This document contains a construction cost estimate breakdown template for a project at Davis-Monthan Air Force Base in Arizona. The template includes line items for general conditions, architectural, civil, structural, mechanical, plumbing, and electrical work. It requests information on the contractor address, proposed total contract price, purchase request and project numbers, and work location. For each line item, it includes spaces for material and labor costs, quantities, unit rates, manhours, and total costs. It also includes line totals and calculations for overhead, profit, taxes, bonds, and the total project price.

The related federal contract opportunity is a solicitation to install approved lead free reduced pressure backflow preventers and upstream wye strainers at multiple facilities for the Air Combat Command of the Department of the Air Force. The statement of work for the project is dated December 9, 2019.

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
FA487720R00320003 SF 30.pdf PDF
1998-09 Asbestos Survey.pdf PDF
1997-07 Asbestos Survey.pdf PDF
2001-10 Asbestos Survey.pdf PDF
2000-05 Asbestos Survey.pdf PDF
1999-05 Asbestos Survey.pdf PDF
1996-01 Asbestos Survey.pdf PDF
Attachment 8 - DMAFB Design Compatibility Guidelines 2017.pdf PDF
1996-06 Asbestos Survey.pdf PDF
1992-10 Asbestos Survey.pdf PDF
1997-01 Asbestos Survey.pdf PDF
2002-05 Asbestos Survey.pdf PDF
1995-10 Asbestos Survey.pdf PDF
Scanned Map Survey Bldg 03208.PDF PDF
2016-11 Asbestos Survey.pdf PDF
1997-08 Asbestos Survey.pdf PDF
1998-03 Asbestos Survey.pdf PDF
FA487720R00320002 SF 30.pdf PDF
1997-09 Asbestos Survey.pdf PDF
1999-12 Asbestos Survey.pdf PDF
1999-06 Asbestos Survey.pdf PDF
1999-11 Asbestos Survey.pdf PDF
1988-02 Asbestos Survey.pdf PDF
2005-03 Asbestos Survey.pdf PDF
Attachement 6 - RFI Answers.pdf PDF
2012-02 Asbestos Shipment.pdf PDF
Attachment 9 - Priority Recommendations.pdf PDF
Attachment 7 - Summary of Work (dated 25 June).pdf PDF
FA487720R00320001 Solicitation Amendment.pdf PDF
Solicitation - FA487720R0032 (1).pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 4 - Template of Contractor EAL.xls XLS spreadsheet
Attachment 2 - Design Requirements.pdf PDF
Attachment 3 - WD AZ20190032.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ktr's Blank

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1SUBTOTAL GENERAL CONDITIONS0000
2SUBTOTAL ARCHITECTURAL0000
3SUBTOTAL CIVIL
4SUBTOTAL STRUCTURAL
5SUBTOTAL MECHANICAL
6SUBTOTAL PLUMBING
7SUBTOTAL ELECTRICAL
LINE TOTALS
OVERHEAD (15%)
SUBTOTAL
PROFIT (_%)
SUBTOTAL
TAX (5.6% of 65%)
BOND (_%)
TOTAL PROJECT PRICE
DATE:FIRM NAME:
TITLE:BY:
GENERAL CONDITIONS
1Engineering Design
2Shop Drawings/Submittals
3Builder's Insurance
4Permits
5Project Manager
6Superintendent
7Small Tools
8Scheduling
9Construction Fence
10Project Sign
11Dumpsters
12Portable Toilets
13Safety Items
14Cleanup (after job completion)
15Cleanup (final floor area)
16Site Survey
17
18
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL GENERAL CONDITIONS
ARCHITECTURAL
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL ARCHITECTURAL
CIVIL
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL CIVIL
STRUCTURAL
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL STRUCTURAL
MECHANICAL
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL MECHANICAL
PLUMBING
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
PLUMBING
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
PLUMBING
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE

SUBTOTAL PREVIOUS PAGE(S)

SUBTOTAL ALL PAGES
LABOR BURDEN (_%)
SUBTOTAL PLUMBING
ELECTRICAL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
SUBTOTAL THIS PAGE
ELECTRICAL
1
2
3
4
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE

SUBTOTAL PREVIOUS PAGE(S)

SUBTOTAL ALL PAGES
LABOR BURDEN (_%)

SUBTOTAL ELECTRICAL

AF Form 3052 (Computer Generated)&"Univers (WN)"&8
&10*FOR OFFICIAL USE ONLY*&"Univers (WN)"&8

&10PAGE &P OF &N

File details come from the government source that posted it. Updated .