Attachment 18 DD1354 _ FILLABLE Template _ AUG2013.pdf

PDF 93 KB Posted

Attached to
JBER MACC Federal contract opportunity
Solicitation number
FA500021R0023
Issued by
Department of the Air Force Pacific Air Forces

About this file

The document is a DD Form 1354 template for the transfer and acceptance of Department of Defense real property assets.

The form includes fields to capture details of the property transfer such as the transferring and receiving organizations, project information, asset descriptions including category codes, areas, costs and funding sources. It also provides for acceptance signatures and notes on construction deficiencies. Real property assets to be transferred would be listed individually with attributes populated for each item number. The purpose of the form is to formally document the transfer of military real property between departments or agencies.

The related federal contract opportunity is a Multiple Award Construction Contract for the Joint Base Elmendorf-Richardson in Alaska. The indefinite delivery/indefinite quantity contract will consist of multiple construction disciplines including repair, alteration and new construction of real property improvements across the base. The requirements will be further defined in individual task orders under the IDIQ contract. The solicitation was issued by the Department of the Air Force Pacific Air Forces.

View the file

Other files for this federal contract opportunity

Other files attached to JBER MACC, newest first.
File Type Posted
Attachment 29 QA CAO 7 Jul 21.xlsx XLSX spreadsheet
Solicitation Amendment FA500021R00230005 SF 30.pdf PDF
Solicitation Amendment FA500021R00230004 SF 30.pdf PDF
Attachment 28 SUPPLEMENTAL HAZMAT SPECS Seed Proj 20-5254.pdf PDF
Attachment 4 Seed Project FXSB 20-5254 Price Schedule.pdf PDF
Attachment 6 Seed Project FXSB 21-1058 Price Schedule.pdf PDF
Attachment 27 AF Form 66 Seed Proj FXSB 21-1058.pdf PDF
Attachment 29 QA CAO 24 Jun 21.xlsx XLSX spreadsheet
Attachment 17 Teaming consent 20201208.pdf PDF
Attachment 23 FOPR-Seed Project FXSB 20-5254.pdf PDF
Attachment 2 MACC SOW(CAO 25 June 21).pdf PDF
Attachment 5 Seed Proj FXSB 21-1058 SOW SPECS DRAWINGS.pdf PDF
Attachment 24 FOPR-Seed Project FXSB 21-1058.pdf PDF
Attachment 25 Seed Proj FXSB 20-5254 EXHIBITS 09-JUN-2021.pdf PDF
Attachment 26 AF Form 66 Seed Proj FXSB 20-5254.pdf PDF
Solicitation Amendment FA500021R00230001 SF 30.pdf PDF
Solicitation Amendment FA500021R00230003 SF 30.pdf PDF
Solicitation Amendment - FA500021R00230002.pdf PDF
Solicitation Amendment FA500021R00230002 (Summary of Changes).pdf PDF
Amendment 2 Attachment 1 - Site Visit Sign in Sheets FXSB 20-5254 and 21-1058.pdf PDF
Attachment 5 Seed Proj FXSB 21-1058 SOW SPECS DRAWINGS v2.pdf PDF
Solicitation Amendment No. 1_FA500021R00230001.pdf PDF
Attachment 1 Wage Determination.pdf PDF
Attachment 2 MACC SOW(CAO 3 May 21).pdf PDF
Attachment 8 Past Performance Tabs A-B 20210401.xlsx XLSX spreadsheet
Attachment 13 JBER Richardson IFS_PreFinal.pdf PDF
Attachment 15 JBER Hazardous Waste Management Plan - 7 May 2020.pdf PDF
Attachment 19 NAFI General Provisions and Clauses.pdf PDF
Attachment 4 Seed Project FXSB 20-5254 Price Schedule.pdf PDF
Attachment 14 JBER Richardson IFS_Pre-Final.pdf PDF
Attachment 17 Teaming consent 20201208.pdf PDF
Attachment 10 Financial Data Form 20201208.pdf PDF
Solicitation - FA500021R0023.pdf PDF
Attachment 3 Seed Proj FXSB 20-5254 SOW SPECS DRAWINGS.pdf PDF
Attachment 5 Seed Proj FXSB 21-1058 SOW SPECS DRAWINGS.pdf PDF
Attachment 6 Seed Project FXSB 21-1058 Price Schedule.pdf PDF
Attachment 7 PPQ 20210113.pdf PDF
Attachment 9 673ABW3 Dig Permit (2020 Version).pdf PDF
Attachment 11 Weather Data.pdf PDF
Attachment 12 JBER Telecommunications Installation Standards18DEC2018.pdf PDF
Attachment 16 Contractors Fire Safety Guide.pdf PDF
Attachment 20 ENV_PRECON Checklist_2020.pdf PDF
Attachment 21 REVISED JBER CAD GIS RECORD DRAWING DESIGN AND AS BUILT STANDARD Dec 2019.pdf PDF
Attachment 22 PPCL 20210519.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY Form Approved OMB No. 0704-0188

