Attachment 4 Seed Project FXSB 20-5254 Price Schedule.pdf
PDF 680 KB Posted
- Attached to
- JBER MACC Federal contract opportunity
- Solicitation number
- FA500021R0023
About this file
This document contains a price schedule for federal contract opportunity FA500021R0023 to provide repair and construction services on Joint Base Elmendorf-Richardson in Alaska. The price schedule outlines a single line item with a total estimated price of $___________ to perform all work detailed in the statement of work, including repairing the alternative control tower fire-electric-generator system. Offerors are required to acknowledge any amendments and provide a proposal validity date. The solicitation seeks design-build construction services through an indefinite delivery/indefinite quantity multiple award construction contract for repair, alteration and construction of various real property facilities on the base. The agency issuing this opportunity is the Department of the Air Force Pacific Air Forces.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
FXSB 20-5254 Repair Alt Control Tower Fire-Elec-Gen
11525 Slammer Ave.
CONTRACTOR ORGANIZATION ADDRESS
The Contractor shall furnish all design, plant, labor, equipment, supplies, materials, appliances, transportation and perform all work (including work of an incidental nature), for FXSB 20-5254 Repair Alt Control Tower Fire-Elec-Gen, 11525 Slammer Ave., JBER, Alaska, complete, in strict accordance with the Statement of Work and subject to the terms and conditions of the contract.
UNIT TOTAL
ITEM DESCRIPTION QUANTITY UNIT PRICE COST
0001 Repair Alt Control Tower Fire- Elec-Gen 1 EA $__________ $ ___________
Perform all of the above described work complete per the SOW, specifications, and drawing.
TOTAL CONSTRUCTION COST $_______________
Work shall start within 10 days after date of the receipt of the Notice to Proceed, and shall be completed no later than 365 days. This performance period includes administrative time, submittal time, material ordering time, and physical construction time.
TECHNICAL SPECIFICATIONS: FXSB 20-5254
AMENDMENTS ACKNOWLEDGED___________________________
PROPOSAL VALID THROUGH (DATE) ________________________
SIGNATURE DATE SIGNED
Project
For Official Use Only
FA500021R0023-JBER MACC
Attachment 6 - Seed Proj HJZH 16-2157
Price Schedule
For Official Use Only 1
File details come from the government source that posted it. Updated .