CN-370000-CN212-T22.pdf

PDF 877 KB Posted

Attached to
Master Agreement FL|CN212|aec15af757aa90b3e69d3dac479b0889
Contract number
CN212
Issued by
Florida

About this file

This document is a Task Assignment Notification Form for a project under FDEP Contract No. CN212 involving the Florida Department of Environmental Protection (FDEP), Dodstone Group Architects as the primary consultant, and multiple subconsultants including Facility Solutions & Management, Applied Research & Design, Bliss & Niytray, and VDA (Vertical Design Associates). The project concerns design and permitting services for elevator repairs and modifications at Edward Ball Wakulla Springs State Park Lodge in Wakulla County, Florida. The contract execution date is August 5, 2022, with a completion date of August 30, 2024.

The total task amount is $128,656.02 as a fixed price contract. Services include schematic design development, preliminary and final structural evaluations, hazardous materials testing, construction document preparation at 60%, 90%, and 100% completion levels, elevator specifications, permitting services including submissions to the State Fire Marshal and Florida Division of Historical Resources, bidding support, pre-construction and construction administration services with multiple site visits by architects and engineers. The contract specifies hourly rates for various professional positions ranging from $34.02 to $300.00 per hour, with deliverables consisting primarily of PDF files of drawings, specifications, meeting minutes, and reports. Work is funded through FDEP using CSFRF grant funding. Optional services related to materials testing and VDA attendance total an additional $1,531.96 if requested. The funding code indicates allocation through Project 6A011C with specific FLAIR coding for state accounting purposes.

View the file

Other files

File Type Posted
CN-370000-CN212-AM1.pdf PDF
CN-370000-CN212-CMC3.pdf PDF
CN-370000-CN212-T11CO1.pdf PDF
CN-370000-CN212-T11CO2.pdf PDF
CN-370000-CN212-T12.pdf PDF
CN-370000-CN212-T13.pdf PDF
CN-370000-CN212-T14CO1.pdf PDF
CN-370000-CN212-T16.pdf PDF
CN-370000-CN212-T18CO2.pdf PDF
CN-370000-CN212-T18CO3.pdf PDF
CN-370000-CN212-T19CO1.pdf PDF
CN-370000-CN212-T21.pdf PDF
CN-370000-CN212-T23CO3.pdf PDF
CN-370000-CN212-T5.pdf PDF
CN-370000-CN212-T7.pdf PDF
CN-370000-CN212-T7CO1.pdf PDF
CN-370000-CN212-TA15.pdf PDF
CN-370000-CN212-TA3.pdf PDF
CN-370000-CN212-TA8 CO4.pdf PDF
CN-370000-CN212-CMC1.pdf PDF
CN-370000-CN212-CMC2.pdf PDF
CN-370000-CN212-T10.pdf PDF
CN-370000-CN212-T11.pdf PDF
CN-370000-CN212-T15CO3.pdf PDF
CN-370000-CN212-T17.pdf PDF
CN-370000-CN212-T18.pdf PDF
CN-370000-CN212-T18CO1.pdf PDF
CN-370000-CN212-T23CO2.pdf PDF
CN-370000-CN212-T8CO2.pdf PDF
CN-370000-CN212-T9.pdf PDF
CN-370000-CN212-T9CO1.pdf PDF
CN-370000-CN212-TA05C01.pdf PDF
CN-370000-CN212-TA1.pdf PDF
CN-370000-CN212-TA14.pdf PDF
CN-370000-CN212.pdf PDF
PC-370000-CN212.pdf PDF
CN-370000-CN212-T15CO1.pdf PDF
CN-370000-CN212-T15CO2.pdf PDF
CN-370000-CN212-T18CO4.pdf PDF
CN-370000-CN212-T1CO2.pdf PDF
CN-370000-CN212-T22CO1.pdf PDF
CN-370000-CN212-T23CO4.pdf PDF
CN-370000-CN212-T24CO3.pdf PDF
CN-370000-CN212-T25.pdf PDF
CN-370000-CN212-T4.pdf PDF
CN-370000-CN212-T8.pdf PDF
CN-370000-CN212-T8CO3.pdf PDF
CN-370000-CN212-T11CO3.pdf PDF
CN-370000-CN212-T14CO2.pdf PDF
CN-370000-CN212-T14CO3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN212 22 FDEP 6A011C

Edward Ball Wakulla Springs State Park Lodge Elevator Modifications

Dodstone Group Architects

Joel Dodstone 850-656-7326 jdodson@dodstone.com

Ralph Perkins 850-245-2460 ralph.perkins@floridadep.gov

Design and permitting services for the repairs and modifications of an elevator at the above location. Please note the attached Revised Proposal dated 8/4/2022.

