This document is a price schedule for the federal contract opportunity FA500021R0023-JBER MACC. The price schedule outlines the cost to perform repair work on an alternative control tower for fire, electrical, and generator systems at Joint Base Elmendorf-Richardson in Alaska. The single line item on the price schedule is for all work required by the statement of work, specifications, and drawings, with a total construction cost to be provided by the contractor. Work must begin within 10 days of receiving the notice to proceed and be completed within 365 days, including administrative, submittal, material ordering, and construction time. The technical specifications reference is FXSB 20-5254. The proposal is valid until the date written by the contractor. The Multiple Award Construction Contract is a multiple award IDIQ construction contract issued by the Department of the Air Force Pacific Air Forces for repair, alteration, and construction projects at Joint Base Elmendorf-Richardson.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
FXSB 20-5254 Repair Alt Control Tower Fire-Elec-Gen
11525 Slammer Ave.
CONTRACTOR ORGANIZATION ADDRESS
The Contractor shall furnish all design, plant, labor, equipment, supplies, materials, appliances, transportation and perform all work (including work of an incidental nature), for FXSB 20-5254 Repair Alt Control Tower Fire-Elec-Gen, 11525 Slammer Ave., JBER, Alaska, complete, in strict accordance with the Statement of Work and subject to the terms and conditions of the contract.
UNIT TOTAL
ITEM DESCRIPTION QUANTITY UNIT PRICE COST
0001 Repair Alt Control Tower Fire- Elec-Gen 1 EA $__________ $ ___________
Perform all of the above described work complete per the SOW, specifications, and drawing.
TOTAL CONSTRUCTION COST $_______________
Work shall start within 10 days after date of the receipt of the Notice to Proceed, and shall be completed no later than 365 days. This performance period includes administrative time, submittal time, material ordering time, and physical construction time.
TECHNICAL SPECIFICATIONS: FXSB 20-5254
AMENDMENTS ACKNOWLEDGED___________________________
PROPOSAL VALID THROUGH (DATE) ________________________
SIGNATURE DATE SIGNED
Project
For Official Use Only
FA500021R0023-JBER MACC
Attachment 4 - Seed Proj FXSB 20-5254
Price Schedule
For Official Use Only 1
File details come from the government source that posted it. Updated .