PAGE OF PAGES

1. FROM (Organization Name) 2. DATE PREPARED

(YYYYMMDD)

3. PROJECT/JOB

NUMBER

4. SERIAL NUMBER

7. CONTRACT

NUMBER(S)

5. TO (Organization - Installation Code and Name) 6. RPSUID/SITENAME/

INSTCODE/INSTNAME

8. TRANSACTION DETAILS

a. METHOD (X all that apply)

ACQUISITION BY CONSTRUCTION

TRANSFER BETWEEN SERVICES

CAPITAL IMPROVEMENT

INVENTORY ADJUSTMENT

PARTIAL ASSET

PLACED-IN-SERVICE

TOTAL ASSET

PLACED-IN-SERVICE

9.

ITEM

NO.

11.

CATEGORY

CODE

12.

CATCODE

DESCRIPTION

14.

SUST.

CODE

20.

FUND

SOURCE

15.

PRIMARY

UM

18.

SECONDARY UM

QUANTITY

17.

SECONDARY

UM

16.

PRIMARY UM

QUANTITY

19.

COST

23.

ITEM

REMARKS

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

25a. ACCEPTED BY (Typed Name and Signature) b. DATE SIGNED

(YYYYMMDD)

a. TRANSFERRED BY (Typed Name and Signature)

c. TITLE (Area Engr./Base Engr./DPW/Construction Agent)

b. DATE SIGNED

(YYYYMMDD)

c. TITLE (DPW/RPAO) 26. PROPERTY

VOUCHER NUMBER

PREVIOUS EDITION MAY BE USED.̀̀

b. WHEN/EVENT (X one)

7a. PLACED-IN-

SERVICE DATE

(YYYYMMDD)

c. TYPE (X one)

DRAFT INTERIMFINAL

10a.

FACILITY

NO.

AREA OTHER 21.

FUND

ORG

22.

INTER-

EST

CODE

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

Adobe Designer 9.0

10b.

RPUID

13.

TYPE

CODE

The public reporting burden for this collection of information is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, 4800 Mark Center Drive, Alexandria,VA 22350-3100 (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

DD FORM 1354, AUG 2013

27. CONSTRUCTION DEFICIENCIES (Attach blank sheet for continuations) 28. PROJECT REMARKS (Attach blank sheet for continuations)

INSTRUCTIONS

GENERAL. This form has been designed and issued for use in connection with the transfer of military real property between the military departments and to or from other government agencies. It supersedes ENG Forms 290 and 290B (formerly used by the Army and Air Force) and NAVDOCKS Form 2317 (formerly used by the Navy).

Existing instructions issued by the military departments relative to the preparation of DD Form 1354 are applicable to this revised form to the extent that the various items and columns on the superseded forms have been retained. The military departments may promulgate additional instructions, as appropriate.

For detailed instructions on how to fill out this form, please refer to Unified Facilities Criteria (UFC) 1-300-08, dated 16 April 2009 or later.

SPECIFIC DATA ITEMS.

1. From. Name of the transferring agency.

2. Date Prepared. Date of actual preparation. Enter all dates in YYYYMMDD format (Example: March 31, 2010 = 20100331).

3. Project/Job Number. Project number on a DD Form 1391 or Individual Job Order Number.

4. Serial Number. Sequential serial number assigned by the preparing organization (e.g., 2010-0001).

5. To. Name and address of the receiving installation, activity, and Service of the Real Property Accountable Officer (RPAO).

