.70
Subtask 8m $682.20Structural Engineer Interim Site Visit 2
Structural Engineer Interim Site Visit 2
Subtask 8n
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 6 $1,499.94 Clerical $90.00 2 $180.00
$1,979.94
Subtask 8n $2,179.44
Elevator Consultant Interim Site Visit 1
Elevator Consultant Interim Site Visit 1
Subtask 8o
Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 6 $1,499.94 Clerical $90.00 2 $180.00
$1,979.94
Subtask 8o $2,179.44
Elevator Consultant Interim Site Visit 2
Elevator Consultant Interim Site Visit 2
Subtask 8p
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 6 $1,499.94 Clerical $90.00 2 $180.00
$1,979.94
Subtask 8p $2,179.44
Elevator Consultant Substantial Site Visit
Elevator Consultant Substantial Site Visit
Subtask 8q
Price Cost
Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50
VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 6 $1,499.94 Clerical $90.00 2 $180.00
$1,979.94
Subtask 8q $2,179.44Elevator Consultant Final Site Visit
Elevator Consultant Final Site Visit
Summary Provider Base Service Additional
Service Subtotal Reimb. Total
Subtask 1a DS $5,310.00 $10,179.82 $10,179.82
FSM $715.41
ARD $268.00
BNI $536.31
VDA $3,350.10
Subtask 1b DS $483.00 $483.00 $483.00
Subtask 1c DS $1,946.00 $3,071.96 $3,071.96
FSM $425.94
VDA $700.02
Subtask 2a DS $350.00 $10,189.08 $10,189.08 Nova $9,839.08
DS $532.00 $1,531.96 $1,531.96
VDA $999.96
DS $616.00 $4,811.20 $4,811.20
BNI $4,195.20
DS $616.00 $1,316.02 $1,316.02
$700.02
DS $9,066.00 $2,660.00 $21,864.96 $21,864.96
FSM $2,677.60
ARD $2,694.00
BNI $4,767.36
DS $749.00 $3,318.92 $3,318.92
VDA 2569.92
DS $616.00 $616.00 $616.00
DS $1,146.00 $1,146.00 $1,146.00
DS $7,395.00 $1,596.00 $17,972.62 $17,972.62
FSM $2,359.32
ARD $2,284.00
BNI $4,338.30
DS $416.50 $1,896.46 $1,896.46
VDA $1,479.96
DS $616.00 $616.00 $616.00
DS $2,230.00 $4,173.35 $4,173.35
FSM $1,262.29
ARD $252.00
BNI $429.06
DS $1,350.00 $2,456.61 $2,456.61
FSM $615.07
ARD $134.00
BNI $357.54
DS $691.00 $691.00 $4,000.00 $4,691.00
DS $1,142.00 $1,142.00 $1,142.00
DS $1,442.00 $2,471.39 $2,471.39
FSM $180.31
ARD $134.00
BNI $715.08
DS $815.50 $1,965.46 $1,965.46
VDA $1,149.96
DS $350.00 $1,679.96 $1,679.96
VDA $1,329.96
DS $815.50 $2,205.46 $2,205.46
VDA $1,389.96
Materials Testing - VDA and DS attendance
Permitting Services
Attend Pre-Const.
meeting on site
Subtask 6f
Subtask 3b First Draft of Elevator Specifications
Subtask 3c
Subtask 3d
Subtask 4a
Subtask 2b
Subtask 2c
Subtask 3a Preparation of 60% Const. Documents
Pre-Design Structural Site Visit
Schematic Design
Subtask 6g
Preliminary Submission to FDHR
Prelim. Meetings w/ Permitting Departs.
Materials Testing
Preliminary Meeting w/
FDHR
Final Elevator Specifications
Subtask 6c
Subtask 2a Optional
Subtask 6a
Schematic Design Review Meeting
60% CDs Review Meeting
Preparation of 90% Construction Documents
90% CDs Review Meeting
Final Submission to
FDHR
Assist Contractor in Evaluation of Bids from Elevator Subs
Subtask 5a Preparation of 100% Construction Documents
Subtask 6b Submission to State Fire Marshall
Subtask 6d
Bidding Services
Subtask 6e Attend Pre-Bid meeting on site
Subtask 4c
Subtask 4b
DS $1,148.00 $3,387.92 $3,387.92
VDA $2,239.92
DS $2,480.00 $7,921.28 $7,921.28
FSM $993.39
ARD $603.00
BNI $1,024.98
VDA $2,819.91
DS $798.00 $798.00 $798.00
DS $798.00 $798.00 $798.00
DS $798.00 $798.00 $798.00
DS $931.00 $931.00 $931.00
DS $798.00 $798.00 $798.00
DS $199.50 $601.50 $601.50
ARD $402.00
DS $199.50 $601.50 $601.50
ARD $402.00
Subtask 8h DS $199.50 $490.31 $490.31
FSM $290.81
Subtask 8i DS $199.50 $490.31 $490.31
FSM $290.81
Subtask 8j DS $199.50 $668.50 $668.50
ARD $469.00
Subtask 8k DS $199.50 $490.31 $490.31
FSM $290.81
DS $199.50 $682.20 $682.20
BNI $482.70
DS $199.50 $682.20 $682.20
BNI $482.70
Subtask 8n DS $199.50 $2,179.44 $2,179.44
VDA $1,979.94
DS $199.50 $2,179.44 $2,179.44
VDA $1,979.94
Subtask 8p DS $199.50 $2,179.44 $2,179.44
VDA $1,979.94
DS $199.50 $2,179.44 $2,179.44
VDA $1,979.94
Architectural Interim Site Visit 2
Architectural Substantial Site Visit