Edward Straight

Upon Execution $ 128,656.02 08/30/2024

$ 128,656.02

Diane Langston Diane Langston Digitally signed by Diane Langston Date: 2022.08.05 14:41:30 -04'00'

Edward Straight Edward Straight Digitally signed by Edward Straight Date: 2022.08.05 13:33:19 -04'00' 05 August 2022

Ralph M Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2022.08.08 11:19:30 -04'00'

Joel Dodson Jodie Dodson Digitally signed by Jodie Dodson Date: 2022.08.09 15:41:20 -04'00'

Bryan J Bradner Bryan Bradner Digitally signed by Bryan Bradner Date: 2022.08.22 16:28:51 -04'00'

6A011C CSFRF 37501011204 085154/22 000286 U3200 131500 AD $ 128,656.02

$ 128,656.02

Dodstone Architects | 3011-1 Powell Road | Tallahassee, FL 32308 | 850.656.7326 | #AR0015211

Subtask 1a Schematic Design

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 18 $2,394.00 Graduate Architect $88.00 24 $2,112.00 CADD Operator $60.00 12 $720.00

$5,310.00

Facility Solutions & Management Principle Consultant $130.64 1 $130.64

Project Engineer $110.15 5 $550.75 Admin $34.02 1 $34.02

$715.41

CN212 TA22

Applied Research & Design Professional Engineer $134.00

$268.00 $268.00

Bliss & Niytray Principal $178.77 1 $178.77 Project Engineer $119.18 3 $357.54

$536.31

VDA Principal/Director $300.00 2 $600.00

VP $275.01 10 $2,750.10

$3,350.10 Subtask 1a Schematic Design $10,179.82

Subtask 1b

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 3 $399.00

$483.00 Subtask 1b $483.00

Schematic Design Review Meeting

Schematic Design Review Meeting

Subtask 1c

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 10 $1,330.00 Graduate Architect $88.00 4 $352.00 CADD Operator $60.00 3 $180.00

$1,946.00

Facility Solutions & Management Principle Consultant $130.64 3 $391.92

Admin $34.02 1 $34.02 $425.94

VDA Principal/Director $300.00 0.5 $150.00

VP $275.01 2 $550.02

$700.02 Subtask 1c $3,071.96

Prelim. Meetings w/ Permitting Departs.

Prelim. Meetings w/ Permitting Departs.

Subtask 2a

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 2 $266.00

$350.00

Materials Testing

Subtask 2a Optional

Price Cost

Dodstone Architects Principal $168.00 0 $0.00 Registered Architect $133.00 4 $532.00

$532.00

VDA Principal/Director $300.00 0 $0.00 PM/Consultant $249.99 4 $999.96

$999.96 Subtask 2a Optional $1,531.96

Materials Testing - VDA and DS attendance

Materials Testing - VDA and DS attendance

Nova Staff Engineer $78.03 26 $2,028.78 Principal Engineer $274.55 6 $1,647.30 Secretary/Clerical/CADD $58.00 6 $348.00

Mobilization Fee $500.00 1 $500.00 Brick extraction tools $300.00 1 $300.00 Brick & asbestos testing $4,400.00 1 $4,400.00 ACM Sample Analysis $12.00 30 $360.00 XRF Equipment Charge $200.00 1 $200.00 ACM Tools and Supplies $55.00 1 $55.00

$9,839.08 Subtask 2a $10,189.08Materials Testing

Subtask 2b

Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 4 $532.00

$616.00

Bliss & Niytray Principal $178.77 16 $2,860.32 Engineer $83.43 16 $1,334.88

$4,195.20

Subtask 2b Pre-Design Structural Site Visit $4,811.20

Pre-Design Structural Site Visit

Subtask 2c

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 4 $532.00

$616.00

VDA Principal/Director $300.00 0.5 $150.00

VP $275.01 2 $550.02

$700.02 Subtask 2c $1,316.02Preliminary Meeting w/ FDHR

Preliminary Meeting w/ FDHR

Subtask 3a

Price Cost

Dodstone Architects Principal $168.00 2 $336.00 Registered Architect $133.00 50 $6,650.00 Graduate Architect $88.00 30 $2,640.00 CADD Operator $60.00 35 $2,100.00