6. RPSUID/SITENAME/INSTCODE/INSTNAME. Site Unique Identifier and name or installation code and name where the constructed facility is located.

7. Contract Number(s). Contract number(s) for this project.

7a. Placed-In-Service Date. RPA Placed In Service Date. This is the date the asset is actually placed-in-service.

8. Transaction Details.

a. Method of Transaction. Mark (X) as many boxes as apply.

b. When/Event. When or event causing preparation of DD Form 1354. X only one box.

c. Type. Draft, interim, or final DD Form 1354. X only one box.

9. Item Number. Use a separate item number for each facility, no item number for additional usages.

10a. Facility Number. Assigned in accordance with the Installation/Base Master Numbering Plan.

10b. RPUID. Identified in Real Property Inventory.

11. Category Code. The category code describes the facility usage.

12. Catcode Description. The category code name which describes the facility usage.

13. Type. Type of construction: P for Permanent; S for Semi- permanent; T for Temporary.

14. Sustainability Code. Reports whether or not an asset meets the sustainability guidelines set forth in Section 2(g) of Executive Order 13514. Valid values are: 1 (asset meets the guidelines); 2 (asset does not meet the guidelines); 3 (asset not evaluated); 4 (asset not subject to guidelines).

15. Area: UM 1. Area unit of measure; use the unit of measure associated with the category code selected in 11.

16. Total Quantity UM 1. The total area for the measure identified in Item 15. Use negative numbers for demolition.

17. Other: UM 2. Unit of Measure 2 is the capacity or other measurement unit (e.g., LF, MB, EA, etc.).

18. Total Quantity UM 2. The total capacity/other for the measure identified in Item 17.

19. Cost. Cost for each facility; for capital improvements to existing facilities, show amount of increase only. If there is no increase for the capital improvement, enter N/A.

20. Fund Source. Enter the Fund Source Code for this item.

21. Funding Organization. Enter the code for the organization responsible for acquiring this facility.

22. Interest Code. Enter the code that reflects government interest or ownership in the facility.

23. Item Remarks. Remarks pertaining only to the item number identified in Item 9; show cost sharing.

24. Statement of Completion. Typed name, signature, title, and date of signature by the responsible transferring individual or agent.

25. Accepted By. Typed name, signature, title, and date of signature by the RPAO or accepting official.

26. Property Voucher Number. Next sequential number assigned by the RPAO in voucher register.

27. Construction Deficiencies. List construction deficiencies in project during contractor turnover inspection.

28. Project Remarks. Project level remarks and continuation of blocks.

DD FORM 1354 (BACK), AUG 2013

DD Form 1354, Transfer and Acceptance of DoD Real Property, August 2013

WHS/ESD/IMD

9.0.0.2.20120627.2.874785 TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY Form Approved OMB No. 0704-0188

PAGE

OF

PAGES

1. FROM (Organization Name)

2. DATE PREPARED

(YYYYMMDD)

3. PROJECT/JOB

NUMBER

4. SERIAL NUMBER

7. CONTRACT

NUMBER(S)

5. TO (Organization - Installation Code and Name)

6. RPSUID/SITENAME/

INSTCODE/INSTNAME

8. TRANSACTION DETAILS

a. METHOD (X all that apply)

ACQUISITION BY CONSTRUCTION

TRANSFER BETWEEN SERVICES

CAPITAL IMPROVEMENT

INVENTORY ADJUSTMENT

PARTIAL ASSET

PLACED-IN-SERVICE

TOTAL ASSET

PLACED-IN-SERVICE

9.

ITEM

NO.

11.

CATEGORY

CODE

12.

CATCODE

DESCRIPTION

14.

SUST.

CODE

20.

FUND

SOURCE

15.

PRIMARY

UM

18.

SECONDARY UM

QUANTITY

17.

SECONDARY

UM

16.

PRIMARY UM

QUANTITY

19.

COST

23.

ITEM

REMARKS

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

25a. ACCEPTED BY (Typed Name and Signature)

b. DATE SIGNED

(YYYYMMDD)

a. TRANSFERRED BY (Typed Name and Signature)

c. TITLE (Area Engr./Base Engr./DPW/Construction Agent)

b. DATE SIGNED

(YYYYMMDD)

c. TITLE (DPW/RPAO)

26. PROPERTY

VOUCHER NUMBER

PREVIOUS EDITION MAY BE USED.̀̀

b. WHEN/EVENT (X one) 7a. PLACED-IN-

SERVICE DATE

(YYYYMMDD)

c. TYPE (X one)

DRAFT

INTERIM

FINAL

10a.

