Attachment 5 - AF FORM 3052.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Install Backflow Preventers Federal contract opportunity
Solicitation number
FA487720R0032
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a construction cost estimate breakdown template for a project at Davis-Monthan Air Force Base in Arizona. The template includes line items for general conditions, architectural, civil, structural, mechanical, plumbing, and electrical work. It requests information on the contractor address, proposed total contract price, purchase request and project numbers, and work location. For each line item, it includes spaces for material and labor costs, quantities, unit rates, manhours, and total costs. It also includes line totals and calculations for overhead, profit, taxes, bonds, and the total project price.

The related federal contract opportunity is a solicitation to install approved lead free reduced pressure backflow preventers and upstream wye strainers at multiple facilities for the Air Combat Command of the Department of the Air Force. The statement of work for the project is dated December 9, 2019.

View the file

Other files for this federal contract opportunity

Other files attached to Install Backflow Preventers, newest first.
File Type Posted
FA487720R00320003 SF 30.pdf PDF
1998-03 Asbestos Survey.pdf PDF
1998-09 Asbestos Survey.pdf PDF
1997-07 Asbestos Survey.pdf PDF
Scanned Map Survey Bldg 03208.PDF PDF
1997-01 Asbestos Survey.pdf PDF
1999-12 Asbestos Survey.pdf PDF
1988-02 Asbestos Survey.pdf PDF
1997-08 Asbestos Survey.pdf PDF
2002-05 Asbestos Survey.pdf PDF
1999-11 Asbestos Survey.pdf PDF
1999-06 Asbestos Survey.pdf PDF
1995-10 Asbestos Survey.pdf PDF
Attachment 9 - Priority Recommendations.pdf PDF
2001-10 Asbestos Survey.pdf PDF
Attachment 7 - Summary of Work (dated 25 June).pdf PDF
2012-02 Asbestos Shipment.pdf PDF
Attachement 6 - RFI Answers.pdf PDF
2005-03 Asbestos Survey.pdf PDF
1999-05 Asbestos Survey.pdf PDF
1996-01 Asbestos Survey.pdf PDF
2000-05 Asbestos Survey.pdf PDF
1992-10 Asbestos Survey.pdf PDF
1996-06 Asbestos Survey.pdf PDF
2016-11 Asbestos Survey.pdf PDF
1997-09 Asbestos Survey.pdf PDF
Attachment 8 - DMAFB Design Compatibility Guidelines 2017.pdf PDF
FA487720R00320002 SF 30.pdf PDF
FA487720R00320001 Solicitation Amendment.pdf PDF
Solicitation - FA487720R0032 (1).pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 4 - Template of Contractor EAL.xls XLS spreadsheet
Attachment 3 - WD AZ20190032.pdf PDF
Attachment 2 - Design Requirements.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ktr's Blank

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1SUBTOTAL GENERAL CONDITIONS0000
2SUBTOTAL ARCHITECTURAL0000
3SUBTOTAL CIVIL
4SUBTOTAL STRUCTURAL
5SUBTOTAL MECHANICAL
6SUBTOTAL PLUMBING
7SUBTOTAL ELECTRICAL
LINE TOTALS
OVERHEAD (15%)
SUBTOTAL
PROFIT (_%)
SUBTOTAL
TAX (5.6% of 65%)
BOND (_%)
TOTAL PROJECT PRICE
DATE:FIRM NAME:
TITLE:BY:
GENERAL CONDITIONS
1Engineering Design
2Shop Drawings/Submittals
3Builder's Insurance
4Permits
5Project Manager
6Superintendent
7Small Tools
8Scheduling
9Construction Fence
10Project Sign
11Dumpsters
12Portable Toilets
13Safety Items
14Cleanup (after job completion)
15Cleanup (final floor area)
16Site Survey
17
18
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL GENERAL CONDITIONS
ARCHITECTURAL
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL ARCHITECTURAL
CIVIL
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL CIVIL
STRUCTURAL
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL STRUCTURAL
MECHANICAL
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL MECHANICAL
PLUMBING
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
PLUMBING
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
PLUMBING
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE

SUBTOTAL PREVIOUS PAGE(S)

SUBTOTAL ALL PAGES
LABOR BURDEN (_%)
SUBTOTAL PLUMBING
ELECTRICAL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
SUBTOTAL THIS PAGE
ELECTRICAL
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE

SUBTOTAL PREVIOUS PAGE(S)

SUBTOTAL ALL PAGES
LABOR BURDEN (_%)

SUBTOTAL ELECTRICAL

AF Form 3052 (Computer Generated)&"Univers (WN)"&8
&10*FOR OFFICIAL USE ONLY*&"Univers (WN)"&8

&10PAGE &P OF &N

File details come from the government source that posted it. Updated .