$11,726.00

Facility Solutions & Management Principle Consultant $130.64 3.25 $424.58

Project Engineer $110.15 9.5 $1,046.43 Staff Engineer $80.38 5 $401.90 CADD Technician $49.23 16 $787.68 Admin $34.02 0.5 $17.01

$2,677.60

Applied Research & Design Professional Engineer $134.00

13.5 $1,809.00

CAD/Designer $59.00 15 $885.00 $2,694.00

Bliss & Niytray Principal $178.77 8 $1,430.16 Engineer $83.43 40 $3,337.20

$4,767.36

Subtask 3a $21,864.96Preparation of 60% Const. Documents

Preparation of 60% Const. Documents

Subtask 3b

Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 5 $665.00

$749.00

VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 8 $1,999.92 Clerical $90.00 3 $270.00

$2,569.92 Subtask 3b $3,318.92

First Draft of Elevator Specifications

First Draft of Elevator Specifications

Subtask 3c

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 4 $532.00

$616.00 Subtask 3c $616.00

60% CDs Review Meeting

60% CDs Review Meeting

Subtask 3d

Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 6 $798.00 Graduate Architect $88.00 3 $264.00

$1,146.00 Subtask 3d $1,146.00Preliminary Submission to FDHR

Preliminary Submission to FDHR

Subtask 4a

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 2 $336.00 Registered Architect $133.00 35 $4,655.00 Graduate Architect $88.00 25 $2,200.00 CADD Operator $60.00 30 $1,800.00

$8,991.00

Facility Solutions & Management Principle Consultant $130.64 2.5 $326.60

Project Engineer $110.15 7.5 $826.13 Staff Engineer $80.38 5 $401.90 CADD Technician $49.23 16 $787.68 Admin $34.02 0.5 $17.01

$2,359.32

Applied Research & Design Professional Engineer $134.00

$1,340.00

CAD/Designer $59.00 16 $944.00 $2,284.00

Bliss & Niytray Principal $178.77 7 $1,251.39 Engineer $83.43 37 $3,086.91

$4,338.30 Subtask 4a $17,972.62Preparation of 90% Construction Documents

Preparation of 90% Construction Documents

Subtask 4b

Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 2.5 $332.50

$416.50

VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 4 $999.96 Clerical $90.00 2 $180.00

$1,479.96 Subtask 4b $1,896.46

Final Elevator Specifications

Final Elevator Specifications

Subtask 4c

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 4 $532.00

$616.00 Subtask 4c $616.00

90% CDs Review Meeting

90% CDs Review Meeting

Subtask 5a

Price Cost

Dodstone Architects Principal $168.00 2 $336.00 Registered Architect $133.00 10 $1,330.00 Graduate Architect $88.00 3 $264.00 CADD Operator $60.00 5 $300.00

$2,230.00

Facility Solutions & Management Principle Consultant $130.64 3 $391.92

Project Engineer $110.15 4.5 $495.68 Staff Engineer $80.38 2 $160.76 CADD Technician $49.23 4 $196.92 Admin $34.02 0.5 $17.01

$1,262.29

Applied Research & Design Professional Engineer $134.00

$134.00

CAD/Designer $59.00 2 $118.00 $252.00

Bliss & Niytray Principal $178.77 1 $178.77 Engineer $83.43 3 $250.29

$429.06 Subtask 5a $4,173.35Preparation of 100% Construction Documents

Preparation of 100% Construction Documents

Subtask 6a Permitting Services

Price Cost

Dodstone Architects Principal $168.00 1 $168.00 Registered Architect $133.00 6 $798.00 Graduate Architect $88.00 3 $264.00 CADD Operator $60.00 2 $120.00

$1,350.00

Facility Solutions & Management Principle Consultant $130.64 1.25 $163.30

Project Engineer $110.15 3.5 $385.53 CADD Technician $49.23 1 $49.23 Admin $34.02 0.5 $17.01

$615.07

Applied Research & Design Professional Engineer $134.00

$134.00

CAD/Designer $59.00 0 $0.00 $134.00

Bliss & Niytray Principal $178.77 2 $357.54 $357.54

Subtask 6a Permitting Services $2,456.61

Subtask 6b Submission to State Fire Marshall

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 3 $399.00 Graduate Architect $88.00 1 $88.00 CADD Operator $60.00 2 $120.00

$691.00

Subtask 6b Submission to State Fire Marshall $691.00

Subtask 6c

Price Cost

Dodstone Architects Principal $168.00 1 $168.00 Registered Architect $133.00 6 $798.00 Graduate Architect $88.00 2 $176.00

$1,142.00 Subtask 6c $1,142.00

Final Submission to FDHR

Final Submission to FDHR

Subtask 6d Bidding Services

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 6 $798.00 Graduate Architect $88.00 5 $440.00 CADD Operator $60.00 2 $120.00

$1,442.00

Facility Solutions & Management Principle Consultant $130.64 1.25 $163.30

Admin $34.02 0.5 $17.01 $180.31

Applied Research & Design Professional Engineer $134.00

$134.00

CAD/Designer $59.00 0 $0.00 $134.00

Bliss & Niytray Principal $178.77 4 $715.08 $715.08

Subtask 6d Bidding Services $2,471.39

Subtask 6e

Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 5.5 $731.50

$815.50

VDA Principal/Director $300.00 0.5 $150.00 PM/Consultant $249.99 4 $999.96

$1,149.96 Subtask 6e $1,965.46

Attend Pre-Bid meeting on site

Attend Pre-Bid meeting on site

Subtask 6f

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 2 $266.00

$350.00

VDA Principal/Director $300.00 0.5 $150.00 PM/Consultant $249.99 4 $999.96 Clerical $90.00 2 $180.00

$1,329.96 Subtask 6f $1,679.96Assist Contractor in Evaluation of Bids from

Assist Contractor in Evaluation of Bids from Elevator Subs

Subtask 6g

Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 5.5 $731.50

$815.50

VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 4 $999.96 Clerical $90.00 1 $90.00

$1,389.96 Subtask 6g $2,205.46

Attend Pre-Const. meeting on site

Attend Pre-Const. meeting on site

Subtask 7a

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 8 $1,064.00

$1,148.00

VDA Principal/Director $300.00 0.5 $150.00 PM/Consultant $249.99 8 $1,999.92 Clerical $90.00 1 $90.00

$2,239.92 Subtask 7a $3,387.92

Review of Elevator Shop Drawings

Review of Elevator Shop Drawings

Subtask 7b

Price Cost

Dodstone Architects Principal $168.00 0.5 $84.00 Registered Architect $133.00 12 $1,596.00 Graduate Architect $88.00 5 $440.00 CADD Operator $60.00 6 $360.00

$2,480.00

Facility Solutions & Management Principle Consultant $130.64 0.25 $32.66

Project Engineer $110.15 2 $220.30

Staff Engineer $80.38

$723.42 Admin $34.02 0.5 $17.01

$993.39

Applied Research & Design Professional Engineer $134.00

4.5 $603.00

CAD/Designer $59.00 0 $0.00 $603.00

Bliss & Niytray Principal $178.77 2 $357.54 Engineer $83.43 8 $667.44

$1,024.98

VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 9 $2,249.91 Clerical $90.00 3 $270.00

$2,819.91

Subtask 7b Limited Construction Admin. Services $7,921.28

Limited Construction Admin. Services

Subtask 8a

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Registered Architect $133.00 6 $798.00 Subtask 8a $798.00

Architectural Interim Site Visit 1

Architectural Interim Site Visit 1

Subtask 8b

Price Cost

Dodstone Architects Registered Architect $133.00 6 $798.00 Subtask 8b $798.00Architectural Interim Site Visit 2

Architectural Interim Site Visit 2

Subtask 8c

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Registered Architect $133.00 6 $798.00 Subtask 8c $798.00

Architectural Interim Site Visit 3

Architectural Interim Site Visit 3

Subtask 8d

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Registered Architect $133.00 7 $931.00 Subtask 8d $931.00Architectural Substantial Site Visit

Architectural Substantial Site Visit

Subtask 8e

Price Cost

Dodstone Architects Registered Architect $133.00 6 $798.00 Subtask 8e $798.00Architectural Final Completion Site Visit

Architectural Final Completion Site Visit

Subtask 8f

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

Applied Research & Design Professional Engineer $134.00

$402.00 $402.00

Subtask 8f $601.50

Electrical Interim Site Visit 1

Electrical Interim Site Visit 1

Subtask 8g

Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

Applied Research & Design Professional Engineer $134.00

$402.00 $402.00

Subtask 8g $601.50

Electrical Interim Site Visit 2

Electrical Interim Site Visit 2

Subtask 8h

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

Facility Solutions & Management Principle Consultant $130.64 0.25 $32.66

Staff Engineer $80.38

$241.14 Admin $34.02 0.5 $17.01

$290.81

Subtask 8h $490.31

Mechanical/Plumbing Interim Site Visit 1

Mechanical/Plumbing Interim Site Visit 1

Subtask 8i

Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

Facility Solutions & Management Principle Consultant $130.64 0.25 $32.66

Staff Engineer $80.38

$241.14 Admin $34.02 0.5 $17.01

$290.81

Subtask 8i $490.31

Mechanical/Plumbing Interim Site Visit 2

Mechanical/Plumbing Interim Site Visit 2

Subtask 8j

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

Applied Research & Design Professional Engineer $134.00

3.5 $469.00 $469.00

Subtask 8j $668.50Electrical Substantial Site Visit

Electrical Substantial Site Visit

Subtask 8k

Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

Facility Solutions & Management Principle Consultant $130.64 0.25 $32.66

Staff Engineer $80.38

$241.14 Admin $34.02 0.5 $17.01

$290.81

Subtask 8k $490.31

Mechanical/Plumbing Substantial Site Visit

Mechanical/Plumbing Substantial Site Visit

Subtask 8l

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

Bliss & Niytray Principal $178.77 0.5 $89.39 Engineer $83.43 4 $333.72 Clerical $59.59 1 $59.59

$482.70

Subtask 8l $682.20

Structural Engineer Interim Site Visit 1

Structural Engineer Interim Site Visit 1

Subtask 8m

Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

Bliss & Niytray Principal $178.77 0.5 $89.39 Engineer $83.43 4 $333.72 Clerical $59.59 1 $59.59

$482.70

Subtask 8m $682.20Structural Engineer Interim Site Visit 2

Structural Engineer Interim Site Visit 2

Subtask 8n

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 6 $1,499.94 Clerical $90.00 2 $180.00

$1,979.94

Subtask 8n $2,179.44

Elevator Consultant Interim Site Visit 1

Elevator Consultant Interim Site Visit 1

Subtask 8o

Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 6 $1,499.94 Clerical $90.00 2 $180.00

$1,979.94

Subtask 8o $2,179.44

Elevator Consultant Interim Site Visit 2

Elevator Consultant Interim Site Visit 2

Subtask 8p

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 6 $1,499.94 Clerical $90.00 2 $180.00

$1,979.94

Subtask 8p $2,179.44

Elevator Consultant Substantial Site Visit

Elevator Consultant Substantial Site Visit

Subtask 8q

Price Cost

Dodstone Architects Registered Architect $133.00 1.5 $199.50 $199.50

VDA Principal/Director $300.00 1 $300.00 PM/Consultant $249.99 6 $1,499.94 Clerical $90.00 2 $180.00

$1,979.94

Subtask 8q $2,179.44Elevator Consultant Final Site Visit

Elevator Consultant Final Site Visit

Summary Provider Base Service Additional

Service Subtotal Reimb. Total

Subtask 1a DS $5,310.00 $10,179.82 $10,179.82

FSM $715.41

ARD $268.00

BNI $536.31

VDA $3,350.10

Subtask 1b DS $483.00 $483.00 $483.00

Subtask 1c DS $1,946.00 $3,071.96 $3,071.96

FSM $425.94

VDA $700.02

Subtask 2a DS $350.00 $10,189.08 $10,189.08 Nova $9,839.08

DS $532.00 $1,531.96 $1,531.96

VDA $999.96

DS $616.00 $4,811.20 $4,811.20

BNI $4,195.20

DS $616.00 $1,316.02 $1,316.02

$700.02

DS $9,066.00 $2,660.00 $21,864.96 $21,864.96

FSM $2,677.60

ARD $2,694.00

BNI $4,767.36

DS $749.00 $3,318.92 $3,318.92

VDA 2569.92

DS $616.00 $616.00 $616.00

DS $1,146.00 $1,146.00 $1,146.00

DS $7,395.00 $1,596.00 $17,972.62 $17,972.62

FSM $2,359.32

ARD $2,284.00

BNI $4,338.30

DS $416.50 $1,896.46 $1,896.46

VDA $1,479.96

DS $616.00 $616.00 $616.00

DS $2,230.00 $4,173.35 $4,173.35

FSM $1,262.29

ARD $252.00

BNI $429.06

DS $1,350.00 $2,456.61 $2,456.61

FSM $615.07

ARD $134.00

BNI $357.54

DS $691.00 $691.00 $4,000.00 $4,691.00

DS $1,142.00 $1,142.00 $1,142.00

DS $1,442.00 $2,471.39 $2,471.39

FSM $180.31

ARD $134.00

BNI $715.08

DS $815.50 $1,965.46 $1,965.46

VDA $1,149.96

DS $350.00 $1,679.96 $1,679.96

VDA $1,329.96

DS $815.50 $2,205.46 $2,205.46

VDA $1,389.96

Materials Testing - VDA and DS attendance

Permitting Services

Attend Pre-Const.

meeting on site

Subtask 6f

Subtask 3b First Draft of Elevator Specifications

Subtask 3c

Subtask 3d

Subtask 4a

Subtask 2b

Subtask 2c

Subtask 3a Preparation of 60% Const. Documents

Pre-Design Structural Site Visit

Schematic Design

Subtask 6g

Preliminary Submission to FDHR

Prelim. Meetings w/ Permitting Departs.

Materials Testing

Preliminary Meeting w/

FDHR

Final Elevator Specifications

Subtask 6c

Subtask 2a Optional

Subtask 6a

Schematic Design Review Meeting

60% CDs Review Meeting

Preparation of 90% Construction Documents

90% CDs Review Meeting

Final Submission to

FDHR

Assist Contractor in Evaluation of Bids from Elevator Subs

Subtask 5a Preparation of 100% Construction Documents

Subtask 6b Submission to State Fire Marshall

Subtask 6d

Bidding Services

Subtask 6e Attend Pre-Bid meeting on site

Subtask 4c

Subtask 4b

DS $1,148.00 $3,387.92 $3,387.92

VDA $2,239.92

DS $2,480.00 $7,921.28 $7,921.28

FSM $993.39

ARD $603.00

BNI $1,024.98

VDA $2,819.91

DS $798.00 $798.00 $798.00

DS $798.00 $798.00 $798.00

DS $798.00 $798.00 $798.00

DS $931.00 $931.00 $931.00

DS $798.00 $798.00 $798.00

DS $199.50 $601.50 $601.50

ARD $402.00

DS $199.50 $601.50 $601.50

ARD $402.00

Subtask 8h DS $199.50 $490.31 $490.31

FSM $290.81

Subtask 8i DS $199.50 $490.31 $490.31

FSM $290.81

Subtask 8j DS $199.50 $668.50 $668.50

ARD $469.00

Subtask 8k DS $199.50 $490.31 $490.31

FSM $290.81

DS $199.50 $682.20 $682.20

BNI $482.70

DS $199.50 $682.20 $682.20

BNI $482.70

Subtask 8n DS $199.50 $2,179.44 $2,179.44

VDA $1,979.94

DS $199.50 $2,179.44 $2,179.44

VDA $1,979.94

Subtask 8p DS $199.50 $2,179.44 $2,179.44

VDA $1,979.94

DS $199.50 $2,179.44 $2,179.44

VDA $1,979.94

Architectural Interim Site Visit 2

Architectural Substantial Site Visit

Review of Elevator Shop Drawings

Limited Construction Admin. Services

Subtask 8a Architectural Interim Site Visit 1

Subtask 8b

Subtask 8d

Subtask 7a

Subtask 7b

Subtask 8c

Architectural Final Completion Site Visit Electrical Interim Site Visit 1

Mechanical/Plumbing Interim Site Visit 1

Structural Engineer Interim Site Visit 1

Elevator Consultant Interim Site Visit 1 Elevator Consultant Interim Site Visit 2

Subtask 8f

Subtask 8l

Subtask 8e

Architectural Interim Site Visit 3

Subtask 8g Electrical Interim Site Visit 2

Mechanical/Plumbing Interim Site Visit 2 Electrical Substantial Site Visit Mechanical/Plumbing Substantial Site Visit

Subtask 8m Structural Engineer Interim Site Visit 2

Elevator Consultant Substantial Site Visit

Subtask 8q Elevator Consultant Final Site Visit

Subtask 8o

Summary Working

Days From

Subtask 1a 25 From date of execution of agreement

Subtask 1b 4 From date of meeting

Subtask 1c 10 From date of Schematic Design Review Meeting

Subtask 2a 25 From selection of Schematic Design & Meetings w/ Permitting Departments n/a

25 From selection of Schematic Design & Meetings w/ Permitting Departments

10 From selection of Schematic Design & Meetings w/ Permitting Departments

35 From acceptances of Subtasks 2b and 2c

40 From acceptances of Subtasks 2b and 2c

4 From date of meeting

10 From date of 60% CD review meeting

35 From acceptance of Subtasks 3a, 3b, and

3d 35 From acceptance of Subtasks 3a, 3b, and

3d 4 From date of meeting

15 From acceptance of Subtasks 4a, 4b, and

4c 10 From receipt of all of the comments

7 From acceptance of Subtask 5a & written direction to proceed from BDC

7 From acceptance of Subtask 5a & written direction to proceed from BDC

10 From receipt of RFIs

4 From date of meeting

10 From receipt of Bid documents

4 From date of meeting

10 From receipt of shop drawings

10 From receipt of RFIsSubtask 7b Limited Construction Admin. Services

Subtask 6f Assist Contractor in Evaluation of Bids from Elevator Subs

Subtask 6g Attend Pre-Const.

meeting on site

Subtask 7a Review of Elevator Shop Drawings

Subtask 6c Final Submission to

FDHR

Subtask 6d Bidding Services

Subtask 6e Attend Pre-Bid meeting on site

Subtask 5a Preparation of 100% Construction Documents

Subtask 6a Permitting Services

Subtask 6b Submission to State Fire Marshall

Subtask 4a Preparation of 90% Construction Documents

Subtask 4b Final Elevator Specifications

Subtask 4c 90% CDs Review Meeting

Subtask 3b First Draft of Elevator Specifications

Subtask 3c 60% CDs Review Meeting

Subtask 3d Preliminary Submission to FDHR

Subtask 2b Pre-Design Structural Site Visit

Subtask 2c Preliminary Meeting w/

FDHR

Subtask 3a Preparation of 60% Const. Documents

Schematic Design

Schematic Design Review Meeting Prelim. Meetings w/ Permitting Departs.

Materials Testing

Subtask 2a Optional

Materials Testing - VDA and DS attendance

5 From date of visit

5 From date of visit

5 From date of visit

6 From date of visit

5 From date of visit

5 From date of visit

5 From date of visit

Subtask 8h 5 From date of visit

Subtask 8i 5 From date of visit

Subtask 8j 5 From date of visit

Subtask 8k 5 From date of visit

5 From date of visit

5 From date of visit

Subtask 8n 10 From date of visit

10 From date of visit

Subtask 8p 10 From date of visit

10 From date of visit

Elevator Consultant Interim Site Visit 1

Subtask 8o Elevator Consultant Interim Site Visit 2 Elevator Consultant Substantial Site Visit

Subtask 8q Elevator Consultant Final Site Visit

Electrical Substantial Site Visit Mechanical/Plumbing Substantial Site Visit

Subtask 8l Structural Engineer Interim Site Visit 1

Subtask 8m Structural Engineer Interim Site Visit 2

Subtask 8f Electrical Interim Site Visit 1

Subtask 8g Electrical Interim Site Visit 2 Mechanical/Plumbing Interim Site Visit 1 Mechanical/Plumbing Interim Site Visit 2

Subtask 8c Architectural Interim Site Visit 3

Subtask 8d Architectural Substantial Site Visit

Subtask 8e Architectural Final Completion Site Visit

Subtask 8a Architectural Interim Site Visit 1

Subtask 8b Architectural Interim Site Visit 2