Review of Elevator Shop Drawings
Limited Construction Admin. Services
Subtask 8a Architectural Interim Site Visit 1
Subtask 8b
Subtask 8d
Subtask 7a
Subtask 7b
Subtask 8c
Architectural Final Completion Site Visit Electrical Interim Site Visit 1
Mechanical/Plumbing Interim Site Visit 1
Structural Engineer Interim Site Visit 1
Elevator Consultant Interim Site Visit 1 Elevator Consultant Interim Site Visit 2
Subtask 8f
Subtask 8l
Subtask 8e
Architectural Interim Site Visit 3
Subtask 8g Electrical Interim Site Visit 2
Mechanical/Plumbing Interim Site Visit 2 Electrical Substantial Site Visit Mechanical/Plumbing Substantial Site Visit
Subtask 8m Structural Engineer Interim Site Visit 2
Elevator Consultant Substantial Site Visit
Subtask 8q Elevator Consultant Final Site Visit
Subtask 8o
Summary Working
Days From
Subtask 1a 25 From date of execution of agreement
Subtask 1b 4 From date of meeting
Subtask 1c 10 From date of Schematic Design Review Meeting
Subtask 2a 25 From selection of Schematic Design & Meetings w/ Permitting Departments n/a
25 From selection of Schematic Design & Meetings w/ Permitting Departments
10 From selection of Schematic Design & Meetings w/ Permitting Departments
35 From acceptances of Subtasks 2b and 2c
40 From acceptances of Subtasks 2b and 2c
4 From date of meeting
10 From date of 60% CD review meeting
35 From acceptance of Subtasks 3a, 3b, and
3d 35 From acceptance of Subtasks 3a, 3b, and
3d 4 From date of meeting
15 From acceptance of Subtasks 4a, 4b, and
4c 10 From receipt of all of the comments
7 From acceptance of Subtask 5a & written direction to proceed from BDC
7 From acceptance of Subtask 5a & written direction to proceed from BDC
10 From receipt of RFIs
4 From date of meeting
10 From receipt of Bid documents
4 From date of meeting
10 From receipt of shop drawings
10 From receipt of RFIsSubtask 7b Limited Construction Admin. Services
Subtask 6f Assist Contractor in Evaluation of Bids from Elevator Subs
Subtask 6g Attend Pre-Const.
meeting on site
Subtask 7a Review of Elevator Shop Drawings
Subtask 6c Final Submission to
FDHR
Subtask 6d Bidding Services
Subtask 6e Attend Pre-Bid meeting on site
Subtask 5a Preparation of 100% Construction Documents
Subtask 6a Permitting Services
Subtask 6b Submission to State Fire Marshall
Subtask 4a Preparation of 90% Construction Documents
Subtask 4b Final Elevator Specifications
Subtask 4c 90% CDs Review Meeting
Subtask 3b First Draft of Elevator Specifications
Subtask 3c 60% CDs Review Meeting
Subtask 3d Preliminary Submission to FDHR
Subtask 2b Pre-Design Structural Site Visit
Subtask 2c Preliminary Meeting w/
FDHR
Subtask 3a Preparation of 60% Const. Documents
Schematic Design
Schematic Design Review Meeting Prelim. Meetings w/ Permitting Departs.
Materials Testing
Subtask 2a Optional
Materials Testing - VDA and DS attendance
5 From date of visit
5 From date of visit
5 From date of visit
6 From date of visit
5 From date of visit
5 From date of visit
5 From date of visit
Subtask 8h 5 From date of visit
Subtask 8i 5 From date of visit
Subtask 8j 5 From date of visit
Subtask 8k 5 From date of visit
5 From date of visit
5 From date of visit
Subtask 8n 10 From date of visit
10 From date of visit
Subtask 8p 10 From date of visit
10 From date of visit
Elevator Consultant Interim Site Visit 1
Subtask 8o Elevator Consultant Interim Site Visit 2 Elevator Consultant Substantial Site Visit
Subtask 8q Elevator Consultant Final Site Visit
Electrical Substantial Site Visit Mechanical/Plumbing Substantial Site Visit
Subtask 8l Structural Engineer Interim Site Visit 1
Subtask 8m Structural Engineer Interim Site Visit 2
Subtask 8f Electrical Interim Site Visit 1
Subtask 8g Electrical Interim Site Visit 2 Mechanical/Plumbing Interim Site Visit 1 Mechanical/Plumbing Interim Site Visit 2
Subtask 8c Architectural Interim Site Visit 3
Subtask 8d Architectural Substantial Site Visit
Subtask 8e Architectural Final Completion Site Visit
Subtask 8a Architectural Interim Site Visit 1
Subtask 8b Architectural Interim Site Visit 2