FACILITY

NO.

AREA

OTHER

21.

FUND

ORG

22.

INTER-

EST

CODE

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

Adobe Designer 9.0 10b.

RPUID

13.

TYPE

CODE

The public reporting burden for this collection of information is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, 4800 Mark Center Drive, Alexandria,VA 22350-3100 (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

DD FORM 1354, AUG 2013

27. CONSTRUCTION DEFICIENCIES (Attach blank sheet for continuations)

28. PROJECT REMARKS (Attach blank sheet for continuations)

INSTRUCTIONS

GENERAL. This form has been designed and issued for use in connection with the transfer of military real property between the military departments and to or from other government agencies. It supersedes ENG Forms 290 and 290B (formerly used by the Army and Air Force) and NAVDOCKS Form 2317 (formerly used by the Navy).

Existing instructions issued by the military departments relative to the preparation of DD Form 1354 are applicable to this revised form to the extent that the various items and columns on the superseded forms have been retained. The military departments may promulgate additional instructions, as appropriate.

For detailed instructions on how to fill out this form, please refer to Unified Facilities Criteria (UFC) 1-300-08, dated 16 April 2009 or later.

SPECIFIC DATA ITEMS.

1. From. Name of the transferring agency.

2. Date Prepared. Date of actual preparation. Enter all dates in YYYYMMDD format (Example: March 31, 2010 = 20100331).

3. Project/Job Number. Project number on a DD Form 1391 or Individual Job Order Number.

4. Serial Number. Sequential serial number assigned by the preparing organization (e.g., 2010-0001).

5. To. Name and address of the receiving installation, activity, and Service of the Real Property Accountable Officer (RPAO).

6. RPSUID/SITENAME/INSTCODE/INSTNAME. Site Unique Identifier and name or installation code and name where the constructed facility is located.

7. Contract Number(s). Contract number(s) for this project.

7a. Placed-In-Service Date. RPA Placed In Service Date. This is the date the asset is actually placed-in-service.

8. Transaction Details.

a. Method of Transaction. Mark (X) as many boxes as apply.

b. When/Event. When or event causing preparation of DD Form 1354. X only one box.

c. Type. Draft, interim, or final DD Form 1354. X only one box.

9. Item Number. Use a separate item number for each facility, no item number for additional usages.

10a. Facility Number. Assigned in accordance with the Installation/Base Master Numbering Plan.

10b. RPUID. Identified in Real Property Inventory.

11. Category Code. The category code describes the facility usage.

12. Catcode Description. The category code name which describes the facility usage.

13. Type. Type of construction: P for Permanent; S for Semi- permanent; T for Temporary.

14. Sustainability Code. Reports whether or not an asset meets the sustainability guidelines set forth in Section 2(g) of Executive Order 13514. Valid values are: 1 (asset meets the guidelines); 2 (asset does not meet the guidelines); 3 (asset not evaluated); 4 (asset not subject to guidelines).

15. Area: UM 1. Area unit of measure; use the unit of measure associated with the category code selected in 11.

16. Total Quantity UM 1. The total area for the measure identified in Item 15. Use negative numbers for demolition.

17. Other: UM 2. Unit of Measure 2 is the capacity or other measurement unit (e.g., LF, MB, EA, etc.).

18. Total Quantity UM 2. The total capacity/other for the measure identified in Item 17.

19. Cost. Cost for each facility; for capital improvements to existing facilities, show amount of increase only. If there is no increase for the capital improvement, enter N/A.

20. Fund Source. Enter the Fund Source Code for this item.

21. Funding Organization. Enter the code for the organization responsible for acquiring this facility.

22. Interest Code. Enter the code that reflects government interest or ownership in the facility.

23. Item Remarks. Remarks pertaining only to the item number identified in Item 9; show cost sharing.

24. Statement of Completion. Typed name, signature, title, and date of signature by the responsible transferring individual or agent.

25. Accepted By. Typed name, signature, title, and date of signature by the RPAO or accepting official.

26. Property Voucher Number. Next sequential number assigned by the RPAO in voucher register.

27. Construction Deficiencies. List construction deficiencies in project during contractor turnover inspection.

28. Project Remarks. Project level remarks and continuation of blocks.

DD FORM 1354 (BACK), AUG 2013

Page number of this page.:
Total number of pages.:
1. From (Organization name).:
3. Project/job number.:
4. Serial number.:
5. To (Organization - installation code, name, and service of Real Property Accountable Officer (RPAO)).:
6. Real Property Site Unique Identifier and site name or installation code and name.:
7. Contract number(s).:
8. Transaction details. a. Method. Press space bar to mark X if acquisition by construction.: Off
X if transfer between services.: Off
X if capital improvement.: Off
X if inventory adjustment.: Off
c. Type. X first box if draft, second box if final, or third box if interim.:
9. Item number, line 1 of 10. Use a separate item number for each facility.:
10.a. Facility number. Unique facility number identified in Real Property Inventory.:
10.b. Real property unique identifier.:
11. Category code.:
12. Catcode Description. Code name which describes the facility usage.:
13. Type of construction. P for Permanent, S for Semipermanent, T for Temporary.:
14. Sustainability code. Enter 1, 2, 3, or 4 (see instructions).:
14. Sustainability code. Enter 1, 2, 3, or 4 (see instructions).:
14. Sustainability code. Enter 1, 2, 3, or 4 (see instructions).:
14. Sustainability code. Enter 1, 2, 3, or 4 (see instructions).:
14. Sustainability code. Enter 1, 2, 3, or 4 (see instructions).:
14. Sustainability code. Enter 1, 2, 3, or 4 (see instructions).:
14. Sustainability code. Enter 1, 2, 3, or 4 (see instructions).:
14. Sustainability code. Enter 1, 2, 3, or 4 (see instructions).:
14. Sustainability code. Enter 1, 2, 3, or 4 (see instructions).:
14. Sustainability code. Enter 1, 2, 3, or 4 (see instructions).:
15. Area. Primary unit of measure (use the unit of measure associated with the category code selected in 11).:
16. Area. Primary Unit of Measure Quantity. The total area for the measure identified in item 14. Use negative numbers for demolition.:
Other. 17. Secondary unit of measure. Capacity or other measurement unit (e.g., LF, MB, EA, etc.).:
18. Secondary unit of measure quantity. Total capacity/other for measure identified in item 16.:
19. Cost. Cost for each facility. Show amount of increase only, or N/A.:
20. Fund source. Fund source code for this item.:
21. Funding Organization. Code for organization responsible for acquiring facility.:
22. Interest Code. Code that reflects government interest or ownership in facility.:
23. Item remarks. (Pertaining only to the item number in Column 9.):
9. Item number, line 2.:
10.a. Facility number. Unique facility number identified in Real Property Inventory.:
10.b. Real property unique identifier.:
11. Category code.:
12. Catcode Description. Code name which describes the facility usage.:
13. Type of construction. P for Permanent, S for Semipermanent, T for Temporary.:
14. Area. Primary unit of measure (use the unit of measure associated with the category code selected in 11).:
15. Area. Primary Unit of Measure Quantity. The total area for the measure identified in item 14. Use negative numbers for demolition.:
Other. 16. Secondary unit of measure. Capacity or other measurement unit (e.g., LF, MB, EA, etc.).:
17. Secondary unit of measure quantity. Total capacity/other for measure identified in item 16.:
18. Cost. Cost for each facility. Show amount of increase only, or N/A.:
19. Fund source. Fund source code for this item.:
20. Funding Organization. Code for organization responsible for acquiring facility.:
21. Interest Code. Code that reflects government interest or ownership in facility.:
22. Item remarks. (Pertaining only to the item number in Column 9.):
9. Item number, line 3:
10.a. Facility number. Unique facility number identified in Real Property Inventory.:
10.b. Real property unique identifier.:
11. Category code.:
12. Catcode Description. Code name which describes the facility usage.:
13. Type of construction. P for Permanent, S for Semipermanent, T for Temporary.:
14. Area. Primary unit of measure (use the unit of measure associated with the category code selected in 11).:
15. Area. Primary Unit of Measure Quantity. The total area for the measure identified in item 14. Use negative numbers for demolition.:
Other. 16. Secondary unit of measure. Capacity or other measurement unit (e.g., LF, MB, EA, etc.).:
17. Secondary unit of measure quantity. Total capacity/other for measure identified in item 16.:
18. Cost. Cost for each facility. Show amount of increase only, or N/A.:
19. Fund source. Fund source code for this item.:
20. Funding Organization. Code for organization responsible for acquiring facility.:
21. Interest Code. Code that reflects government interest or ownership in facility.:
22. Item remarks. (Pertaining only to the item number in Column 9.):
9. Item number, line 4.:
10.a. Facility number. Unique facility number identified in Real Property Inventory.:
10.b. Real property unique identifier.:
11. Category code.:
12. Catcode Description. Code name which describes the facility usage.:
13. Type of construction. P for Permanent, S for Semipermanent, T for Temporary.:
14. Area. Primary unit of measure (use the unit of measure associated with the category code selected in 11).:
15. Area. Primary Unit of Measure Quantity. The total area for the measure identified in item 14. Use negative numbers for demolition.:
Other. 16. Secondary unit of measure. Capacity or other measurement unit (e.g., LF, MB, EA, etc.).:
17. Secondary unit of measure quantity. Total capacity/other for measure identified in item 16.:
18. Cost. Cost for each facility. Show amount of increase only, or N/A.:
19. Fund source. Fund source code for this item.:
20. Funding Organization. Code for organization responsible for acquiring facility.:
21. Interest Code. Code that reflects government interest or ownership in facility.:
22. Item remarks. (Pertaining only to the item number in Column 9.):
9. Item number, line 5.:
10.a. Facility number. Unique facility number identified in Real Property Inventory.:
10.b. Real property unique identifier.:
11. Category code.:
12. Catcode Description. Code name which describes the facility usage.:
13. Type of construction. P for Permanent, S for Semipermanent, T for Temporary.:
14. Area. Primary unit of measure (use the unit of measure associated with the category code selected in 11).:
15. Area. Primary Unit of Measure Quantity. The total area for the measure identified in item 14. Use negative numbers for demolition.:
Other. 16. Secondary unit of measure. Capacity or other measurement unit (e.g., LF, MB, EA, etc.).:
17. Secondary unit of measure quantity. Total capacity/other for measure identified in item 16.:
18. Cost. Cost for each facility. Show amount of increase only, or N/A.:
19. Fund source. Fund source code for this item.:
20. Funding Organization. Code for organization responsible for acquiring facility.:
21. Interest Code. Code that reflects government interest or ownership in facility.:
22. Item remarks. (Pertaining only to the item number in Column 9.):
9. Item number, line 6.:
10.a. Facility number. Unique facility number identified in Real Property Inventory.:
10.b. Real property unique identifier.:
11. Category code.:
12. Catcode Description. Code name which describes the facility usage.:
13. Type of construction. P for Permanent, S for Semipermanent, T for Temporary.:
14. Area. Primary unit of measure (use the unit of measure associated with the category code selected in 11).:
15. Area. Primary Unit of Measure Quantity. The total area for the measure identified in item 14. Use negative numbers for demolition.:
Other. 16. Secondary unit of measure. Capacity or other measurement unit (e.g., LF, MB, EA, etc.).:
17. Secondary unit of measure quantity. Total capacity/other for measure identified in item 16.:
18. Cost. Cost for each facility. Show amount of increase only, or N/A.:
19. Fund source. Fund source code for this item.:
20. Funding Organization. Code for organization responsible for acquiring facility.:
21. Interest Code. Code that reflects government interest or ownership in facility.:
22. Item remarks. (Pertaining only to the item number in Column 9.):
9. Item number, line 7.:
10.a. Facility number. Unique facility number identified in Real Property Inventory.:
10.b. Real property unique identifier.:
11. Category code.:
12. Catcode Description. Code name which describes the facility usage.:
13. Type of construction. P for Permanent, S for Semipermanent, T for Temporary.:
14. Area. Primary unit of measure (use the unit of measure associated with the category code selected in 11).:
15. Area. Primary Unit of Measure Quantity. The total area for the measure identified in item 14. Use negative numbers for demolition.:
Other. 16. Secondary unit of measure. Capacity or other measurement unit (e.g., LF, MB, EA, etc.).:
17. Secondary unit of measure quantity. Total capacity/other for measure identified in item 16.:
18. Cost. Cost for each facility. Show amount of increase only, or N/A.:
19. Fund source. Fund source code for this item.:
20. Funding Organization. Code for organization responsible for acquiring facility.:
21. Interest Code. Code that reflects government interest or ownership in facility.:
22. Item remarks. (Pertaining only to the item number in Column 9.):
9. Item number, line 8.:
10.a. Facility number. Unique facility number identified in Real Property Inventory.:
10.b. Real property unique identifier.:
11. Category code.:
12. Catcode Description. Code name which describes the facility usage.:
13. Type of construction. P for Permanent, S for Semipermanent, T for Temporary.:
14. Area. Primary unit of measure (use the unit of measure associated with the category code selected in 11).:
15. Area. Primary Unit of Measure Quantity. The total area for the measure identified in item 14. Use negative numbers for demolition.:
Other. 16. Secondary unit of measure. Capacity or other measurement unit (e.g., LF, MB, EA, etc.).:
17. Secondary unit of measure quantity. Total capacity/other for measure identified in item 16.:
18. Cost. Cost for each facility. Show amount of increase only, or N/A.:
19. Fund source. Fund source code for this item.:
20. Funding Organization. Code for organization responsible for acquiring facility.:
21. Interest Code. Code that reflects government interest or ownership in facility.:
22. Item remarks. (Pertaining only to the item number in Column 9.):
9. Item number, line 9.:
10.a. Facility number. Unique facility number identified in Real Property Inventory.:
10.b. Real property unique identifier.:
11. Category code.:
12. Catcode Description. Code name which describes the facility usage.:
13. Type of construction. P for Permanent, S for Semipermanent, T for Temporary.:
14. Area. Primary unit of measure (use the unit of measure associated with the category code selected in 11).:
15. Area. Primary Unit of Measure Quantity. The total area for the measure identified in item 14. Use negative numbers for demolition.:
Other. 16. Secondary unit of measure. Capacity or other measurement unit (e.g., LF, MB, EA, etc.).:
17. Secondary unit of measure quantity. Total capacity/other for measure identified in item 16.:
18. Cost. Cost for each facility. Show amount of increase only, or N/A.:
19. Fund source. Fund source code for this item.:
20. Funding Organization. Code for organization responsible for acquiring facility.:
21. Interest Code. Code that reflects government interest or ownership in facility.:
22. Item remarks. (Pertaining only to the item number in Column 9.):
9. Item number, line 10.:
10.a. Facility number. Unique facility number identified in Real Property Inventory.:
10.b. Real property unique identifier.:
11. Category code.:
12. Catcode Description. Code name which describes the facility usage.:
13. Type of construction. P for Permanent, S for Semipermanent, T for Temporary.:
15. Area. Primary unit of measure (use the unit of measure associated with the category code selected in 11).:
16. Area. Primary Unit of Measure Quantity. The total area for the measure identified in item 14. Use negative numbers for demolition.:
Other. 17. Secondary unit of measure. Capacity or other measurement unit (e.g., LF, MB, EA, etc.).:
18. Secondary unit of measure quantity. Total capacity/other for measure identified in item 16.:
19. Cost. Cost for each facility. Show amount of increase only, or N/A.:
20. Fund source. Fund source code for this item.:
21. Funding Organization. Code for organization responsible for acquiring facility.:
22. Interest Code. Code that reflects government interest or ownership in facility.:
23. Item remarks. (Pertaining only to the item number in Column 9.):
23. Statement of Completion. a. Transferred by (name).:
Signature.:
c. Title (Area engineer/base engineer/DPW/Construction Agent).:
24.a. Accepted by (name).:
Signature.:
c. Title (DPW/RPAO).:
25. Property voucher number.:
2. Date prepared (4 digit year, 2 digit month, 2 digit day).:
7.a. Placed-in-Service Date (4 digit year, 2 digit month, 2 digit day).:
b. Date signed (4 digit year, 2 digit month, 2 digit day).:
b. Date signed (4 digit year, 2 digit month, 2 digit day).:
26. Construction deficiencies. Attach blank sheet for continuations.:
27. Project remarks. Attach blank sheet for continuations.: